Search Permits
251,201 results
INSTALLATION OF TEMPORARY OVERHEAAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
TEMPORARY SHORING COMPLETED UNDER EMERGENCY ORDER SUPERVISED BY FEU
PROPOSE PROTECTION & MECHANICAL METHODS PLAN FOR PROPOSED RENOVATION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
EXISTING TWO-FAMILY 3-STORY FRAME BUILDING WITH FRONT FACADE RENOVATION WORK ONLY. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
INSTALL 8'-0 HEIGHT WOOD TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT JOB: B01057158-I1
FILING HEREWITH ALTERATION APPLICATION FOR A CONSTRUCTION FENCE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Propose to install non-advertising sign. No change in use, egress, or occupancy.
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
INTERIOR RENOVATON TO NON LOAD BEARING PARTITIONS, FLOORING, CEILING, AND RELATED CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS.
Application to combine Apt #: 316 & 317 (3rd floor) into one Apartment with minor renovation as per plans. No change in use, egress or occupancy in compliance with Technical Policy and Procedure Notice #3/97
General construction as shown on plans filed herewith. No change in use, egress, and occupancy.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS
GENERAL CONSTRUCTION FOR TAQUERIA RENOVATIONS INCLUDING REPLACEMENT OF INTERIOR FINISHES & EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Nicholas Kagios, Special Rigger # 7720
Weather wall on floors 1 -23, as per plans. Filed and fees paid in conjunction with DOBNOW # M01308436-I1. No change to use, egress, or occupancy.
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Remove, replace or install plumbing fixtures in conjunction with GC application #B01323063-I1.
General construction for interior renovation of Apartment 9H on the 10th floor as shown on drawings filed herewith. No change in use, egress, or occupancy.
MINOR REPAIR OF FACADE AS PER PLANS INORDER TO RECTIFY VIOLATION. NO CHANGE IN USE EGRESS OR OCCUPANCY
MODIFICATIONS TO EXISTING 36TH FLOOR MECHANICAL SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
INTERIOR ALTERATIONS OF EXISTING 36TH FLOOR COMMERCIAL OFFICE SPACE TO INCLUDE NON-LOAD BEARING DEMO, PARTITION AND FINISHES WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Installation of solar panels, rooftop, grid tied, railed, 32 modules, 13.12 KW
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
INSTALLATION ON NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME