PermitDig

Search Permits

251,201 results

INSTALLATION OF TEMPORARY OVERHEAAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

1104 PACIFIC STREET, Brooklyn
4KAug 6

TEMPORARY SHORING COMPLETED UNDER EMERGENCY ORDER SUPERVISED BY FEU

518 50 STREET, Brooklyn
50KAug 6

PROPOSE PROTECTION & MECHANICAL METHODS PLAN FOR PROPOSED RENOVATION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.

280 WEST 11 STREET, Manhattan
10KAug 6

EXISTING TWO-FAMILY 3-STORY FRAME BUILDING WITH FRONT FACADE RENOVATION WORK ONLY. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.

27 WEBSTER PLACE, Brooklyn
17KAug 6

Interior demo & reno of non-load bearing partitions, walls, doors, ceiling & finishes as indicated on plans.

461 5 AVENUE, Manhattan
336KAug 6

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

1057 HOE AVENUE, Bronx
1KAug 6

INSTALL 8'-0 HEIGHT WOOD TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT JOB: B01057158-I1

345 BERRY STREET, Brooklyn
0KAug 6

FILING HEREWITH ALTERATION APPLICATION FOR A CONSTRUCTION FENCE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY

1180 6 AVENUE, Manhattan
10KAug 6

Propose to install non-advertising sign. No change in use, egress, or occupancy.

288 EAST 88 STREET, Manhattan
1KAug 6

Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado

166 MONTAGUE STREET, Brooklyn
Aug 6

INTERIOR RENOVATON TO NON LOAD BEARING PARTITIONS, FLOORING, CEILING, AND RELATED CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

748 MADISON AVENUE, Manhattan
300KAug 6

INSTALLATION OF INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS.

300 EAST 93 STREET, Manhattan
Aug 6

Application to combine Apt #: 316 & 317 (3rd floor) into one Apartment with minor renovation as per plans. No change in use, egress or occupancy in compliance with Technical Policy and Procedure Notice #3/97

10 WEST 15 STREET, Manhattan
104KAug 6

General construction as shown on plans filed herewith. No change in use, egress, and occupancy.

200 LIBERTY STREET, Manhattan
11.1MAug 6

INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

557 WEST 185 STREET, Manhattan
9KAug 6

INSTALLATION OF INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS

99-60 63 ROAD, Queens
Aug 6

GENERAL CONSTRUCTION FOR TAQUERIA RENOVATIONS INCLUDING REPLACEMENT OF INTERIOR FINISHES & EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

120 WEST 45 STREET, Manhattan
101KAug 6

FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Nicholas Kagios, Special Rigger # 7720

29 TIFFANY PLACE, Brooklyn
Aug 6

Weather wall on floors 1 -23, as per plans. Filed and fees paid in conjunction with DOBNOW # M01308436-I1. No change to use, egress, or occupancy.

240 GREENWICH STREET, Manhattan
1KAug 6

INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

226 EAST 203 STREET, Bronx
5KAug 6

INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

1341 PLIMPTON AVENUE, Bronx
9KAug 6

FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

114-09 95 AVENUE, Queens
54KAug 6

Remove, replace or install plumbing fixtures in conjunction with GC application #B01323063-I1.

98 80 STREET, Brooklyn
46KAug 6

General construction for interior renovation of Apartment 9H on the 10th floor as shown on drawings filed herewith. No change in use, egress, or occupancy.

626 EAST 20 STREET, Manhattan
17KAug 6

MINOR REPAIR OF FACADE AS PER PLANS INORDER TO RECTIFY VIOLATION. NO CHANGE IN USE EGRESS OR OCCUPANCY

393 ROGERS AVENUE, Brooklyn
14KAug 6

MODIFICATIONS TO EXISTING 36TH FLOOR MECHANICAL SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS

780 3 AVENUE, Manhattan
70KAug 6

INTERIOR ALTERATIONS OF EXISTING 36TH FLOOR COMMERCIAL OFFICE SPACE TO INCLUDE NON-LOAD BEARING DEMO, PARTITION AND FINISHES WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS

780 3 AVENUE, Manhattan
100KAug 6

Installation of solar panels, rooftop, grid tied, railed, 32 modules, 13.12 KW

144-75 176 STREET, Queens
66KAug 6

INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.

137-42 218 STREET, Queens
92KAug 6

INSTALLATION ON NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME

46 HUNTER AVENUE, Staten Island
31KAug 6