Search Permits
247,466 results
Express: Foundation repair
gas test to eventually connect gas to meter .
ETJ- New Construction of SFR
Replace windows like for like. Existing Office (See 2026-118284 DA).
Interior renovation of a two-story multi-family building. Convert existing tubs to showers replace all existing counter tops cabinets and fixtures and equipment with new. Replace all existing gypsum boards with new. Replace all existing doors with new in existing multifamily.
Electrical for EV charger in garage.
Remove and replace shingles on existing roof shingle replacement only.
ePlan: BAUS Review - Interior Remodel on Apron Level for Southwest Airlines (3900 SF).
Total demo of detached garage 900 sqft circa 1949
Replacement of an existing water heater REPLACING GAS TANKLESS OUTDOOR WATER HEATER LIKE FOR LIKE
Upgrade main service to 350amps
Unit1B New construction of 3-Story Single Family Res [5bed 4.5bath]
Replacement of complete existing central heat and air system with or without duct work 1 system: 3 Ton 18 Seer2 Variable Speed Heat Pump Side Discharge Condenser evaporator coil and gas furnace
UNIT #86 We will make a repair to the existing 3-inch drain line that was found leaking after the foundation was raised by the foundation company. The affected section of piping is currently exposed on both sides allowing access to the repair area.
Full tear-off of existing roofing to structural deck (like-for-like reroof). Install fully adhered 60-mil TPO membrane over two layers 2.2 polyiso insulation (4.4 R-25.2 min). Flash RTU curbs/penetrations; ES-1 perimeter metal. No structural MEP or footprint changes.
Total demo of SFR 1008 sq ft circa 1948 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
Replacement of complete existing central heat and air system with or without duct work Unrath
New construction of 2 story single family dwelling with 4 bedrooms and 3.5 baths 2 car garage rear patio and front porch PUD
New 2-story SFR; 5 Bed 3 Baths with 2-car garage and covered patio
ETJ new service for SFR
Connect mobile home with 4x4 deck
Remove and replace shingles on existing roof shingle replacement only.
New construction of 2-story single family dwelling with 4 bedrooms and 3.5 baths 2 car garage rear patio and front porch PUD
Construct new driveway approach of 17 FT
ePlan: Commercial Expedited Review - First Time Finish Out for The Twelve Thirty Club (38623 SF).
ePlan: Commercial Expedited Review Interior Remodel to Parking Garage for New Mechanical Room to be used for Chilling Units to Serve Building 2 Lab No Access Control No Plumbing (363566 SF)
Express- Replace 25 windows like for like in existing residence
Replacing a 150 amp disconnect like for like. Burnt up busbar
[ETJ] New Construction of SFR (sq ft 2277)
Install generator