PermitDig

Search Permits

251,201 results

INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

1475 ST MARKS AVENUE, Brooklyn
9KAug 7

INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.

882 MORRIS AVENUE, Bronx
Aug 7

INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

1104 PACIFIC STREET, Brooklyn
0KAug 7

INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.

563 2 AVENUE, Manhattan
4KAug 7

INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

35-25 78 STREET, Queens
1KAug 7

Installation of suspended scaffold for facade work or inspection.

411 5 AVENUE, Manhattan
Aug 7

INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

818 AVENUE V, Brooklyn
4KAug 7

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

94-24 55 AVENUE, Queens
8KAug 7

PROPOSED INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW ALTERATION JOB B01431309-I1. NO CHANGE OF USE, EGRESS, OR CERTIFICATE OF OCCUPANCY.

303A 16 STREET, Brooklyn
3KAug 7

Installation of Solar PV system with no changes to egress, use or occupancy

22 JOSEPHINE STREET, Staten Island
44KAug 7

INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

427 7 AVENUE, Manhattan
0KAug 7

INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

77 4 AVENUE, Brooklyn
0KAug 7

INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

240 EAST 15 STREET, Manhattan
10KAug 7

INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

818 AVENUE V, Brooklyn
4KAug 7

INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.

249 EAST 31 STREET, Manhattan
4KAug 7

Installation of a heavy duty sidewalk shed

111 JOHN STREET, Manhattan
5KAug 7

FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

388 ARDEN AVENUE, Staten Island
50KAug 7

INSTALLATION OF TEMPORARY PIPE & SYSTEM SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

818 AVENUE V, Brooklyn
0KAug 7

INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.

571 2 AVENUE, Manhattan
4KAug 7

EQUIPMENT USE: SINGLE 6000 # CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY

16 CONVENT AVENUE, Manhattan
10KAug 7

INSTALLATION OF TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY

1104 PACIFIC STREET, Brooklyn
0KAug 7

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

9602 FLATLANDS AVENUE, Brooklyn
1KAug 7

convert from oil to gas, install 2 gas boilers and 2 water heaters in existing boiler room for the 2 family house with C of O No. 210468.

2678 EAST 28 STREET, Brooklyn
15KAug 7

INS

297 COLUMBIA STREET, Brooklyn
5KAug 7

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

99 JANE STREET, Manhattan
1KAug 7

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

218 MYRTLE AVENUE, Brooklyn
1KAug 7

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

1515 NEW YORK AVENUE, Brooklyn
1KAug 7

INSTALLATION OF PLYWOOD FENCE AS PER PLANS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

165 WILLIAM STREET, Manhattan
3KAug 7

SIGN TAG AS NON-ILLUMINATED F.C.O. LETTER SIGN 1 @ CLAREMONT AVE FACADE ELEVATION- IDENTIFYING THE NAME OF THE BUILDING AS THE ROY AND DIANA VAGELOS SCIENCE CENTER

3009 BROADWAY, Manhattan
1KAug 7

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

595 BALTIC STREET, Brooklyn
15KAug 7