Search Permits
251,201 results
Construct South two-family dwelling per plan. (Establish use as attached housing units per land use code. Construct (2) two family dwellings per plan. Review and processing for 2 records under 7113442-CN).
Construct new two-family dwelling per plan. (Establish use as single family residence with attached and detached accessory dwelling units per land use code. Construct new one- and two-family dwellings per plan. Review and processing for two records under 7008048)
Demolish existing one family dwelling and accessory structures per plan.
Construct alterations to existing office building (Seattle Justice Center) subject to field inspection.
Construct interior alterations to one family dwelling subject to field inspection STFI.
Alterations to existing dwelling unit (remove balcony/French door replace with window) to existing dwelling unit Subject To Field Inspection.
Establish use for two-unit townhouse per land use code. Construct multifamily building occupy per plan.
Construct addition and alterations to existing one-family dwelling subject-to-field inspection (STFI).
Construct tenant improvements to existing commercial building at ground floor SW suite (Paris Baguette bakery) (interior Soft Demo only) Subject to field inspection.
Demolish existing single family residence subject to field inspection (STFI)
Change Use from institution (museum) to general retail sales (shoe store) at the first and second floor of existing building occupy per land use code.
Construct tenant improvements to concession area of IMAX theater per plan. Mechanical included this permit.
to obtain final inspection for work approved udner pa#: 202309086215. all work is complete.
remove/rebuilt (e) balcony w/ new in-kind at rear of house (33'x4')
to obtain final inspection for work approved under pa# 201805189534. all work is complete.
replace existing gas furnaces with electric heat pump split systems. replace existing gas water heater with heat pump water heater.
revise foundation details for p/a #2025-1205-1094 to reflect the need for a 5'-6" =/- tall retaining wall.
to obtain final inspection for work approved under pa # 202108166496, 202209092157 all work is complete
to obtain final inspection for wark approved ubder pa # 200905188574, 201905150690, 202011098492, all work completed
rev to bpa 201904016779 to add state adu unit 1066a and remodel units 1066,1068,1070 as follows: relocate and update gathroomsand kitchens.improve common areas including new garbage area, utility and meter upgrades gas,electrical,upgrade entrance to lower two units1066-1066a to code.infill existing
to comply w/ complaint# 202657003: restore the (e) building from one dwelling unit back to two dwelling units, w/ one unit per floor. interior remodel of 3rd floor kitchen area. no work on the 1st floor. all work shall be performed within (e) building footprint. no change to building envelope.
remodel 1 bathroom, all fictures to remain in same location, update electrical sub panel, and install new furnace in garage (replacement). kitchen remodel, new counter tops, sink and faucet
to obtain final inspection for work approved under pa# 202201065481. all work is complete.
to obtain final inspection for work approved under pa# 202201065479. all work is complete.
to obtain final inspection for work approved under pa# 202009033418, 202108257144 and 202201065480. all work is complete.
to obtain final inspection for work approved under pa# 202009023322, 202108257142 and 202201065477. all work is complete.
full remodel (e) 3 story bldg. (n) cantilever decks w/ sliding doors. infill (e) lightwell and replace front window & exterior wall finishes. remodel 1st flr space to (n) family w/ bathroom & wetbar. 2nd: create master suite and laundry. 3rd: remodel kitchen bathroom, lightwell infill. and skylights
legalize completed kitchen and 3 bathroom remodels like for like remodels. replace 5 windows same size and openings, back of bldg, non street facing. no wall relocations and no structual work. no tub to shower conversions.
revision to pa#: 202507301951. add (n)bath, bar/storage, and (n) multi purpose rooms at the garage level. new radiant heat system.
revision to pa# 201809170527. to complete substaintial renovation: bring new condominium units up to code, correct cumulative defects discovered during work progress. structural stiffening at roof level. roof replacement. renovat service area on level 1. new access door to replace window at lower