Search Permits
251,201 results
bathroom remodel, new sink, new toilet, new vanity, new tiles, replace 2 windows back of property in bathroom : in kind in existing openings, non street facing, new sheetrock installation and new heater flooring in bathroom. no tub conversions, like for like remodel of bathroom, approx. 40 sq ft.
address correction to change permit 202608066212 from 1583 to 1585 8th ave
fire only: evacuation maps for 2nd and 3rd floors
structural revision for side extension at garage foundation structural. structural sheets have been revised by the engineer to reflect updated fndation design and structural 202507150842. refer to detail foundation design & structural details. 1/so.1 & 51/so.2 new s.o.g at garage & bedroom at front.
hallway, dining, and living room: replacement of drywall in kind. ~1400 sqft
kitchen remodel to remove walls, remove and replace countertops, adding columns, new windows, adding mep fixtures. removing installed door between ktichen and living room, enlarged garage door. jadu on seperate application.
as built in ref#: 202407297494. updated plans with new elevator checklist . deleted smokes for elevator recall. device locations updated to match what's in filed. annuciator, storage notiification
remodel to (e) single family residence. exterior changes including 1 rear door replacement, remodel kitchen. mep system systems will be upgraded as required per code. new lighting throught remodeled areas.
interior remodel,reconfiguration,lower level square footage addition,foundation & seismic upgrade.slab of(e)lower level 2-car tandem garage to be lowered and partially converted to interior living space with bedroom/bath,living space &kitchenette.
2/f: bathroom remodel in kind. no alterations to framing or any structural. bathtub to new shower stall, floor, and wall tiles, vanity, fixtures.
rev to pa# 2022-0307-9381: replacement of superseded sffd pre application meeting notes & addition of sffd reference forms revised pre application meeting notes dated 7/9/2026. indicatrs approved alternate access door/panel at freight elevater hoistway.
core & shell improvements, enlarged storefront opening, demising wall utility upgrades.
unit 1- kitchen and bathroom interior remodel on ground floor to include no structural walls affected. includes plumbing, electrical work and interior only.
provide excavation sequence and shoring to accomodate foundation installation.
permeation group to accommodate foundation installation at 1528 11th ave- ref 2026003097143. ref shoring permit 202607165150
ti for relocated fedex office store.change of occupancy from m to b. work includes new finishes, graphics, lighting, ceiling, new plumbing fixtures, new and relocated fixtures and equipment and distribution of phone and data/power to equipment. new mechanical, electrical and plumbing work.
barrier removal. path of travel and exit access improvements in basement parking garage levels b1,b2, and b3.
to obtain final inspection for work approved under pa#: 202503071771. all work is complete.
plumbing work t.i. on the 6th flr. ref#: 202605121069
to obtain final inspection for work approved under pa: 202409050175. all work is complete.
6th fl - revision to 202512222450 installation of life safety seismic requirements for new (2) 1 person and (1) 2 person phone booths in an existing office total of 3 phone booths full restroom remodel included
kitchen remodel of all cabinets and appliances. no wall removal or layout change in kind remodel.
5th floor: mep deffered under 202606082732. mch: demo & revise existing ductwork & diffusers to accomodate new floor plan layout. finish & install new duct & diffusers to accomodate new layout. elec.: office ti retrofit-lighting fixtures & associated circuiting/controls, poser & signal.
solar permit: mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | residential ess installation, interconnecting with main panel to act as back up. existing solar on site a
2/fl- divide (e) bathroom into (1) full bathroom and (1) powder room.
front replacement 6 windows vinyl in-kind. max u-factor 0.27. repair dryrot stucco at front less than 50% in-kind of area. no other work performed.
to obtain final insepction for work approved under 202311271381. all work is complete
bathroom remodel, replace in kind, no fixture move.
removal of interconnecting non egress stair and structural slab infill between floors 4 and 5. north suite (suite 400) scopes include demo of non structural partitions, ceilings, finishes, mep. new paint and general lighting throughout to prepare suite for marketing. no occupancy at the end of the
10th fl deferred electrical under pa 202604280192/202607285653 new lighting, power & signal & branch circuiting