PermitDig

Search Permits

19,020 results · type: electrical

Electrical

55 Fruit ST, Boston
5KMay 12

Electrical

84 Esmond ST, Dorchester
10KMay 12

Electrical

100 Terminal RD, East Boston
200KMay 12

Electrical

200 Terminal RD, East Boston
54KMay 12

Electrical

107-109 Willow ST, West Roxbury
5KMay 12

Electrical

300 Longwood AV, Boston
70KMay 12

Electrical

730 William T Morrissey BL, Dorchester
5KMay 12

Electrical

138 Mount Vernon ST, West Roxbury
1KMay 12

Electrical

8B Allstate RD, Dorchester
22KMay 12

Electrical

25 Undine RD, Brighton
10KMay 12

Electrical

62 Rosewood ST, Mattapan
8KMay 12

Electrical

60 State ST, Boston
11KMay 12

Electrical

13-17 Oxford ST, Boston
4KMay 12

Electrical

1-27 Boston Wharf RD, Boston
100KMay 12

Electrical

30 E Springfield ST, Roxbury
2KMay 12

Electrical

21 Helena RD, Dorchester
7KMay 12

Electrical

645 Summer ST, Boston
50KMay 12

Electrical

167 Russett RD, West Roxbury
30KMay 12

Electrical

149 Newbury ST, Boston
481KMay 12

Electrical

420 Huntington AV, Boston
10KMay 12

Electrical

219 E ST, South Boston
3KMay 12

Electrical

19 Courtland RD, Mattapan
4KMay 12

Electrical

200 Saint Thomas More RD, Brighton
6KMay 12

Electrical

33-59 Congress ST, Boston
66KMay 12

Electrical

640-750 Atlantic AV, Boston
5KMay 12

PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AN

3130 S VALLE VERDE CIR, Mesa
May 12

INSTALLATION OF A NEW 240 VOLT 40 AMP DEDICATED CIRCUIT BREAKER FOR ENPHASE HCS-40 LEVEL 2 HARD-WIRED EV CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ENPHASE HCS-40 SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND THE ELECTRICAL SHALL COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.

2046 N 89TH ST, Mesa
May 12

Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.

1928 E JARVIS AVE, Mesa
May 12

Need to connect power back on, tenant was out for 1year

1331 Mandeville St, New Orleans
May 12

No Power Over Six Months

13034 Deauville Ct, New Orleans
May 12