Search Permits
247,466 results
unknown
unknown
unknown
unknown
(N) One-Story Sfd With Attached Garage, Septic System, And Irrigation Well.
Complete Demolition And In-Kind Replacement Of (E) Rear Elevated Wood Deck. No Change To Dwelling, Footprint, Floor Area, Height Or Use.
Legalize A D U - A B-2533 B W O P Related
Detached One-Story A D U
Install one Non Illuminated Monument Sign PECOS CROSSING. 42.50 sq ft.
INSTALLATION OF 12-FT11-IN OF 1.2-IN PE GAS LINE BURIED 18-IN WITH 18 GAUGE TRACER WIRE FROM EXISTING 3.4-IN GAS STUB TO 38K BTU GRIDDLE & 8-FT OF1.2-IN PE GAS LINE TO 31K BTU GRILL. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & SW GAS REQUIREMENTS. SW GAS TO DETERMINE IF THE METER NEEDS TO BE UPGRADED.
Group M occupancy. Type II-B construction. 3,000 SF. Occupant load 42. Demo marked portion of demising wall to give space to adjacent suite. Demo storefront system, storefront column, partition walls, plumbing fixtures, floor drains, electrical panel, portion of slab for electrical trenching, soffit and columns, existing RTUs, mechanical ducting, electrical lighting, and ceiling. New 1-hr rated demising wall at storage area. New partition walls to create storage area, ADA compliant restroom, and
INSTALLATION OF 12.1-FT X 34.1-FT 2026 CAVCO TUSCANY PARK MODEL WITH AC IN REAR. VIN NO. CFPUS3440T1211389. NO GAS OR LP TANKS. NO AWNING. NO OTHER ACCESSORY STRUCTURES AT THIS TIME. MINIMUM ONE 9-FT X 18-FT UNOBSTRUCTED PAVED PARKING REQUIRED BEHIND FRONT SETBACK ON 2-IN ASPHALT OR 4-IN CONCRETE. 33-FT X 48-FT INTERIOR LOT. MINIMUM SETBACKS ARE 5-FT MIN MEASURED FROM EDGE OF ASPHALT, 3-FT REAR FOR INTERIOR LOTS, 18-IN SIDES FOR LOTS LESS THAN 35-FT WIDE. APPROVED AS NOTED.
Master Bathroom renovation of shower area. No structural change.
Install 2019 NFPA 72 manual fire alarm system with notification and initiation devices for an existing facility.
Install 1 set single faced 5" deep LED illuminated cabinet with routed and push-through copy on south elevation of suite WETZELS PRETZELS 17 sq. ft. Signs shall be installed per NEC 2023 with UL listed components.
mechanical_hvac
mechanical_hvac
construction_loop
electrical_service_/_circuit_/_feeder
electrical_service_/_circuit_/_feeder
electrical_service_/_circuit_/_feeder
electrical_service_/_circuit_/_feeder
electrical_service_/_circuit_/_feeder
renovation_(structural)
temporary_generator
electrical_service_/_circuit_/_feeder
electrical_service_/_circuit_/_feeder
electrical_service_/_circuit_/_feeder
electrical_service_/_circuit_/_feeder
mechanical_fuel_gas