Search Permits
250,633 results
plumbing
electrical
plumbing
electrical
electrical
electrical
electrical
building
plumbing
TEMPORARY ROOF / OVERHEAD PROTECTION AT THE ADJOINING PROPERTIES DURING NB CONSTRUCTION FILED SEP. ROOF / OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OREGRESS UNDER THIS APPLICATION.
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF PIPE SCAFFOLD AT 1649 BRONXDALE AVENUE BRONX, NY AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Mechanical modifications taking place on the 1st floor and cellar as per plans filed herewith. No change in use, egress or occupancy
TEMPORARY SHORING AS PER DRAWINGS. SHORING SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Use of equipment listed to process debris on ground as per plans filed herewith.
Suspended scaffold in order to perform exterior facade repairs and periodic inspections. Inspections to be conducted by EOR. Sidewalk shed filed under separate application. No change in use, occupancy or egress under this application.
INSTALLATION OF INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS.
Suspended scaffold in order to perform close-up inspections. No change in use, occupancy or egress under this application.
INSTALLATION OF A TEMPORARY ROOF PROTECTION SYSTEM AS PER PLANS DURING NB CONSTRUCTION AT THE ADJACENT BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
INSTALLATION AND USE OF TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INDUSTRIAL ROPE ACCESS INITIAL CD5 FOR FISP INSPECTION
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Suspended scaffold in order to perform exterior facade repairs and periodic inspections. Inspections to be conducted by EOR. Sidewalk shed filed under separate application. No change in use, occupancy or egress under this application.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF PIPE SCAFFOLD AT 1610 MATTHEWS AVENUE BRONX, NY AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
SUSPENDED SCAFFOLD PLANS FOR FACADE REPAIRS AND INSPECTIONS
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.