Search Permits
250,633 results
MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
INSTALLATION OF GREASE EXHAUST WELLS VENTLESS HOOD IN BASEMENT
INSTALLATION OF TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. SIDEWALK SHED AND PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Installation Of Temporary Single Personnel hoist As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
TEMP CONSTRUCTION FENCE FILED IN CONJUNCTION WITH DOB NOW GC JOB M01294097-I1
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
OUTRIGGERS SYSTEM INSTALLATION FOR FACADE REPAIRS, NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
EQUIPMENT USE: INSTALLATION OF DUAL 6742# CAPACITY PERSONNEL HOISTS DURING NB FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUB TO ELEV DEPT.
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION
Installation of 312.4 kw solar energy system on roof. No change of occupancy, use or egress.
INSTALLATION OF CURB CUT AS PER THE PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
DIRECT REPLACE 2 HVAC (10 TOTAL) RTU ON ROOF THAT SERVE FIRST & SECOND FLOOR UNITS OF: 44-35/44-39 DOUGLASTON PARKWAY
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
Install of temp truss towers, no alt to exist structures for Summer Streets. A TPA is not req'd. Producer is responsible to monitor site safety. All production equipment removed upon event completion
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
DIRECT REPLACE 2 HVAC (10 TOTAL) RTU ON ROOF THAT SERVE FIRST & SECOND FLOOR UNITS OF:44-41/44-43 DOUGLASTON PARKWAY
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
PROPOSED MECHANICAL WORK AT FIRST FLOOR RETAIL. WORK AS PER PLAN. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT FOR FACADE INSPECTIONS AND / OR REPAIRS.
DIRECT REPLACE TWO HVAC (10 TOTAL) RTU ON ROOF THAT SERVE FIRST & SECOND FLOOR UNITS OF:44-29/44-33 DOUGLASTON PARKWAY