CONSTRUCT TENANT IMPROVEMENT TO THE SOUTHWEST PORTION OF LEVEL 13 OF AN EXISTING 36-STORY OFFICE BUILDING FOR OFFICE USE SUBJECT TO FIELD INSPECTION STFI
We are removing the current composition shingles down to the decking. We will replace decking as needed but no planned replacement at this time. We will then install new underlayment and new composition shingles. No structural changes. We are doing both A&B units.
Construct alterations to existing one family dwelling per plan.
Construct east duplex per plan (Establish use as Single family dwelling and two unit townhouse per land use code. Construct as a two-family and a one-family dwelling; review and process for two records under 7081133-CN)
Establish use as housing for one detached dwelling units per land use code. Existing one family dwelling to remain. Construct new one family dwelling per plan. Project includes removal of detached garage.
Change of use from retail to restaurant per the land use code. Construct alterations for same occupy per plan.
Construct West middle one family dwelling (SFR C) per plan. (Establish use as detached housing units per land use code. Construct 4 one family dwellings per plan. Review and processing for 4 records under 7120309-CN)
Construct NE one family dwelling (SFR B) per plan. (Establish use as detached housing units per land use code. Construct 4 one family dwellings per plan. Review and processing for 4 records under 7120309-CN)
Construct East middle one family dwelling (SFR D) per plan. (Establish use as detached housing units per land use code. Construct 4 one family dwellings per plan. Review and processing for 4 records under 7120309-CN)
mechanical
mechanical
mechanical
electrical
plumbing
mechanical
mechanical
electrical
mechanical
electrical
mechanical
plumbing
electrical
IRA Facade Inspection
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
INSTALLATION DESIGN AND USAGE OF SUSPENDED SCAFFOLD SYSTEM AS PER DRAWINGS. SUSPENDED SCAFFOLD SYSTEM SHALL BE INSTALLED AT CATWALK - BULKHEAD LEVEL. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT FOR FACADE INSPECTIONS AND REPAIRS. NO CHANGES IN THE EGRESS.