Search Permits
167,904 results
Callahan 830-P-L Is a New one-story single family residence with (4) bedrooms (2) bathrooms an attached two-car garage and a covered entry porch and patio.
ePlan: BAUS - First Time Finish out of New Airline Lounge (20500 SF)
Replacement of complete existing central heat and air system with or without duct work Install new 3.5-Ton Goodman 14.3-SEER Electric AC & Gas Heating System
Installation of underground fireline and riser
Sanitary sewer ejection pump re-location.
Replacement of complete existing central heat and air system with or without duct work Replacing ac at Bridge at Terracina Unit #09245
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [4bed 3.5bath] with Attached Carport. Bldg 5
Replacing 13 ft of mainline under slab in tunnel. Also replacing up to 25 feet of exterior sewer line.
New construction two-story SFR with 4 bed 3.5 bath
Sanitary sewer ejection pump re-location.
Unit 101 Bldg 1: New 3-story townhome with 3 bedroom 3.5 bathroom balcony attached 2-car carport. Part of 3-unit townhome building in 3-unit use. (9 units on 3 properties sharing 1-driveway utilizing a flag-lot configuration)
Unit 102 Bldg 1: New 3-story townhome with 3 bedroom 3.5 bathroom balcony attached 2-car carport. Part of 3-unit townhome building in 3-unit use. (9 units on 3 properties sharing 1-driveway utilizing a flag-lot configuration)
New construction two-story SFR with 4 bed 3.5 bath
Bldg 101: New 3-story townhome unit with 3 bedroom 3.5 bathroom covered patio attached carport. Part of 3-unit townhome under 3-unit use.
Installation of 42.275 kW roof mounted solar system + 2 PW3s + 1 PW3 Expansion Pack
ePlan: Residential Expedited Review - New construction of a 1-Story Single Family Res. [5bed 4bath] with Attached Garage.
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A582 New 2 story attached unit with 2 bedrooms 2.5 bathrooms and a 2 car garage.
New construction of 2 story sfr with 4 beds 3 baths 2 car garage and covered patio
200amp OH service build
Express: window replacement (like for like); repair and replace drywall; interior electrical wiring for light fixtures outlets and switches REVISION 1: Add MP for new range hood/kitchen exhaust vent PP for new shower pan
ePlan: Commercial Expedited Review - Change of Use for Existing Retail space to Allow for Alcohol/Food Sales. (2960 SF)
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Replacement of complete existing central heat and air system with or without duct work HVAC changeout/alteration: Remove and replace the existing 3-ton vertical gas split system (air handler/furnace and outdoor condenser) on a like-for-like basis; no structural change.
We will be installing a sprinkler system
Replacement of complete existing central heat and air system with or without duct work 2.5ton Gas Comfort Replacement
Provide electrical for service upgrade and bring up to code per nec requirements.
Temporary power panel ref: 2025 091605 BP
install/replace 200 amp main breaker panel and meter can (underground)
Construct new driveway approach of 17 FT and sidewalk of 21.2 LF
Unit 103 Bldg 1: New 3-story townhome with 3 bedroom 3.5 bathroom balcony attached 2-car carport. Part of 3-unit townhome building in 3-unit use. (9 units on 3 properties sharing 1-driveway utilizing a flag-lot configuration)