Search Permits
250,633 results
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
installation of construction fence to protect site during full demolition
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF A HEAVY DUTY OVERHEAD PROTECTION AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
FACADE RESTORATION, INSPECTIONS
INSTALLATION OF TEMPORARY PIPE & SYSTEM SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Replacement of air conditioning units on 11th Floor. no change in use, egress or occupancy.
INSTALL TEMPORARY 8 FEET HIGH CONSTRUCTION FENCE
INSTALLATION AND USE OF TEMPORARY SHORING EQUIPMENT FOR FIRE ESCAPE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Install illuminated wall sign reading CVS pharmacy
INTERIOR & EXTERIOR RENOVATION OF AN EXIST.MIXED BUILDINGS WORK ON 1ST FLOOR AND ROOF WITH NEW PARTITIONS, DOOR ,REPLACE STOREFRONT, REPAIR FLOOR , CEILING, PAINTING AND INSTALL EXHAUST FAN ON ROOF, NO CHANGE IN USE, EGRESS OR OCCUPANY.
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - SPEAR. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Interior renovation work for Jelly Cat space in the FAO Schwartz store on 1st floor to include new partitions, finishes, counter and display areas. No change to use, egress or occupancy is involved.
Seasonal pergola accessory to Tavern on The Green on the south terrace.
sprinkler modifications taking place on the 8th fl per plans filed herewith. no change in use, egress or occupancy.
Installation of suspended scaffold for facade inspection/repair.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
THIS JOB IS FILED FOR CONSTRUCTION FENCE FOR CONSTRUCTION WORK AT 133-53 ROOSEVELT AVENUE, QUEENS NY 11354 DOB JOB#Q01434259-I1
Plumbing demolition work including bathrooms, pantries, first floor kitchens. Replace with bathrooms and pantries on certain floors. No change of use, no change of egress, no change of occupancy proposed under this application.
REMOVAL OF FUEL TANK AND REPLACE WITH (2) 275 GALLON FUEL OIL TANKS.
INTERIOR & EXTERIOR RENOVATION OF AN EXIST.MIXED BUILDINGS WORK ON 1ST FLOOR AND ROOF WITH NEW PARTITIONS, DOOR ,REPLACE STOREFRONT, REPAIR FLOOR , CEILING, PAINTING AND INSTALL EXHAUST FAN ON ROOF, NO CHANGE IN USE, EGRESS OR OCCUPANY.
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NB APPLICATION FOR NEW BUILDING.
TEMPORARY CONSTRUCITON FENCE
PROPOSED INSTALLATION OF A 30' CURB CUT ON EAST 59TH STREET. NO CHANGES IN USE, EGRESS OROCCUPANCY.
Replacement of (2) existing air rotation units.
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
REPAIR MASONRY FACADE, INSTALL NEW STEEL LINTELS AND PRECAST STONES. RECONSTRUCT SECTIONS OF PARAPET WALLS AS PER DRAWINGS FILE HEREWITH. NO CHANGE IN USE OR MEANS OF EGRESS.
Install temp stage, platforms, trussing. No alt to exist structures for Citi Field Summer Concerts.. TPA permit required each show. Producer responsible to monitor site safety & implement HWAP. All prod equip removed upon completion.