Search Permits
249,120 results
Please do not request inspections under this permit until 2 business days after permit issuance.Rewire 2-bathrooms, 1-livingroom, & 2-bedrooms, hallway, laundry.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of 200A Backup Gateway for Energy Storage System, Service Conductor Refeed
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a CCTV system with hw done cameras (6), one 8channel CSVR
Revision - Installation of TESLA Powerwall back-up storage, Potomac Edison Work-with, Meter#S313607168, New Main Breaker EnclosurePlease do not request inspections under this permit until 2 business days after permit issuance.New Main Breaker Enclosure
Please do not request inspections under this permit until 2 business days after permit issuance.To wire new home.
Please do not request inspections under this permit until 2 business days after permit issuance.New Main Breaker Enclosure
Please do not request inspections under this permit until 2 business days after permit issuance.Final connection to existing electrical for one (1) wall sign for Alpha Core
Please do not request inspections under this permit until 2 business days after permit issuance.Inverter swap, same model
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a burglary system with hw devices, panel and wired touchpad.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation addon of one hardwired outdoor camera.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (39) ROOF MOUNTED SOLAR PANELS, (39) MICRO INVERTERS, ONE 80A LINE SIDE TAP, 17.160 KW
Please do not request inspections under this permit until 2 business days after permit issuance.Installation add-on of two outdoor cameras.
Please do not request inspections under this permit until 2 business days after permit issuance.SFD/ REPLACE EXISTING MAIN SERVICE PANEL. 200AMP SERVICE
Please do not request inspections under this permit until 2 business days after permit issuance.HEAVY UP OF 200AMP
Please do not request inspections under this permit until 2 business days after permit issuance.Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a burglary system with hw devices, panel, and wired touchpads.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of 22 roof mounted solar panels.
Please do not request inspections under this permit until 2 business days after permit issuance.Complete service upgrade from 100amps to 200amps.
Please do not request inspections under this permit until 2 business days after permit issuance.Temporary removal and reinstallation of 26 roof-mounted solar panels.
Please do not request inspections under this permit until 2 business days after permit issuance.Install New Service 400 Amps, Two Panel 200 Amps and New wiring and Low Voltage
Please do not request inspections under this permit until 2 business days after permit issuance.REPLACE METER BASE FROM 200 AMP TO 400 AMP, REPLACE 2/200 AMP SERVICE PANELS LIKE FOR LIKE. 2 NEW SERVICE DISCONECTS 200 AMP. EXISTING GENERATOR AND TRANSFER SWITCH.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of 26 roof mounted solar panels.
Please do not request inspections under this permit until 2 business days after permit issuance.The installation of a 30 amp circuit for an electric water heater.
Please do not request inspections under this permit until 2 business days after permit issuance.50amp circuit for EV charging outlet in the garage
Please do not request inspections under this permit until 2 business days after permit issuance.Replacing overhead power line with new under ground line. Design will be completed by Potomac Edison.
Please do not request inspections under this permit until 2 business days after permit issuance.Replace current 150-Amp panel with new 200-Amp Main breaker panel.
Please do not request inspections under this permit until 2 business days after permit issuance.To Install 10 Lights 7 Outlets 5 Circuits 1 Dishwasher 1 Electrical Panel
Please do not request inspections under this permit until 2 business days after permit issuance.ConnectDER meter adapter. Service size: 200A
Please do not request inspections under this permit until 2 business days after permit issuance.Install 10 light fixtures, 12 receptacles, and 2 new dedicated electrical circuits
Revision - change from 44 roof mounted solar panels to 41 roof mounted solar panelsPlease do not request inspections under this permit until 2 business days after permit issuance.44 roof mounted solar panels
Please do not request inspections under this permit until 2 business days after permit issuance.Replacement of inverter.