Search Permits
249,120 results
Please do not request inspections under this permit until 2 business days after permit issuance.Remove all existing roof mounted solar panels, then install 67 replacement solar panels
Revision - Providing electric for 3 outdoor signs and correct the addressPlease do not request inspections under this permit until 2 business days after permit issuance.Provide electric for two exterior business signs.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (15) ROOF MOUNTED SOLAR PANELS, (1) INVERTER, 6.600 KW
Please do not request inspections under this permit until 2 business days after permit issuance.Heavy up to existing service. Install 1 dedicated 30 amp circuit for range.
Please do not request inspections under this permit until 2 business days after permit issuance.Meter and Panel Relocation.
Please do not request inspections under this permit until 2 business days after permit issuance.Install a NEMA 14/50 outlet next to the electrical panel inside the garage to be used with a plug-in EV charger.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (39) ROOF MOUNTED SOLAR PANELS, (39) MICRO INVERTERS, 17.160 KW, INSTALL ONE POWERWALL EXPANSION KIT, ONE BACK-UP BATTERY, 27 KWH, INSTALL ONE BACK-UP GATEWAY BETWEEN METER AND MSP.
Please do not request inspections under this permit until 2 business days after permit issuance.Single house 400 AMP main service 120/240V wiring receptacles, lights, appliances
Please do not request inspections under this permit until 2 business days after permit issuance.Service Conductor Refeed
Please do not request inspections under this permit until 2 business days after permit issuance.Remove and Reinstall of Solar Panels per building permit 755350 and electric permit 755780
Please do not request inspections under this permit until 2 business days after permit issuance.Kitchen and bath remodel
Please do not request inspections under this permit until 2 business days after permit issuance.Heavy up to 200 amps with new ground system and one new whole house protection.
Please do not request inspections under this permit until 2 business days after permit issuance.Temporary power 100 AMP 120/240V
Please do not request inspections under this permit until 2 business days after permit issuance.Relocate existing 600amp main breaker panel to exterior wall behind the existing panel, (3) 75hp 480v pumps Relocate 600amp sub panel, relocate 600amp current transformer cabinet
Please do not request inspections under this permit until 2 business days after permit issuance.Install 2 GFCI protected outlets with dedicated circuits for sump Pumps in basement
Please do not request inspections under this permit until 2 business days after permit issuance.Installing Nurse Call and overhead paging sytem. No devices to exceed 70 Volts. No permanent connection to main power.
Please do not request inspections under this permit until 2 business days after permit issuance.10-lights and switch,6-plugs,2-heater 240 volts.
Please do not request inspections under this permit until 2 business days after permit issuance.Add Temporary pole power for work at 8917 Seneca Ln, Bethesda, MD 20817.
Please do not request inspections under this permit until 2 business days after permit issuance.Install new recessed lights and 3 outlets and 1 smoke detector in the existing office ,install new lights in the hallway and new switches, install new recessed lights,fan and outdoor outlets
Please do not request inspections under this permit until 2 business days after permit issuance.Install 28 lights, 15 switches, 20 outlets, 10 smoke detectors, 9 appliances, 2 wall heaters and run 15 circuits. Replace (1) 200 amps electrical panel.
Please do not request inspections under this permit until 2 business days after permit issuance.Heavy up from 150 to 200 amp service
Please do not request inspections under this permit until 2 business days after permit issuance.200 Amps Heavy Up, Install 50 Receptacles, 60 Lights Fixtures, Dishwasher, Disposal, Microwave and Dryer / Washer
Please do not request inspections under this permit until 2 business days after permit issuance.hot tub
Please do not request inspections under this permit until 2 business days after permit issuance.We are replacing an existing 200A panel with a new one.
Please do not request inspections under this permit until 2 business days after permit issuance.Add 60amp breaker and installing EV Charger on outer left wall of house next to meter at the driveway.
Please do not request inspections under this permit until 2 business days after permit issuance.Add 60amp breaker and installing EV Charger in garage
Please do not request inspections under this permit until 2 business days after permit issuance.Existing inground concrete residential swimming pool. The builder is reworking the steel form a little, adding steel, this will be bonded to the existing steel. We are adding three pool lights.
Please do not request inspections under this permit until 2 business days after permit issuance.Heat Pump (Outdoor) Circuit and Water Heater Circuit Install
Please do not request inspections under this permit until 2 business days after permit issuance.EV Charger wall mounted
Please do not request inspections under this permit until 2 business days after permit issuance.Temporary pole service for construction. Located at front of property.