Search Permits
249,120 results
Please do not request inspections under this permit until 2 business days after permit issuance.400 AMP SERVICE
Please do not request inspections under this permit until 2 business days after permit issuance.
Please do not request inspections under this permit until 2 business days after permit issuance.Electrical work done at Unit PH-704
Please do not request inspections under this permit until 2 business days after permit issuance.
Please do not request inspections under this permit until 2 business days after permit issuance.Hardwired Level 2 EV charger installation outside on a pedestal.
Please do not request inspections under this permit until 2 business days after permit issuance.Wire Patio Enclosures sunroom. Install: (1) 110 circuit, (1) ceiling fan, (1) switch, (4) receptacles
Please do not request inspections under this permit until 2 business days after permit issuance.Heavy up to 200 Amps
Please do not request inspections under this permit until 2 business days after permit issuance.Please do not request inspections under this permit until 2 business days after permit issuance.400 AMP SERVICE
50'X 60' Pre fabricated steel accessory building with electrical
Desert Uplands Envelope Lot - Construct Swimming Pool & Spa. All work related to swimming pool and spa is within the existing privacy fence and temporary fence. No new disturbance with this permit. The temporary fence is required to remain in place per the approved site plan at all times during construction. All areas out of the approved disturbance area shall remain undisturbed at all times. Property line fencing is not permitted. A separate zoning inspection is required prior to final buildin
Phase 1 and Phase 2 civil drawings for overall site.
BLANDFORD HOMES #3501 The Estates @ Pioneer Crossing - New 2942 SF two story residence with a 2+ car garage at The Estates @ Pioneer Crossing. Includes new water, electric and gas meters. Special inspection for post tension slabs
Build 7,447 SF livable one-story single-family residence with attached garage. Special inspections required for drill & epoxy, field welding, masonry construction, soils, PT slab, and structural ICF walls. Deferred truss calculations. Existing 1 1/2-inch water service line. New 1-inch water meter.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (26) ROOF MOUNTED SOLAR PANELS, (26) MICRO INVERTERS, ONE 60A LINE SIDE TAP, 11.180 KW
Please do not request inspections under this permit until 2 business days after permit issuance.Basic electrical work for addition. Lights, receptacles, switches.
Please do not request inspections under this permit until 2 business days after permit issuance.Meter Enclosure, New Main Breaker Enclosure 200 amps PEPCO
Please do not request inspections under this permit until 2 business days after permit issuance.EV Charger Install
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (22) ROOF MOUNTED SOLAR PANELS, (22) MICRO INVERTERS, ONE 45A LINE SIDE TAP, 9.460 KW
Please do not request inspections under this permit until 2 business days after permit issuance.Remove and replace defective inverter. No other changes or upgrades to occur from original installation.
Please do not request inspections under this permit until 2 business days after permit issuance.Primary wiring of new 400a dwelling.
Please do not request inspections under this permit until 2 business days after permit issuance.Primary wiring of new 400a dwelling.
Please do not request inspections under this permit until 2 business days after permit issuance.Replace existing 120-240v 200amps electrical panel
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL 100 AMP SUBPANEL, RECEPTACLE
Please do not request inspections under this permit until 2 business days after permit issuance.SFD/ REPLACE EXISTING SEU CABLE. 150AMP SERVICE
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of 7.04kw (16) roof-mounted solar modules on existing SFD
Please do not request inspections under this permit until 2 business days after permit issuance.
Please do not request inspections under this permit until 2 business days after permit issuance.Low voltage wiring of 18 Data/Video,3Network, 5 Camera's, 8 Speakers, 8 Security devices.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of 7.92 KW Solar System (18 panels) attached flush to existing roof.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of solar panels on existing residential roof. 4.4 kW. Addition of 1 0-60A circuits. 10 panels.
Please do not request inspections under this permit until 2 business days after permit issuance.Fire alarm installation. MC cable, Boxes, and devices.