Search Permits
247,466 results
*S.M.A.R.T. HOUSING* *GREEN BUILDING* ePlan: Residential Expedited Review - New construction of a 3-Story Townhome [3bed 3.5bath] with Attached Garage. 4010 MONTAGE PASS
We plan to install: (N) 7.920 kW DC ROOF MOUNT SOLAR PV SYSTEM WITH (N) 18 - HYUNDAI SOLAR: HiS-T440NF(BK) 440W PV MODULES WITH (N) 6 TESLA: RSD MCI-2 WITH (N) 01 TESLA: POWERWALL 3 (1707000-21-Y)
Total demo of sfr 1800 sqft circa 1961
125amp panel replacement adding grounding system PEC is the electric provider. No meter work.
Garner S401 B Left New - 1 Story SFR w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
BASE: Installing a backup battery system and additional meter socket.
ETJ. BASE: Installing a backup battery system and additional meter socket.
ETJ - 10 tunnel to replace broken shower drain line in backyard on the right side of the home
Cinque Terre West ATX EAST ELEVATION
Dig 15 of tunnel to repair broken PVC pipe
First time tenant fit out for a restaurant.
COMPOSITE FIBERGLASS INGROUND POOL AND CONCRETE DECK FOR EXISTING SFR
Irrigation system for an office building
composite fiberglass inground pool and concrete deck to rear of existing SFR
We are replacing a gas line to raise the ceiling and testing the gas system.
front lit channel letter sign reading AGELESS WOMENS HEALTH ON SOUTH ELEVATION
Repair of failed drain piping by tunnel.
*S.M.A.R.T. HOUSING* *GREEN BUILDING* ePlan: Residential Expedited Review - New construction of a 3-Story Townhome [3bed 3.5bath] with Attached Garage. 4206 MONTAGE PASS
Replacing old meter can to a AE by lever meter can and transfer switch for a 26kw generac generator.
HOME BUILDERS LOOP for New SFR COA BP: 2026-122101
Repairing 18 cast iron under pier and beam house and yard line
ePlan: Commercial Expedited Review - [APPROVED] New Construction of Institutional Building for Exhibition Library Offices and Classrooms. Scope to also Include Covered Parking Garage Low Hazard Storage Reflecting Pool Mechanical Yard and Garden (27144)
*S.M.A.R.T. HOUSING* *GREEN BUILDING* ePlan: Residential Expedited Review - New construction of a 3-Story Townhome [3bed 3.5bath] with Attached Garage. 4014 MONTAGE PASS
Service rebuild like for like.
Replacing the sewer line outside of the home from the cleanout to the city cleanout area
crew will excavate a tunnel from the front of the home toward the rear All branch lines serving the bathroom groups will be reconfigured
Install new gas line for generator
temporary power for construction. 2026-125359 BP
ETJ - irrigation for lawn
New Construction - 5 story Self Storage Facility.