Please do not request inspections under this permit until 2 business days after permit issuance.
Please do not request inspections under this permit until 2 business days after permit issuance.-Provide power for the pollock elevator: 240 volts, 20 amp -120 volt, 15 amp for light in elevator cart. -1 light in each floor with switch -Provide one GFI and light in the elevator room
Please do not request inspections under this permit until 2 business days after permit issuance.REPLACE METER CAN
Please do not request inspections under this permit until 2 business days after permit issuance.adding a heater
Please do not request inspections under this permit until 2 business days after permit issuance.25A 2 pole GFCI breaker to outdoor unit fuel switch HVAC to heat pump fuel switch gas water heater to electric
Please do not request inspections under this permit until 2 business days after permit issuance.Install one 48-amp car charger
Please do not request inspections under this permit until 2 business days after permit issuance.replace subpanel for more space subpanel and install mini split circuit
Reroof and redeck. Remove the existing 1 x 8 plank decking. Replace with 5/8 CDX plywood. Install using H-clips and nail with 8d ring shank nails. A balanced attic ventilation system is to be installed. Consisting of 27 linear feet of shingle over ridge vents and 54 linear feet of shingle over eave vents. The attic ventilation installation is to follow manufacturer installation instructions.
Please do not request inspections under this permit until 2 business days after permit issuance.100amps
Please do not request inspections under this permit until 2 business days after permit issuance.Installed an Ev charger
Please do not request inspections under this permit until 2 business days after permit issuance.Add a new 50A circuit and install a Tesla level2 wall connector
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (26) ROOF MOUNTED SOLAR PANELS, (26) MICRO INVERTERS, ONE 60A LINE SIDE TAP, 11.180 KW
CITY OF MESA ZONING CLEARANCE PERMIT ONLY FOR INSTALLATION OF 16-FT X 62-FT 2027 GROUND SET CHAMPION MH, SERIAL NO. 15700PHA007061A, WITH UTILITIES. NO LP TANKS. GREENBOARD SKIRTING. ONE 12-FT X 62-FT ATTACHED AWNING. ICCESSR NO. 4436. NO OTHER ACCESSORY STRUCTURES AT THIS TIME. MIN 2 - 9-FT X 18-FT PAVED, 2-IN ASPHALT OR 4-IN CONCRETE, UNOBSTRUCTED PARKING SPACES ARE REQUIRED BEHIND FRONT SETBACK, ONE PARKING SPACE REQUIRED TO BE COVERED. 40-FT X 78-FT INTERIOR LOT. MIN SETBACKS: 5-FT FRONT, 5
CONSTRUCT A 510 SF SWIMMING POOL WITH NATURAL GAS HEAT. SUNKEN BAR. INSTALLATION OF 118-FT OF 1-1/2-IN PE GAS LINE BURIED 18-IN DEEP WITH 18 GAUGE TRACER WIRE FROM GAS METER TO 125K BTU FIRE FEATURE, TEE OFF 10-FT OF .75-IN PE GAS LINE TO 75K BTU BBQ. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & COM GAS REQUIREMENTS.COM GAS TO DETERMINE IF METER NEEDS TO BE UPGRADED. NO SPA. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED ST
CONSTRUCT A 415-SF SWIMMING POOL. NO SPA. NO GAS. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER - ALAN E. MONEY NO. 30895, EXPIRES 12-31-26. REF MST26-01206. ENGINEERING AND STRUCTURAL CALCULATIONS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL AND SPA CODE WITH ALL CITY OF MESA AMEN
CONVERSION OF GARAGE TO DESIGN CENTER FOR MODEL COMPLEX. REF MODEL COMPLEX PMT21-19360 STIP: THIS HOME IS NOT TO BE INHABITED UNTIL THE DESIGN CENTER IS CONVERTED BACK TO A GARAGE AND THE MODEL HOME COMPLEX PARKING LOT 116 (11119 E UTAH AVE) HAVE BEEN CONVERTED BACK AND THE PARKING LOT IS NO LONGER NEEDED. GARAGE AREAS MODIFIED OR IMPROVED FOR THE PURPOSE OF PROVIDING A TEMPORARY OFFICE SHALL BE RESTORED BACK TO A GARAGE PER PARKING STANDARDS IN CHAPTER 32 OF ZONING ORDINANCE PRIOR TO THE SAL
ADMINISTRATIVE USE PERMIT PER SEC.11-70-3 OF THE ZONING ORDINANCE FOR A TEMPORARY SALES OFFICE AND MODEL HOME COMPLEX WITHIN A RESIDENTIAL ZONING DISTRICT FOR HOMES BEING CONSTRUCTED IN THE IMMEDIATE SUBDIVISION, SUBJECT TO THE SITE PLAN APPROVED WITH THIS PERMIT. APPROVAL OF THE SALES OFFICE AND MODEL HOMES MAY BE GRANTED FOR A 3 YEAR PERIOD, OR UNTIL ALL HOMES IN THE SUBDIVISION ARE COMPLETED, WHICHEVER OCCURS FIRST. ORD. 873 ALLOWS EXTENSION IF NEED IS SHOWN. GARAGE AREA MODIFIED OR IMPROVE
Remodel of existing 15,260 SF, type III-B construction, group B occupancy building. Creation of (3) suites. Modifications include demo of existing non-load bearing walls & soffits. New interior non-load bearing walls, new plumbing, new electrical, new mechanical , and new finishes. Project has exterior building remodel, and site remodel of parking and landscape. Deferred fire sprinklers & fire alarm. Results in CoO for Suite 101 only.
Tenant improvement of fire sprinkler for suite 5
Commercial tenant improvement - Install one new hand sink and one drinking fountain, including associated domestic water and sanitary drainage connections to existing plumbing system. Electrician adding receptacles.
Tenant improvement fire sprinkler suite 6
Please do not request inspections under this permit until 2 business days after permit issuance.Low Voltage Wiring
Please do not request inspections under this permit until 2 business days after permit issuance.Low Voltage Wiring
Please do not request inspections under this permit until 2 business days after permit issuance.Electrical alteration to kitchen remodel.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (16) ROOF MOUNTED SOLAR PANELS, (16) MICRO INVERTERS, ONE 35A FUSED LINE SIDE TAP, 6.880 KW
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (19) ROOF MOUNTED SOLAR PANELS, (19) MICRO INVERTERS, 8.360 KW
Please do not request inspections under this permit until 2 business days after permit issuance.New home wiring and service
Please do not request inspections under this permit until 2 business days after permit issuance.Low Voltage Wiring
Please do not request inspections under this permit until 2 business days after permit issuance.Low Voltage Wiring
Please do not request inspections under this permit until 2 business days after permit issuance.Please do not request inspections under this permit until 2 business days after permit issuance.Electrical alteration to kitchen remodel.