Search Permits
249,120 results
Please do not request inspections under this permit until 2 business days after permit issuance.Remove and replace defective inverter. No other changes or upgrades to occur from original installation.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL ELECTRICAL FOR SOLAR 1200 AMP WITH 30.8 KW
Please do not request inspections under this permit until 2 business days after permit issuance.
Please do not request inspections under this permit until 2 business days after permit issuance.Add a New 20 Amp Outlet
Please do not request inspections under this permit until 2 business days after permit issuance.Heavy up to 400 amps
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of 39 module (17.160 KW) Roof mount solar system
Please do not request inspections under this permit until 2 business days after permit issuance.Generator install--this is a reapplication for an expired permit.
Please do not request inspections under this permit until 2 business days after permit issuance.200 amp heavy up
Please do not request inspections under this permit until 2 business days after permit issuance.PRIMARY WIRING OF NEW DWELLING
Please do not request inspections under this permit until 2 business days after permit issuance.Replacing panel--200 amps
New 2166 SF single story residence with a 2+ car garage at Hawes Crossing. New water, gas and electric meters. Special inspection for post tension slabs - SEE ADDENDA MST25-07603 - Ref: MST26-08010 for 2024 code update.
Adding a 50 amp circuit for a car charger. I will install the circuit back-to-back from the main electrical panel in the garage. I am also installing the charger.
Please do not request inspections under this permit until 2 business days after permit issuance.Remove existing 8 space subpanel and install 1 new 20 space subpanel in same location. Install 3 new circuits 2 for the exterior and one for interior for general purpose.
Please do not request inspections under this permit until 2 business days after permit issuance.New 240 volt circuit 60 amps for new EVSE inside the Garage.
Please do not request inspections under this permit until 2 business days after permit issuance.Electrical work for a deck/sunroom, including receptacles, light fixtures, and subpanel.
Please do not request inspections under this permit until 2 business days after permit issuance.Lights, switches, and outlets installations
Please do not request inspections under this permit until 2 business days after permit issuance.Install one 48-amp car charger with 20' of trench
Please do not request inspections under this permit until 2 business days after permit issuance.REPLACE DAMAGED/OUTDATED 200A PANEL WITH NEW 200A MAIN BREAKER PANEL. REPLACE EXISTING 200 LINE AND LOAD SIDE TAILS WITH NEW 200A NEW LINE AND LOAD SIDE SERVICE TAILS
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (25) ROOF MOUNTED SOLAR PANELS, (25) MICRO INVERTERS, ONE 50A LINE SIDE TAP, 10.750 KW
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (29) ROOF MOUNTED SOLAR PANELS, (29) MICRO INVERTERS, ONE 50A LINE SIDE TAP, 12.760 KW
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (26) ROOF MOUNTED SOLAR PANELS, (26) MICRO INVERTERS, ONE 60A FUSED LINE SIDE TAP, 11.440 KW
14x20 covered pergola from a kit with Home Depot there are no and will not be any construction plans. It will be cemented in then ground on each post and can be removed easily.
Please do not request inspections under this permit until 2 business days after permit issuance.Residential Sauna
Please do not request inspections under this permit until 2 business days after permit issuance.Typical pole service for construction
Please do not request inspections under this permit until 2 business days after permit issuance.Bathroom and Walk-in Closet -Interior Renovation
Please do not request inspections under this permit until 2 business days after permit issuance.Run feed for new pool and hot tub. Wire pump, wire auto cover, wire lights add service receptacle.
Please do not request inspections under this permit until 2 business days after permit issuance.Upgrade existing 100A electrical service to 200A (Heavy Up). Replace main electrical panel, meter socket, and service entrance cable. Upgrade grounding and bonding as required.
200a panel replacement like for like
Existing 195,621 SF building, type V-B type construction, group F-1, B and S-1 occupancy, including an existing 2,884 SF, type IIB construction, group F-1 occupancy utility building. This submission covers the work for phase 2 such as the site equipment in the utility station and on the site pads. It also includes, in the building, the cleanroom walls and ceiling panels, owner equipment, engineered MEP systems, pipe racks, ceilings. Ref: PMT24-18579 for Phase 1. DEFERRED FIRE SPRINKLERS. DEFERRE
Please do not request inspections under this permit until 2 business days after permit issuance.Heavy up existing service to property. Install 200 ampere equipment