Search Permits
249,120 results
Please do not request inspections under this permit until 2 business days after permit issuance.(1) 40A circuit solar pv system on exisitng residence
Please do not request inspections under this permit until 2 business days after permit issuance.Remove and replace existing wall-mounted Powerwall and Backup Gateway . Equipment reinstalled in the same location. No changes to existing roof-mounted solar panels.
Please do not request inspections under this permit until 2 business days after permit issuance.inverter swap same model
Please do not request inspections under this permit until 2 business days after permit issuance.Replace defective solar Inverter
Please do not request inspections under this permit until 2 business days after permit issuance.LIKE FOR LIKE REPLACEMENT OF HEAT PUMP AND GAS FURNACE
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of EV charger
Please do not request inspections under this permit until 2 business days after permit issuance.EV Charger Installation
Please do not request inspections under this permit until 2 business days after permit issuance.HEAVY UP OF 400AMP.
Please do not request inspections under this permit until 2 business days after permit issuance.Sunroom renovation
Please do not request inspections under this permit until 2 business days after permit issuance. Remove and replace defective inverter. No other changes or upgrades to occur from original installation.
Please do not request inspections under this permit until 2 business days after permit issuance. install GFI protected receptacle for wood burning fireplace
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of roof top solar system.
Please do not request inspections under this permit until 2 business days after permit issuance.REPLACE THE DAMAGED 200A LOAD SIDE SERVICE TAIL WITH NEW 200A LOAD SIDE SERVICE TAIL.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (26) ROOF MOUNTED SOLAR PANELS, (26) MICRO INVERTERS, ONE 60A LINE SIDE TAP, 11.440 KW
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (30) ROOF MOUNTED SOLAR PANELS, (2) MICRO INVERTERS, 60A FUSED LINE SIDE TAP, 13.200 KW
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (64) ROOF MOUNTED SOLAR PANELS, (64) MICRO INVERTERS, ONE 150A FUSED LINE SIDE TAP, 28.160 KW
Please do not request inspections under this permit until 2 business days after permit issuance.REPLACE EXISTING 150A PANEL WITH NEW 200A MAIN BREAKER PANEL. REPLACE EXISTING 150A LINE AND LOAD SIDE SERVICE TAILS WITH NEW 200A LINE AND LOAD SIDE SERVICE TAILS.
Please do not request inspections under this permit until 2 business days after permit issuance. Remove and replace defective inverter. No other changes or upgrades to occur from original installation.
CONSTRUCT A 555 SF SWIMMING POOL & 49 SF SPA WITH EXISTING 120 GAL PROPANE TANK UNER PMT25-22357. INSTALLATION OF 128-FT OF 1.5-IN PE GAS LINE BURIED 18-IN DEEP WITH 18 GAUGE TRACER WIRE FROM PROPANE TANK TO 400K BTU POOL HEATER, 16-FT OF .75-IN PE GAS LINE TO 87K BTU BBQ. ALL GASLINE TO BE INSTALLED PER 2024 IFGC & FPD 6104.1. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT #5891
Tenant improvement 10,692 SF of 269,917 SF, 3-story, type II-A construction B occupancy office bldg. Modifications include demo existing restroom facility on 1st and 2nd level, removing walls and fixtures to reconfigure restroom to add additional water closet for each gender at each restroom facility and associated MEP. Deferred fire sprinklers. Results in CoC.
Install new storage racks in an existing warehouse suite. Tenant improvement for new business under PMT26-16185. Special inspections required: post-installed anchors. Results in CofC.
INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A HARDWIRE EMPORIA PRO WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
Installation of intellijacks and foundation pads in crawl space to support existing floor above. Special Inspections required for Push Piers.
PERMIT IS ONLY FOR AN UPGRADE TO A 200AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. EQUIPMENT MOUNTED TO AN H-FRAME, THE H-FRAME SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY
CONSTRUCT A 375-SF SWIMMING POOL. NO SPA. NO GAS. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: ALAN E. MONEY NO.30895, EXPIRES 12-31-26. REF MST26-01206. ENGINEERING AND STRUCTURAL CALCULATIONS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMEN
new adu
Replace existing breaker and feeders with new for the existing HVAC Chiller unit at City of Mesa community library. Approved as noted. Results in CofC.
Replace existing tank gas water heater, to install a new tankless gas water heater. Minimum required building inspections: Gas underground, gas rough in and gas pipe final.
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR