Please do not request inspections under this permit until 2 business days after permit issuance.Adding 4 lights, 1 switch and 1 receptacle.
Please do not request inspections under this permit until 2 business days after permit issuance.Please do not request inspections under this permit until 2 business days after permit issuance.Replacement of existing fire alarm control panel with new control panel
Please do not request inspections under this permit until 2 business days after permit issuance.Replacing 200amp main panel. Rough wiring kitchen and living area.
Please do not request inspections under this permit until 2 business days after permit issuance.New home wiring and service.
Please do not request inspections under this permit until 2 business days after permit issuance.Rivian Level 2 EV charger hardwired inside the garage.
Please do not request inspections under this permit until 2 business days after permit issuance.Replace the overhead service mast with new conduit due to previous tree damage. The existing meter and main panel will remain in place.
Please do not request inspections under this permit until 2 business days after permit issuance.Direct replacement of one 6 ton AC+Gas rooftop packaged unit
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL ACCESS CONTROL S600 SUITE DOOR
Please do not request inspections under this permit until 2 business days after permit issuance.Please do not request inspections under this permit until 2 business days after permit issuance.
Please do not request inspections under this permit until 2 business days after permit issuance.
Please do not request inspections under this permit until 2 business days after permit issuance.Install 25 rooftop solar panels 11.25kW.
Please do not request inspections under this permit until 2 business days after permit issuance.Install Grizzl-E Ultimate EV Charger on a new 60A circuit from the existing 200A main service panel, using #6 AWG conductors, hardwired to the charger.
Please do not request inspections under this permit until 2 business days after permit issuance.Upgrade existing 150A service to 200A, install new interior panel and outdoor disconnect, transfer existing circuits, and install a new 100A garage subpanel with approximately 90 ft of feeder cable. Includes grounding, bonding, permit, and inspections.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of (1) EV charger in the garage of a SFD.
Please do not request inspections under this permit until 2 business days after permit issuance.40 dual drops
Please do not request inspections under this permit until 2 business days after permit issuance.NIAID Privacy Rooms 7th & 9th Floors 7th Fl Area #1 - 7CXX-7025 & 7026 7th Fl Area #2 - 7EXX-7039 9th Fl Area #3 - 9CXX-9025 & 9027 9th Fl Area #4 - 9EXX-9041
Please do not request inspections under this permit until 2 business days after permit issuance.Install 13 rooftop solar panels 5.85kW.
Please do not request inspections under this permit until 2 business days after permit issuance.Wire for remodeled kitchen
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (27) ROOF MOUNTED SOLAR PANELS, (27) MICRO INVERTERS, ONE 60A LINE SIDE TAP, 11.880 KW
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (24) ROOF MOUNTED SOLAR PANELS, (2) INVERTERS, ONE 50A LINE SIDE TAP, 10.560 KW
Please do not request inspections under this permit until 2 business days after permit issuance.Electrical for roof mounted PV solar system install of 7.48 kW DC: 17 ( Panels)
Please do not request inspections under this permit until 2 business days after permit issuance.Install 11 rooftop solar panels 4.95kW.
Please do not request inspections under this permit until 2 business days after permit issuance.Electrical for roof mounted PV solar system of 8.8kW DC; 20 Panels
Please do not request inspections under this permit until 2 business days after permit issuance.Tesla Wall Connector Installation
Please do not request inspections under this permit until 2 business days after permit issuance.Install 13.12 kW roof-mounted solar PV system with 32 Qcells modules and line-side tap connection.
Please do not request inspections under this permit until 2 business days after permit issuance. MPR from a 150/0A to a new 200/150A with 200A busbar. Service upgrade from 150amp to 200amp. Install a new 225A Service Disconnect with 150A Main Breaker and Surge Protector.
Please do not request inspections under this permit until 2 business days after permit issuance. Remove and replace defective inverter. No other changes or upgrades to occur from original installation.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of new speed enforcement traffic equipment on an existing pole. Existing power source to be utilized; no new service required. MCPD Automated Traffic Enforcement Unit.
Tenant infill for new salad restaurant in existing tenant building. Results in CoO.
Construction of a new one-story restroom and pool equipment building serving the private Hawes Crossing residential community pool. The project includes common-use men’s and women’s restrooms, an adjacent pool equipment area, an exterior rinsing/shower area, accessible facilities and routes, and associated structural, plumbing, mechanical and electrical work. Building plan review is requested to proceed concurrently with Planning review. Planning approval and stamped plans are pending completio