Search Permits
249,120 results
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of PV solar panels and energy storage system
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Construction of a new detached, single-story, 400-square-foot Accessory Dwelling Unit (ADU) on an existing single-family residential property. The new ADU will include one bedroom, one bathroom, kitchen, living area, closet, and laundry area, along with associated structural, electrical, plumbing, and mechanical work. The project includes new foundation, wood-framed walls, roof structure, exterior stucco finish, roofing to match the existing residence, windows, doors, and all required utility co
Replacement of 200 Amp (or less) electric panel - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. THE ACT OF SELF DISCONNECTING UTILITY WIRES OR METERS IS PROHIBITED AND MAY CAUSE DAMAGE OR INJURIES. Failure to schedule disconnect may result in additional utility trip charge fees and charges for any damage to utility equipment. Please contact your applicable utility (either SRP at 602
Existing 200A electric service panel to be replaced with a 200A all-in-one electric service panel at the same location. Complete rewiring of the home is included. Minimum required building inspections: Electric rough in and electric final.
Replace storm damaged SES and house panel. Install new electrical meter. Special inspection required for electrical work. Reviewed as noted. Results in CoC.
Please do not request inspections under this permit until 2 business days after permit issuance.Install (18) roof mounted solar panels, (18) Enphase Micro Inverters, (1) Enphase IQ Combiner Box 5, (1) Junction Box, (2) ac disconnects, (1) Meter can with utility meter, 8.100 KW PV ARRAY
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of 39 module 17.160 KW roof mount solar system.
Please do not request inspections under this permit until 2 business days after permit issuance.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of 41 roof mounted solar panels and an energy storage system
Please do not request inspections under this permit until 2 business days after permit issuance.replace defective solar inverter
Please do not request inspections under this permit until 2 business days after permit issuance.Add hardwired circuit for EV charger.
Please do not request inspections under this permit until 2 business days after permit issuance.RE INTRODUCTION OF POWER REQUIRED BY THE POWER COMPANY. No work was done in the unit
Please do not request inspections under this permit until 2 business days after permit issuance.Heavy up 200 amp. Install new 1 toilet & 1 nail exh. fan, 1 washer, 1 dryer, 2 switches, 5 Recep., 2 ped. chairs, 10 ltg. fixtures, 2 emg. lights, 2 exterior lights, 1 exit sign and 1.5-ton AHU & HP.
Please do not request inspections under this permit until 2 business days after permit issuance.Add hardwired circuit for EV charger.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (23) ROOF MOUNTED SOLAR PANELS, (23) MICRO INVERTERS, 10.120 KW
Please do not request inspections under this permit until 2 business days after permit issuance.1 CAT6, 14 lights, 13 receptacles and 8 switches, 1 20amp circuit for mini split unit
Please do not request inspections under this permit until 2 business days after permit issuance.Install 1-24kW generator with 1�150-amp transfer switch.
Please do not request inspections under this permit until 2 business days after permit issuance.Remove and Replace defective Inverter
Please do not request inspections under this permit until 2 business days after permit issuance.LOW VOLTAGE WIRING FOR TH
Please do not request inspections under this permit until 2 business days after permit issuance.Hey Tea Tenant Space 1072 - Electrical permit for fire alarm permit 1174373
Please do not request inspections under this permit until 2 business days after permit issuance.Outlet Extension for Bidet Toilet at Unit #201
Please do not request inspections under this permit until 2 business days after permit issuance.Provide a dedicated line of 240 volt 30 amp for water heater
Please do not request inspections under this permit until 2 business days after permit issuance.Install a new 30 amp 240volt circuit for a water heater. New pull out disconnect
Please do not request inspections under this permit until 2 business days after permit issuance.Replacing existing 100 Amp Panel with a 200 Amp Panel
Please do not request inspections under this permit until 2 business days after permit issuance.200 amp service disconnect
Please do not request inspections under this permit until 2 business days after permit issuance.New Construcci�n/New Service Equipment Heavy Up 400 amps/We will need Cut-In Power Pepco
Please do not request inspections under this permit until 2 business days after permit issuance.Install 1 26kW generator with 1-200 amp transfer switch.
Please do not request inspections under this permit until 2 business days after permit issuance.LOW VOLTAGE WIRING WHOLE HOUSE CAT6 AND COAX 4X DUAL PORT (CAT6 & COAX)
Please do not request inspections under this permit until 2 business days after permit issuance.LOW VOLTAGE WIRING WHOLE HOUSE CAT6 AND COAX 3X DUAL PORT (CAT6 & COAX)