Search Permits
247,466 results
Plumbing Permits
Plumbing Permits
Fire Protection Systems
Plumbing Permits
HVAC
Plumbing Permits
Alteration
Alteration
Fire Protection Systems
Fire Protection Systems
Repair
Repair
Repair
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
Remodel Of (E) Floating Home
New Landscape Improvements, (N) Wood Deck, Replace (E) Wood Deck, (N) Screen Fence, (N) Site Retaining Walls.
Remodel Of Rear Yard. Replace Decks, Steps And Patio. 96 Sqft Of New Deck Area. No Interior Work.
Kitchen Remodel, Remove (E) Fireplace, Repair Roof At Infill Area (N) Entry Door And Landing, (N) Skylights (N) Service Panel
Modify existing fire alarm system by installing new panels and devices, which includes fire alarm control panels, NAC extension panels, initiating devices, notification appliances, smoke sensors standard and with sounder, addressable modules, duct smoke detectors, remote test stations, waterflow/tamper monitoring, and kitchen hood suppression system monitoring.
CONSTRUCT 118 SQ FT STORAGE SHED UNDER EXISTING AWNING WITH CEILING JOIST, ELECTRIC AND PLUMBING. REFERENCE EXISTING PM SET PERMIT PMT20-13153. NO OTHER ACCESSORY STRUCTURES AT THIS TIME. THE EXISTING AWNING IS CONSIDERED A LEGAL NON-CONFORMING STRUCTURE PER MZO SECTION 11-36-4 AS IT EXCEEDS THE MAXIMUM SQUARE FOOTAGE ALLOWED PER MZO SECTION 11-34-2. THE STRUCTURE MAY REMAIN PROVIDED THAT NO EXPANSIONS OR ENLARGEMENTS ARE MADE, AND THE STRUCTURE IS NOT REMOVED OR DEMOLISHED. MINIMUM ONE 9-FT X 1
New single-story custom home with 1804 SF livable and 951 SF non-livable area consisting of garage, covered porch, and covered patio. Type V-B construction. Existing 3/4-inch water meter. Existing sewer main. New gas meter. Deferred truss calculations. No special inspections. Minimum required building inspections: Plumbing underground, footing, stem, pad elevation (conditional hold), strap/shear, frame, mechanical rough in, electric rough in, plumbing rough in, insulation, drywall shear, mechani
Construction of a new 300 SF accessory Group H-3 control room within an existing Type II-B aircraft hangar. Scope includes new 2-hour fire-resistance-rated walls and ceiling, exhaust ventilation, and associated control-room improvements. Code modification for control-room location under PMT26-13785. Separate hangar work under PMT26-06512. Outdoor hazardous material storage will be permitted separately. Special inspection for electrical. Deferred chemical fire protection system and fire alarm sys
Renovations at existing mercantile. New architectural, electrical, and plumbing. New partition walls to create pet wash room. New plumbing water lines and waste lines connected to (2) new pet wash tubs. New fuel fired tankless water heater for pet wash room. New light fixture at pet wash room. New wall mounted step transformer and new interior 100A electrical panel. New electrical receptacles at cashwrap station. New electrical drops for LED fixtures. Results in CofC.