Search Permits
249,120 results
Please do not request inspections under this permit until 2 business days after permit issuance.ADD LED LIGHTS , APPLIANCES, GENERAL OUTLETS AND SMOKES
Please do not request inspections under this permit until 2 business days after permit issuance.Kitchen remodel
Please do not request inspections under this permit until 2 business days after permit issuance.The existing building is being demo and the property needs temp power during construction
Please do not request inspections under this permit until 2 business days after permit issuance.(1) 200 Amp Heavy up, 1 dishwasher, 1 disposal, 1 stove, 1 microwave, 1 fridge, 35 outlets, replace 15 outlets, 35 recessed lights, replace 12 lights, 2 GFCI, 2 smoke detectors.
Please do not request inspections under this permit until 2 business days after permit issuance.This EP is only for heavy up from 100 amps to 200 amps. no other electrical work will be done .
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (40) GROUND MOUNTED SOLAR PANELS FOR 18.80 KW/ BLDG A/P 1168382
Please do not request inspections under this permit until 2 business days after permit issuance.Not Heavy-Up. Not Sub Pnl.. Replacement of Main 200A Pnl. Challenger to New 200A Pnl.. Not replacing or Upgrading service. One for One swap.
Please do not request inspections under this permit until 2 business days after permit issuance.Direct replacement of one 2.5 ton Heat Pump and Air Handler with new Lennox 2.5 ton heat pump (M:ML14KP1-030) and new air handler (M:CBK45UHET-030)
Please do not request inspections under this permit until 2 business days after permit issuance.AT&T is installing (6) new antennas and (16) RRHs.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of 7.48kw (17) roof-mounted solar modules on existing SFD
Please do not request inspections under this permit until 2 business days after permit issuance.Inverter Swap (different model)
Please do not request inspections under this permit until 2 business days after permit issuance.Replace existing 200a service feeder with new
Please do not request inspections under this permit until 2 business days after permit issuance. Inverter Swap Same Model
Please do not request inspections under this permit until 2 business days after permit issuance.Add hardwired circuit for EV charger in garage.
Please do not request inspections under this permit until 2 business days after permit issuance.Car Charger Installation
Please do not request inspections under this permit until 2 business days after permit issuance.PV SOLAR PANEL INSTALLATION ROOF MOUNTED 19 MODULES-ROOF MOUNTED - 7.790 kW DC, 6.631 kW AC
Please do not request inspections under this permit until 2 business days after permit issuance.Kitchen renovation: GFCI receptacles, dedicated circuits for induction cooktop, wall oven, microwave, dishwasher & fridge; switches; recessed, pendant & under-cabinet lighting. No service upgrade.
Please do not request inspections under this permit until 2 business days after permit issuance.Wire new basement.
Please do not request inspections under this permit until 2 business days after permit issuance.Fire alarm install only of: 1 hood module, 7 strobes, 4 speaker strobes
Please do not request inspections under this permit until 2 business days after permit issuance.PV SOLAR PANEL INSTALLATION ROOF MOUNTED 19 MODULES-ROOF MOUNTED - 7.790 kW DC, 6.631 kW AC
Please do not request inspections under this permit until 2 business days after permit issuance.Overhead Heavy-up
Please do not request inspections under this permit until 2 business days after permit issuance.Perform heavy up electrical service from 100 amps to 200 amps.
Please do not request inspections under this permit until 2 business days after permit issuance.Rough in an installing lights and ceiling fans.
Please do not request inspections under this permit until 2 business days after permit issuance.This is the electrical work for the solar panel system including one 100A subpanel/primary disconnect and a line side tap connection.
Please do not request inspections under this permit until 2 business days after permit issuance.Master bathroom remodeling. Rough wiring. For 5 switches, 8 light fixtures and 3 outlets 1 home run 20amps
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (23) ROOF MOUNTED SOLAR PANELS, (23) MICRO INVERTERS, ONE 40A LINE SIDE TAP, 10.120 KW
Install new high pile storage racks in warehouse area of an existing building. Special inspection required: post-installed anchors. Results in CofC.
New 400amp panel upgrade relocated to new location. 200amp sub panel installed at existing panel location, new feeders, grounding and bonding, and reconnect existing branch circuits. No other utility changes. No deferred items. No special inspections. Minimum required building inspections: Electric rough in and electric final.
Add Meter for new Equipment. REF: PMT21-11235 shell and suite CoO
Group B and F-1 occupancies. Type II-B construction. 3,490 SF. Occupant load 7. Demo partition walls and plumbing fixtures. Existing office and ADA compliant restroom. New MEP. Deferred fire sprinklers. Approved as noted. Results in CofO.