Search Permits
249,120 results
Please do not request inspections under this permit until 2 business days after permit issuance.Connectder meter adapter. Service size: 200A.
Please do not request inspections under this permit until 2 business days after permit issuance.EVSE 60 amp installation in the garage
Please do not request inspections under this permit until 2 business days after permit issuance.Installing 17.6kW roof mounted Solar PV System (40 panels)
Please do not request inspections under this permit until 2 business days after permit issuance.400 amp Heavy Up
Please do not request inspections under this permit until 2 business days after permit issuance.Panel Replacement and Exterior Receptacle on Back Deck.
Please do not request inspections under this permit until 2 business days after permit issuance.Wire remodeled basement
Please do not request inspections under this permit until 2 business days after permit issuance.PRIMARY WIRING OF NEW DWELLING
Please do not request inspections under this permit until 2 business days after permit issuance.PRIMARY WIRING OF NEW DWELLING
Please do not request inspections under this permit until 2 business days after permit issuance.Install 6 antennas and 9 radios.
Please do not request inspections under this permit until 2 business days after permit issuance.200A heavy up / overhead service.
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a generator.
Please do not request inspections under this permit until 2 business days after permit issuance.Access Control, Security Electric locks
Please do not request inspections under this permit until 2 business days after permit issuance.Replace a 200 amp mb and 40 circuit panel.
Please do not request inspections under this permit until 2 business days after permit issuance.Install 50A circuit to power range and Install 240V / 30A circuit to power heat pump water heater
Please do not request inspections under this permit until 2 business days after permit issuance.Renovation of living space to include lighting and outlets. Rewire kitchen and appliances
Please do not request inspections under this permit until 2 business days after permit issuance.POOL BONDING ON NEW POOL DECK AND 6 POOL LIGHTS
Please do not request inspections under this permit until 2 business days after permit issuance.This is to connect a sign existing circuit Sign permit sign-1175723
Please do not request inspections under this permit until 2 business days after permit issuance.One fork lift charger circuit One 30-amp circuit for charger
Please do not request inspections under this permit until 2 business days after permit issuance.2 Forklift chargers
Please do not request inspections under this permit until 2 business days after permit issuance.Install (24) Roof Mounted Solar Panels. System Size 10.56 kW DC
Please do not request inspections under this permit until 2 business days after permit issuance.Install (13) Roof Mounted Solar Panels. System Size 5.72 kW DC
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (ONE) BACK-UP BATTERY, 15 KWH TO EXISTING SOLAR. ONE BACK-UP GATEWAY INSTALLED BETWEEN NEW 200 SERVICE DISCONNET AND MAIN SERVICE PANEL.
Please do not request inspections under this permit until 2 business days after permit issuance.Level 2 EV Charger in garage
Please do not request inspections under this permit until 2 business days after permit issuance.Kitchen and 1st Floor remodel including all rough-in and final electrical installations
Please do not request inspections under this permit until 2 business days after permit issuance.Replace existing main service panel. 200A service
Please do not request inspections under this permit until 2 business days after permit issuance.REMOVE AND REPLACE DEFECTIVE POWERWALL 2 WITH POWERWALL 3 AND EXPANSION UNIT. NO OTHER CHANGES OR UPGRADES TO OCCUR FROM ORIGINAL INSTALLATION.
Please do not request inspections under this permit until 2 business days after permit issuance.Install (1) Chargepoint EV Charger
UNAUTHORIZED CONSTRUCTION. Carport to Garage, installation of a new 1-ton ductless mini-split heat pump system (indoor unit and outdoor condenser) with associated electrical circuit: replacement of existing water heater with a new 50-gallon natural gas unit on elevated platform. Related to COB26-00285.
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE SOLAREDGE BATTERY-10K. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK
Detached Garage Construction of a 1050 sq. ft. wood framed detached garage