Please note that before a damage permit is issued an estimate showing the Company doing the work, the subject address, scope of work, materials, and labor from either the contractor or the insurance company will be required. A written scope of work is required to approximate the cost of the permit, verbal estimations shall not be used. A completed Contractor Verification Form must also be submitted prior to being issued a permit. This structure is to be restored like for like construction
Fire Alarm device upgrade in fellowship square. Initiating only.
APN: 218-32-043 CITY SERVICES OUTSIDE CITY LIMITS (WATER)
Gate House entrance to community
STANDARD PLAY POOL 11X22
E01 - FACE REPLACEMENTS PYLON SIGN E02 - FLAT CUT OUTS ON BACKER E03 - NON-ILL FLAT CUT OUTS E04 - NON-ILL FLAT CUT OUTS ON BACKER
Group B and S-1 occupancies. Type V-B construction. 8,585 SF. Occupant load 61. Existing grey shell building. New partition and demising walls to create spec warehouse suite with office space. New architectural and MEP. New electrical meter 200A 3phase. Deferred fire sprinklers. Results in CofO.
Group B occupancy. Type V-B construction. 4263 SF. Occupant load 47. Existing building. Demo portions of demising walls to combine suites 103, 104 and 105. New partition walls and doors. Results in CofO.
E01 - REFACE PYLON SIGN E02 - NON-ILL FLAT CUT OUTS E03 - FLAT CUT OUTS ON BACKER E04 - NON-ILL FLAT CUT OUTS
E01 - REPLACE FACES E02 - NON-ILL FLAT CUT OUTS E03 - NON-ILL FLAT CUT OUTS ON BACKER
Wall Painting and flooring installation
Tenant improvement at existing type III-B construction Oil Change and car maintenance shop, S-1 occupancy (S-3 occ in 1994 code). Modifications include replacement of damaged exterior masonry wall, replacement of damaged floor deck with new W3 Verco deck and install of permanent shoring at basement level. Results in CoC.
Channel Plan for an auto mall
Before demolition or restoration can begin, an approved method of trash containment and removal must be in place. DATE: 9/22/2026 ADDRESS: 4853 E EVERGREEN ST MESA DAMAGED CAUSED BY: Vehicle Impact INSPECTED BY: Richard Lemcke The inspection of the site identified the following: Please note that before a damage permit is issued an estimate showing the Company doing the work, the subject address, scope of work, materials, and labor from either the contractor or the insurance company will be re
Meridian Rd improvements Ph 3 Water, sewer, new pavement
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
1. REPLACE SERVICE CASES W/ SELF-SERVICE CASES. 2. REPLACE STAINLESS STEEL TABLES IN SEAFOOD & DELI. 3. REPLACE 2-COMP SINK IN SEAFOOD W/ 3-COMP. SUSHI PREP SINK 4. ADD SUSHI MAKELINE PREP TABLE 5. REPLACE HOT CASE & BASE IN DELI 6. PATCH RESINOUS FLOORING IN FRYER AREA
INSTALLATION OF 75-FT OF 1.5-IN PE GAS LINE BURIED 18-IN WITH 18 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & SW GAS REQUIREMENTS. SW GAS TO DETERMINE IF THE METER NEEDS TO BE UPGRADED.
1) Add 5th bedroom - framing, drywall, and electrical 2) Add 3rd bathroom - framing, electrical, plumbing All work is under the existing roof line – no exterior or footer work necessary
Removing existing 200 SF rear covered patio and adding a new 612 SF rear covered patio. Minimum required building inspections: Footing, strap/shear, framing and final.
Existing grey shell warehouse building. New partition walls to create spec office. New architectural and MEP. New electrical meter 200A 3phase. Deferred fire sprinklers. Results in CofC.
Existing grey shell warehouse building. New partition walls to create spec office. New architectural and MEP. Approved as Noted: All roof-mounted equipment shall be 100% screened per Mesa Zoning Ordinance Section §11-30-9. Deferred fire sprinklers. Results in CofC.
Group B and S-1 occupancies. Type V-B construction. 16,650 SF. Occupant load 77. Existing grey shell building. New partition walls to create spec office space in warehouse suite. New architectural and MEP. Deferred fire sprinklers. Results in CofO.
Group M occupancy. Type V-B construction. 2,290 SF. Occupant load 38. New CofO permit for an existing suite. No work to occur under this permit. Results in CofO.
New 2406 SF single story residence with a 2 car garage at AVALON CROSSING. Includes a new water, electric and gas meter. Includes an option of a tandem garage. See permit MST26-06635 for addenda - Code update 2024
PLUMBING PERMIT TO REPLACE EXISTING WET SPACE WITH NEW SHOWER IN MASTER BATHROOM. NEW VALVE AND PREFABRICATED ACRYLIC WALLS. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
CITY OF MESA ZONING CLEARANCE PERMIT ONLY FOR INSTALLATION OF 24-FT X 48-FT **** ABOVE-GROUND SET HERE COMES THE SUN MANUFACTURED HOME SERIAL NO. ********* WITH A/C. NO GAS. 200AMP PANEL UPGRADE. ONE 12-FT X 48-FT ATTACHED AWNING PER ICC ESR 1398. AWNING ENG PROVIDED BY CARL PUTNAM #39702. ACCESSORY STRUCTURE ROOF AREAS DO NOT EXCEED THE 100% MH FLOOR AREA. NO OTHER ACCESSORY STRUCTURES AT THIS TIME. MINIMUM TWO 9-FT X 18-FT PAVED UNOBSTRUCTED PARKING SPACES ARE REQUIRED BEHIND FRONT SETBACK ONE
Install one single faced illuminated multi-tenant monument sign. Ref CSP BOA25-00058. Results in CofC.
Install one single faced illuminated multi-tenant monument sign. Results in CofC.
Install one (1) set of illuminated pan channel letters with logo 33 sq ft on south elevation. LOGO SHIMA SUSHI