Search Permits
248,074 results
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALLING NE 15 LIGHTS, 1 OUTLET, 3 SWITCHES
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of solar panels on existing residential roof. 8.265 kW. Addition of 1 0-60A circuits. 19 panels.
Please do not request inspections under this permit until 2 business days after permit issuance.PV SOLAR PANEL INSTALLATION ROOF MOUNTED 31 MODULES-ROOF MOUNTED - 12.710 kW DC, 10.819 kW AC
Please do not request inspections under this permit until 2 business days after permit issuance.PV SOLAR PANEL INSTALLATION ROOF MOUNTED 16 MODULES-ROOF MOUNTED - 6.560 kW DC, 5.584 kW AC ADD NEW MAIN SERVICE DISCONNECT 150A RATED WITH 150A MAIN BREAKER
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of whole house low voltage
Please do not request inspections under this permit until 2 business days after permit issuance.Add wiring for second floor, remodel first floor, heavy up to 400 amps
Please do not request inspections under this permit until 2 business days after permit issuance.
Please do not request inspections under this permit until 2 business days after permit issuance.Install 50A circuit to power range
Please do not request inspections under this permit until 2 business days after permit issuance.wiring of new addition and replacement of existing 200 Amps. electrical service for new 400 Amps service
Please do not request inspections under this permit until 2 business days after permit issuance.Please do not request inspections under this permit until 2 business days after permit issuance.New SFD with finished basement,
Please do not request inspections under this permit until 2 business days after permit issuance.Please do not request inspections under this permit until 2 business days after permit issuance.
Please do not request inspections under this permit until 2 business days after permit issuance.PV SOLAR PANEL INSTALLATION ROOF MOUNTED 22 MODULES-ROOF MOUNTED - 9.020 kW DC, 7.678 kW AC
Please do not request inspections under this permit until 2 business days after permit issuance.(1) illuminated sign UL#E120005 Ruggles Sign
Please do not request inspections under this permit until 2 business days after permit issuance.PV SOLAR PANEL INSTALLATION ROOF MOUNTED 18 MODULES-ROOF MOUNTED - 7.380 kW DC, 6.282 kW AC
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a burglary system with hw devices, panel and wired touchpads.
Please do not request inspections under this permit until 2 business days after permit issuance.Remove and replace defective inverter. No other changes or upgrades to occur from original installation.
Please do not request inspections under this permit until 2 business days after permit issuance.INVERTER SWAP SAME MODEL
New 1958 SF, 1961 SF or 1957 SF 2 story residence with a two car garage in Hawes Crossing - Village 1. New electric, water and gas meters. Special inspection for post tension slabs. Electric Vehicle Charger. Structural Plan Sheets updated to reference Village 1 Phase 2. S-2.1: Porch post spec revised: Low Roof Truss Schedule 'E' name corrected. S-3: Setback dimension to truss A65D corrected. SD-1: Foundation chart note updated to "Village 1": new chart added for "Village 1 Phase 2". SD-2: Detail
Plumbing permit to replace existing wet space with new shower in primary bathroom and tub to tub replacement in guest bathroom. No structural changes. New installations will tie into existing piping. No change to overall square footage. No other work under this permit. All work to comply with 2024 IRC and 2023 NEC.
Modify existing fire alarm system by adding (3) horn/strobes.
Installation of (2) wall mounted internally illuminated individual front-lit pan-channel lettering signs NAUTICAL BOWLS ACAI BOWLS SMOOTHIES AND MORE 26.74 Sq Ft each.
PERMIT IS ONLY FOR THE INSTALLATION OF TWO ENPHASE IQ 10C BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Manufacture and install one set of white LED pan channel illuminated lettersets and logo on front elevation of suite DANNYS CREDIT 28 sq. ft. Signs shall be installed per NEC 2023 with UL listed components.
Group B occupancy. Type V-B construction. 1,773 SF. Occupant load 49. Demo existing plumbing fixtures in existing suite. New partition walls to create kitchen area, service area, dining room area, and a second restroom in a new restaurant. New kitchen equipment and plumbing fixtures. New electrical lighting and receptacles. (2) existing mechanical heat pump RTUs. New supply air ducts, return air plenum, exhaust fans, and diffusers. New ventless kitchen hood at the oven. New plumbing waste lines
Install (1) 52 SF front elevation wall mounted face lit pan channel letters sign: KNOCKOUT FITNESS
Install (4) 56.2 sf east elevation, 21.9 sf south elevation, 21.9 sq ft west elevation, 21.9 sf north elevation exterior wall mounted signs with pan channel lettering and logo RISAS DENTAL BRACES.
PLUMBING PERMIT TO REPLACE EXISTING WET SPACE WITH NEW SHOWER IN MASTER BATHROOM. NEW VALVE AND PREFABRICATED ACRYLIC WALLS. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
Foundation demolition and structural for crane support, in an existing construction type V-B building. Reviewed with comments. Special inspection for steel and concrete. Results in CoC.
PLUMBING PERMIT TO REPLACE EXISTING WET SPACE WITH NEW SHOWER IN MASTER BATHROOM. NEW VALVE AND PREFABRICATED ACRYLIC WALLS. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
Pier foundation repair to existing home. (9) Push Piers to be installed, stem wall repair, and concrete replacement. Special inspection for push piers. Results in CoC. Minimum required building inspections: Rough in and final inspection.