Search Permits
248,074 results
Addition of New 21 Sq Ft Shower, interior renovations, upgrade electrical, plumbing and mechanical and replace old patio beam to existing SFR. No change in footprint or added square footage. Minimum required building inspections: Frame, mechanical rough in, electric rough in, plumbing rough in, shower pan, insulation, drywall, mechanical final, electric final, plumbing final and building final. If needed, underground plumbing.
Power Rd Offsite Improvement Plans
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
New single family residence
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Install (1) Non-illuminated Flat Cut Out Aluminum Building ID Signage SANDSTORM DENTAL 20.75 Sq Ft.
INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A TESLA WALL CONNECTOR VEHICLE CHARGER ON THE EXTERIOR OF THE HOME. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
demo part of the exsiting house and rebuild
NEW 2 STORIES ADU WITH GARAGE ON FIRST STORY ATTACHED TO EXISTING PREMANUFACTURED GARAGE STORAGE
New double sided non-illuminated monument sign at an existing building. Results in CofC.
Demo portion wall and relocate door in exam room converting lab room to hot lab. New partition wall and door for CT scan room. New MEP. Special inspection required: post-installed anchors. Existing veterinary, CofO: PMT21-18459. Deferred fire sprinklers. Results in CofC.
TEMP ELECTRIC FOR CUSTOM HOME. **CLEARANCE MUST BE ADDRESSED WITH "TE" FOR TEMPORARY ELECTRIC PER CUSTOMER**
Civil drawings for Phase II of Coyote Landing multifamily, which includes the area adjacent to building 1, 2, 3, 4 and some garages. The remaining buildings have the civil work done in phase 1. One 2" meter and service for Landscaping is included with this project. Domestic water meters will be included with the building plans.
At risk grading permit for the PMT25-03332 main permit. See At-Risk Construction and CoO Hold Acknowledgment Letter.
Building 4: 3-story, type V-B construction, 25,273 SF, group R-2 occupancy and 3,976 SF, group U occupancy. Special inspection required for fabricator, steel, concrete, masonry, wood, soil, post tension slab. Deferred fire alarms and access control. Results in CoO. Ref: PMT24-07220 for primary permit.
DR Horton would like to submit for our model home site and sales office for review and approval. Sales office is a temporary conversion of the garage that will be converted back at community close-out.
Minor repairs to 1 roof truss and 4' of wall framing per structural report. Repairs to unit fire separation, insulation, and finishes. No changes to building.
Work that generates noise outside of these hours requires approval and an after-hours permit. After-hours requests are evaluated on a case-by-case basis. While we understand there are situations where extended work hours are beneficial, the City must also consider the impact on surrounding properties. Requests that would disrupt nearby residential neighborhoods during typical sleeping hours are generally not approved. Projects located in primarily commercial or industrial areas, where resident
Please do not request inspections under this permit until 2 business days after permit issuance.Ground work Existing antenna relocate
Please do not request inspections under this permit until 2 business days after permit issuance.installing 1washing machine
Please do not request inspections under this permit until 2 business days after permit issuance.wiring and bonding of fiberglass pool
Please do not request inspections under this permit until 2 business days after permit issuance.Rewire new basement.
Please do not request inspections under this permit until 2 business days after permit issuance.On existing tower, AT&T plans to remove 8 antennas and 9 radios. Install 5 antennas and 9 radios. Remove 6 TMAs. On the ground, on existing concrete pad, remove 2 cabinets, 1 power plant, and 1 battery cabinet. Install 1 cabinet, 1 power plant and 1 battery cabinet. There will be no structure
Please do not request inspections under this permit until 2 business days after permit issuance.Fuel switch NG water heater to heat pump water heater Run new circuits for the water heater and stove.
Please do not request inspections under this permit until 2 business days after permit issuance.Electrical work for one bathroom light, outlets, bathroom fan
Please do not request inspections under this permit until 2 business days after permit issuance. 2- 200 amp panel/ats, 1 subpanel
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of internally illuminated channel letter sign to building wall. connecting to existing primary power.
Please do not request inspections under this permit until 2 business days after permit issuance.Dedicated 60-amp level 2 circuit. Wired from right panel thru basement and mounted on left side wall of garage. Install 60amp rated wire with 40amp GFCI breaker for Kiln
Please do not request inspections under this permit until 2 business days after permit issuance.Panel replacement in apartment #1013
Please do not request inspections under this permit until 2 business days after permit issuance.Replace panel in apartment # 306