PermitDig

Search Permits

248,074 results

Please do not request inspections under this permit until 2 business days after permit issuance.Generator install--this is a reapplication for an expired permit.

2673 MCCOMAS AVE, Kensington
Oct 12

Please do not request inspections under this permit until 2 business days after permit issuance.200 amp heavy up

9701 CULVER ST, Kensington
Oct 12

Please do not request inspections under this permit until 2 business days after permit issuance.PRIMARY WIRING OF NEW DWELLING

4604 FAIRFIELD DR, Bethesda
Oct 12

Please do not request inspections under this permit until 2 business days after permit issuance.Replacing panel--200 amps

20653 BEAVER RIDGE RD, Montgomery Village
Oct 12

New 2166 SF single story residence with a 2+ car garage at Hawes Crossing. New water, gas and electric meters. Special inspection for post tension slabs - SEE ADDENDA MST25-07603 - Ref: MST26-08010 for 2024 code update.

3840 S GLADIOLUS CIR, Mesa
Oct 11

Adding a 50 amp circuit for a car charger. I will install the circuit back-to-back from the main electrical panel in the garage. I am also installing the charger.

11540 E REUBEN AVE, Mesa
Oct 11

Please do not request inspections under this permit until 2 business days after permit issuance.Remove existing 8 space subpanel and install 1 new 20 space subpanel in same location. Install 3 new circuits 2 for the exterior and one for interior for general purpose.

14018 LOBLOLLY TER, Rockville
Oct 11

Please do not request inspections under this permit until 2 business days after permit issuance.New 240 volt circuit 60 amps for new EVSE inside the Garage.

22588 CASTLE OAK RD, Clarksburg
Oct 11

Please do not request inspections under this permit until 2 business days after permit issuance.Electrical work for a deck/sunroom, including receptacles, light fixtures, and subpanel.

18909 CATHEDRAL DR, Gaithersburg
Oct 11

Please do not request inspections under this permit until 2 business days after permit issuance.Lights, switches, and outlets installations

11300 ROLLING HOUSE RD, Rockville
Oct 11

Please do not request inspections under this permit until 2 business days after permit issuance.Install one 48-amp car charger with 20' of trench

13511 BARTLETT ST, Rockville
Oct 11

Please do not request inspections under this permit until 2 business days after permit issuance.REPLACE DAMAGED/OUTDATED 200A PANEL WITH NEW 200A MAIN BREAKER PANEL. REPLACE EXISTING 200 LINE AND LOAD SIDE TAILS WITH NEW 200A NEW LINE AND LOAD SIDE SERVICE TAILS

11713 FARMLAND DR, Rockville
Oct 11

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (25) ROOF MOUNTED SOLAR PANELS, (25) MICRO INVERTERS, ONE 50A LINE SIDE TAP, 10.750 KW

11169 MARYLAND MANOR CT, Germantown
Oct 11

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (29) ROOF MOUNTED SOLAR PANELS, (29) MICRO INVERTERS, ONE 50A LINE SIDE TAP, 12.760 KW

14 FREAS CT, Gaithersburg
Oct 11

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (26) ROOF MOUNTED SOLAR PANELS, (26) MICRO INVERTERS, ONE 60A FUSED LINE SIDE TAP, 11.440 KW

11713 FARMLAND DR, Rockville
Oct 11

14x20 covered pergola from a kit with Home Depot there are no and will not be any construction plans.  It will be cemented in then ground on each post and can be removed easily.

4830 E GARY ST, Mesa
Oct 10

Please do not request inspections under this permit until 2 business days after permit issuance.Residential Sauna

10113 GRANT AVE, Silver Spring
Oct 10

Please do not request inspections under this permit until 2 business days after permit issuance.Typical pole service for construction

10800 KESWICK ST, Garrett Park
Oct 10

Please do not request inspections under this permit until 2 business days after permit issuance.Bathroom and Walk-in Closet -Interior Renovation

3514 RAYMOOR RD, Kensington
Oct 10

Please do not request inspections under this permit until 2 business days after permit issuance.Run feed for new pool and hot tub. Wire pump, wire auto cover, wire lights add service receptacle.

4029 GLENROSE ST, Kensington
Oct 10

Please do not request inspections under this permit until 2 business days after permit issuance.Upgrade existing 100A electrical service to 200A (Heavy Up). Replace main electrical panel, meter socket, and service entrance cable. Upgrade grounding and bonding as required.

11407 GRAYLING LN, Rockville
Oct 10

PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR

1630 W ALCOTT ST, Mesa
Oct 9

Extension of existing circuit from house to pergola to control lighting and fan. No special inspections. Minimum required building inspections: Electric rough in and electric final.

2421 N MALACHITE, Mesa
Oct 9

Tenant improvement in existing type II-B construction, mix group S-1, B, H-3, S-2 and F-1 occupancy hanger facility at Mesa Gateway Airport. Modification include converting 331 SF of group F-1 space into B occupancy conference room, new partitions and doors to create conf room with new ceiling, millwork, lighting and power, new ductwork from existing units. Improvements continue in existing training breakroom area to provide new countertop with sink and appliances with associated elec and plumb

5615 S SOSSAMAN RD, Mesa
Oct 9

CONSTRUCT A 637 SF SWIMMING POOL & 49 SF SPA WITH NATURAL GAS HEAT. INSTALLATION OF 183-FT OF 2-IN PE GAS LINE BURIED 18-IN DEEP WITH 18 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER, 18-FT OF 1-IN PE GAS LINE TO 40K BTU BUILT IN KITCHEN. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & SW/COMGAS REQUIREMENTS. SW/COM GAS TO DETERMINE IF METER NEEDS TO BE UPGRADED. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCT

5451 S BENTON, Mesa
Oct 9

CONSTRUCT A 645 SF SWIMMING POOL & 56 SF SPA WITH NATURAL GAS HEAT. INSTALLATION OF 65-FT OF 2-IN PE GAS LINE BURIED 18-IN DEEP WITH 14 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER WITH EXISTING RAMADA, SLIDE, AND GROTTO. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & SW GAS REQUIREMENTS. SW GAS TO DETERMINE IF METER NEEDS TO BE UPGRADED. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGIN

10344 E TRILLIUM AVE, Mesa
Oct 9

Install one non-illuminated reverse pan channel lettersets on building using existing refurbished signage. WUDEL INTERNATIONAL 52 sq. ft.

7320 E PECOS RD 115, Mesa
Oct 9

200a panel replacement like for like

8255 E KILAREA AVE, Mesa
Oct 9

Existing 195,621 SF building, type V-B type construction, group F-1, B and S-1 occupancy, including an existing 2,884 SF, type IIB construction, group F-1 occupancy utility building. This submission covers the work for phase 2 such as the site equipment in the utility station and on the site pads. It also includes, in the building, the cleanroom walls and ceiling panels, owner equipment, engineered MEP systems, pipe racks, ceilings. Ref: PMT24-18579 for Phase 1. DEFERRED FIRE SPRINKLERS. DEFERRE

3265 S CRISMON RD, Mesa
Oct 9

Please do not request inspections under this permit until 2 business days after permit issuance.Heavy up existing service to property. Install 200 ampere equipment

2612 HENDERSON AVE, Silver Spring
Oct 9