Search Permits
247,466 results
Please do not request inspections under this permit until 2 business days after permit issuance.LIKE FOR LIKE REPLACEMENT OF HEAT PUMP AND GAS FURNACE
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of EV charger
Please do not request inspections under this permit until 2 business days after permit issuance.EV Charger Installation
Please do not request inspections under this permit until 2 business days after permit issuance.HEAVY UP OF 400AMP.
Please do not request inspections under this permit until 2 business days after permit issuance.Sunroom renovation
Please do not request inspections under this permit until 2 business days after permit issuance. Remove and replace defective inverter. No other changes or upgrades to occur from original installation.
Please do not request inspections under this permit until 2 business days after permit issuance. install GFI protected receptacle for wood burning fireplace
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of roof top solar system.
Please do not request inspections under this permit until 2 business days after permit issuance.REPLACE THE DAMAGED 200A LOAD SIDE SERVICE TAIL WITH NEW 200A LOAD SIDE SERVICE TAIL.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (26) ROOF MOUNTED SOLAR PANELS, (26) MICRO INVERTERS, ONE 60A LINE SIDE TAP, 11.440 KW
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (30) ROOF MOUNTED SOLAR PANELS, (2) MICRO INVERTERS, 60A FUSED LINE SIDE TAP, 13.200 KW
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (64) ROOF MOUNTED SOLAR PANELS, (64) MICRO INVERTERS, ONE 150A FUSED LINE SIDE TAP, 28.160 KW
Please do not request inspections under this permit until 2 business days after permit issuance.REPLACE EXISTING 150A PANEL WITH NEW 200A MAIN BREAKER PANEL. REPLACE EXISTING 150A LINE AND LOAD SIDE SERVICE TAILS WITH NEW 200A LINE AND LOAD SIDE SERVICE TAILS.
Please do not request inspections under this permit until 2 business days after permit issuance. Remove and replace defective inverter. No other changes or upgrades to occur from original installation.
Install a new electrical circuit from the existing electrical panel through the attic and garage wall to serve a new mini-split system. \No special inspections. Minimum required building inspections: Electric rough in and electric final.
TI of an existing 1,519 SF, construction type V-B, B and M occupancy. Scope includes new interior partitions, sales/display area, office/support spaces, finishes, doors, and MEP's. Deferred fire sprinklers. Results in CoO.
CONSTRUCT A 435-SF SWIMMING POOL. NO SPA. NO GAS. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT NO.58912, EXPIRES 12-31-26. ENGINEERING AND STRUCTURAL CALCULATIONS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS.
PLUMBING PERMIT TO REPLACE SHOWER LIKE-FOR-LIKE. REPLACING PAN, DRAIN, AND VALVES. USING A SHOWER ROD, NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
Addition of a 1080 Square Foot detached pool house to existing SFR. New structure not to be used as an ADU. Deferred Truss Submittal. NO GAS. Minimum required building inspections: Plumbing underground, footing, stem, strap/shear, frame, mechanical rough in, electric rough in, plumbing rough in, insulation, drywall shear, mechanical final, electric final, plumbing final and final.
INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR AN EMPORIA CLASSIC LEVEL 2 WALL CONNECTOR VEHICLE CHARGER AND A 50 AMP DEDICATED BREAKER FOR A NEW NEMA 14-50R RECEPTACLE IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
Construction of 355 sq ft livable addition with attached 120 sq ft storage under new awning with ceiling joists, electric and plumbing for bathroom, washer and dryer on raised deck. Awning engineering provided by Carl Putnam no. 39702, expires 9-30-27. 200 sq ft parking area and 104 sq ft covered deck. Type V-B construction. No deferred items. No special inspections. Minimum of one 9-ft x 18-ft unobstructed paved parking space required behind front setback on 2-in asphalt or 4-in concrete. Minim
Replacement of 200 Amp (or less) electric panel - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. THE ACT OF SELF DISCONNECTING UTILITY WIRES OR METERS IS PROHIBITED AND MAY CAUSE DAMAGE OR INJURIES. Failure to schedule disconnect may result in additional utility trip charge fees and charges for any damage to utility equipment. Please contact your applicable utility (either SRP at 602
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Tenant improvement in existing 1,331 SF, type I-A construction, B occupancy café/bar. Modifications include sawcut of concrete slab for plumbing, new install to include new interior walls, finishes and fixtures to create Kitchen, coffee and bar area with (2) ADA restroom and dining area and associated MEP scope. Deferred fire sprinklers and fire alarm. Approved with comments. Results in CoO.
Install one new illuminated building sign on building 18 east elevation 106 s.f - LOGO MPCA. Replace one (1) existing building sign on building number (1) non illuminated reverse pan channel letters on backer panel 38 s.f. - MPCA MGC PURE CHEMICALS AMERICA, INC. Replace monument sign face. Reviewed as noted. Any future sign requests will require a Comprehensive Sign Plan, as the maximum allowable number of signs for the HI District has been reached.
NTT Data Centers: +/- 6,000 cubic yard stockpile
CONSTRUCT A 555 SF SWIMMING POOL & 49 SF SPA WITH EXISTING 120 GAL PROPANE TANK UNER PMT25-22357. INSTALLATION OF 128-FT OF 1.5-IN PE GAS LINE BURIED 18-IN DEEP WITH 18 GAUGE TRACER WIRE FROM PROPANE TANK TO 400K BTU POOL HEATER, 16-FT OF .75-IN PE GAS LINE TO 87K BTU BBQ. ALL GASLINE TO BE INSTALLED PER 2024 IFGC & FPD 6104.1. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT #5891
Fire Alarm Control Panel replacement
Tenant improvement 10,692 SF of 269,917 SF, 3-story, type II-A construction B occupancy office bldg. Modifications include demo existing restroom facility on 1st and 2nd level, removing walls and fixtures to reconfigure restroom to add additional water closet for each gender at each restroom facility and associated MEP. Deferred fire sprinklers. Results in CoC.
Install new storage racks in an existing warehouse suite. Tenant improvement for new business under PMT26-16185. Special inspections required: post-installed anchors. Results in CofC.