PermitDig

Search Permits

247,466 results

Please note that before a damage permit is issued an estimate showing the Company doing the work, the subject address, scope of work, materials, and labor from either the contractor or the insurance company will be required. A written scope of work is required to approximate the cost of the permit, verbal estimations shall not be used. A completed Contractor Verification Form must also be submitted prior to being issued a permit. This structure is to be restored like for like construction

6554 E RUSSELL ST, Mesa
Oct 19

Remove old existing 200-amp service and replace with new 200-amp combo meter/breaker panel.

1041 W DRAGOON AVE, Mesa
Oct 19

Please note that before a damage permit is issued an estimate showing the Company doing the work, the subject address, scope of work, materials, and labor from either the contractor or the insurance company will be required. A written scope of work is required to approximate the cost of the permit, verbal estimations shall not be used. A completed Contractor Verification Form must also be submitted prior to being issued a permit. This structure is to be restored like for like construction

2535 E CARMEL AVE, Mesa
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a burglary system with hw devices, panel, and wired touchpad.

10225 HOLLY HILL PL, Potomac
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.Rough Wire, Final

15424 INDIANOLA DR, Rockville
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a burglary system with hw devices, panel, touchpad, and Flood camera.

8140 HARTFORD AVE, Silver Spring
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a burglary system with hw devices, panel, touchpad, and three outdoor cameras.

605 BURNT MILLS AVE, Silver Spring
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.Celebree School - Fit Out Basement + 3 floors- New 200 amp Meter & Service Disconnect- on 480/227v Retail Trough in Basement, New 200 amp 480/277 v MCB Panel - Outside Celebree Basement Telcom Room.2- Existing 480/277v Panels & 45kvaTransformer in Celbree Electric Room, 2 - 208/120v Existing Panel in same Room, Fed from Existing 400amp Meter & 400 amp Fused Disconnect on Retail T

7617 ARLINGTON RD, Bethesda
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a burglary system with hw devices, panel, and tgwo outdoor cameras.

12608 BRIGHT SPRING WAY, Boyds
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.Heavy up 100 amp to 200 amp

2209 COFFEEWOOD CT, Silver Spring
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.240v Dedicated Circuit for EV Charger

14421 RICH BRANCH DR, Gaithersburg
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.This is the electrical work for a solar panel system including a new subpanel/primary disconnect and a lineside tap connection.

16809 CASHELL RD, Olney
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.Level 2 EV charger hardwired installation inside the garage.

3808 TERRAWOOD CT, Rockville
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALLATION OF ERRCS/BDA SYSTEM.

8505 SPRINGVALE RD, Silver Spring
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.Customer Wants To Use ePlans,Installation of solar panels on the rooftop in 2 arrays: -Array 1: 10 panels, Array 2: 9 panels.

2613 SPENCER RD, Chevy Chase
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.Install (1) 100A breaker Install (1) electrical panel with capacity for 8 breakers Install (4) 20A breakers Install (1) electrical switch Install (6) electrical outlets Install (6) light fixture

8807 FLOWER AVE, Silver Spring
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.install 24 kw with 1 200 amp service rated transfer switch

17703 HIDDEN GARDEN LN, Ashton
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.200 amp heavy up

6002 MILO DR, Bethesda
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.Rough-in and trim-out electrical for two bathrooms.

9504 RILEY RD, Silver Spring
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.WIRE BATHROOM AS PER CODE.

20447 AMBASSADOR TER, Germantown
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.

10211 LEWIS DR, Damascus
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.Install 100 amp subpanel in mechanical room and run new circuits for new pergola being installed in back yard of house

14657 SENECA FARM LN, Germantown
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.replace some kitchen equipment

18857 CROSS COUNTRY LN, Gaithersburg
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.HEAVY UP 200 AMPS

9403 KINGSLEY AVE, Bethesda
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.New 240 volt circuit for EVSE outside near driveway.

4908 AURORA DR, Kensington
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (33) ROOF MOUNTED SOLAR PLANS, (33) MICRO INVERTERS, ONE 70A LINE SIDE TAP, 14.520 KW

8404 PITTSFIELD CT, Potomac
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (38) ROOF MOUNTED SOLAR PANELS, (38) MICRO INVERTERS, ONE 80A LINE SIDE TAP, 16.340 KW

19009 ALPENGLOW LN, Brookeville
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.Install 11 rooftop solar panels 4.95kW.

1305 DILSTON RD, Silver Spring
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.Install 23 rooftop solar panels 10.35kW.

13605 DUHART RD, Germantown
Oct 19

Please do not request inspections under this permit until 2 business days after permit issuance.

7500 OLD GEORGETOWN RD, Bethesda
Oct 19