PermitDig

Search Permits

247,466 results

Installation of a 60A dedicated circuit breaker for a wall connector hardwired tesla vehicle charger in the garage. Also, a 30A dedicated circuit breaker for a Mini-Split in the garage. Minimum required building inspections: Electric rough in and electric final.

6234 S ARCHER, Mesa
Oct 21

Installation of one 91 sq. ft. LED Halo Lit Illuminated Reverse Pan Channel Lettersets on North Elevation of Building AMPHENOL INDUSTRIAL. Signs shall be installed per NEC 2023 with UL listed components.

1907 S HOBSON 101, Mesa
Oct 21

approximately 860 SF of renovated area in an existing commercial/light industrial facility owned and operated by FujiFilm as the sole tenant and LL. Renovations are targeted to a very small area in the building and involve only minor structural upgrades plus renovations to the existing architectural, mechanical, electrical, and life safety systems. There are no hazardous materials to be considered in this scope of work.

6550 S MOUNTAIN RD, Mesa
Oct 21

Install one double faced internally LED illuminated detached sign 10' x 7'4". Sign area 32 sq.ft. Power supplied from new building electrical panel REF: PMT24-19661. Results in CofC.

1118 W GUADALUPE RD, Mesa
Oct 21

This is in city of Mesa Right of Way need Green Tag PMT. Have received UTL permit from engineering . UTL26-00442. Verizon Small Wireless Facility.

740 N HIGLEY RD, Mesa
Oct 21

room addition

111 S GREENFIELD RD 614, Mesa
Oct 21

New service/maintenance building at an existing RV dealership lot.

2038 N COUNTRY CLUB DR, Mesa
Oct 21

NO work or changes will be done to the office space. The previous CO included 449 & 455. I am only using 455 for the clinic space. The floor plan is attached.

457 E 4TH PL, Mesa
Oct 21

ADMINISTRATIVE USE PERMIT PER SEC.11-70-3 OF THE ZONING ORDINANCE FOR A TEMPORARY SALES OFFICE AND MODEL HOME COMPLEX WITHIN A RESIDENTIAL ZONING DISTRICT FOR HOMES BEING CONSTRUCTED IN THE IMMEDIATE SUBDIVISION, SUBJECT TO THE SITE PLAN APPROVED WITH THIS PERMIT. APPROVAL OF THE SALES OFFICE AND MODEL HOMES MAY BE GRANTED FOR A 3 YEAR PERIOD, OR UNTIL ALL HOMES IN THE SUBDIVISION ARE COMPLETED, WHICHEVER OCCURS FIRST. ORD. 873 ALLOWS EXTENSION IF NEED IS SHOWN. GARAGE AREA MODIFIED OR IMPROVE

Unknown, Mesa
Oct 21

THIS PERMIT IS TO UPGRADE TO A 225A SERVICE PANEL WITH A 200A BREAKER. INSTALLATION SHALL COMPLY WITH CITY OF MESA CODES AND SERVICING ELECTRIC UTILITY REQUIREMENTS. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR PERMIT. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHARGES FOR ANY DAMAGE TO DISTRIBUTION EQUIPMENT. PERMIT DOES NOT INCLUDE PV SOLAR SYSTE

2744 S EMERSON CIR, Mesa
Oct 21

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL CONNECTDER METER ADAPTER WITH INTEGRATED 60A PV BREAKER.

3407 FLORAL ST, Silver Spring
Oct 21

Please do not request inspections under this permit until 2 business days after permit issuance.Install 24kw Generator with 1 200 amp service rated transfer switch

106 ASHTON KNOLLS LN, Ashton
Oct 21

Please do not request inspections under this permit until 2 business days after permit issuance.LOW VOLTAGE WIRING FOR TH

8643 ERDEM PL, Chevy Chase
Oct 21

Please do not request inspections under this permit until 2 business days after permit issuance.PV SOLAR PANEL INSTALLATION ROOF MOUNTED 39 MODULES-ROOF MOUNTED - 15.990 kW DC, 13.611 kW AC INSTALL NEW SERVICE RATED TAP BOX

12312 TAMPICO WAY, Silver Spring
Oct 21

Please do not request inspections under this permit until 2 business days after permit issuance.Low Voltage Security at Samsung Biologics Rockville Campus

9911 BELWARD CAMPUS DR, Rockville
Oct 21

Please do not request inspections under this permit until 2 business days after permit issuance.SFD / INSTALL (21) ROOF MOUNTED SOLAR PANELS. SYSTEM SIZE 14.88 KW DC

17117 CHISWELL RD, Poolesville
Oct 21

Please do not request inspections under this permit until 2 business days after permit issuance.Installation ass-on of one outdoor camera.

1123 HEARTFIELDS DR, Silver Spring
Oct 21

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL 200 AMPS SERVICE FOR COMCAST POWER SUPPLY AT 2900 Olney Sandy Spring Road Olney, MD 20832. PEPCO WO# 21075115

2900 OLNEY SANDY SPRING RD, Olney
Oct 21

Please do not request inspections under this permit until 2 business days after permit issuance.Installing a new 50A EV charger outlet on the house near the meter

105 GRAFTON ST, Chevy Chase
Oct 21

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL 200 AMPS SERVICE FOR COMCAST POWER SUPPLY AT 14007 Rolling Pasture Road Boyds, MD 20841. Potomac Edison WR# 64751418

14007 ROLLING PASTURE RD, Boyds
Oct 21

Please do not request inspections under this permit until 2 business days after permit issuance.PANEL UPGRADE TO HEAVY UP FROM 150 AMP TO 200 AMP

906 PLAYFORD LN, Silver Spring
Oct 21

Please do not request inspections under this permit until 2 business days after permit issuance.200A heavy-up

14124 RIPPLING BROOK DR, Silver Spring
Oct 21

Please do not request inspections under this permit until 2 business days after permit issuance.New ADU to receive 125A sub panel from existing house, new outlets rough-in, 28 recessed lights rough-in, electrical for mini split system, dryer, washer, range.

12613 NEWGATE RD, Rockville
Oct 21

Please do not request inspections under this permit until 2 business days after permit issuance.This is for suite 200 Installing illuminated sign

12401 MIDDLEBROOK RD, Germantown
Oct 21

Please do not request inspections under this permit until 2 business days after permit issuance.Install 1 dedicated 20amp, 120v. circuit for a duplex receptacle in the garage

11400 STRAND DR, Rockville
Oct 21

Please do not request inspections under this permit until 2 business days after permit issuance.Heavy Up 400, Two Panels 200 Amps Recessed lights, Receptacles and Switches Appliances Furnaces and AC Units Smoke detectors Water Heater

5710 LONE OAK DR, Bethesda
Oct 21

Please do not request inspections under this permit until 2 business days after permit issuance.Upgrade Electrical Panel from 200amps to 400amps, Pepco Overhead Service.

4313 BRADLEY LN, Chevy Chase
Oct 21

Please do not request inspections under this permit until 2 business days after permit issuance.Wire for 200 amp heavy up

10802 LOMBARDY RD, Silver Spring
Oct 21

Please do not request inspections under this permit until 2 business days after permit issuance.Modular Home 400 Amp Service 2 HVAC systems with back up heat

12608 BILLINGTON RD, Silver Spring
Oct 21

Please do not request inspections under this permit until 2 business days after permit issuance.Facility pool

16000 COLUMBUS AVE, Rockville
Oct 21