Search Permits
246,803 results
Please do not request inspections under this permit until 2 business days after permit issuance.Install 16 rooftop solar panels 7.2kW with 60A ConnectDer Meter Adapter and fused AC disconnect.
Please do not request inspections under this permit until 2 business days after permit issuance.Heavy up service from 100-200 amps
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (22) ROOF MOUNTED SOLAR PANELS, (22) MICRO INVERTERS, ONE 45A LINE SIDE TAP, 9.680 KW
Please do not request inspections under this permit until 2 business days after permit issuance.Install 29 rooftop solar panels 13.05kW.
Please do not request inspections under this permit until 2 business days after permit issuance.MODIFY EXISTING FIRE ALARM SYSTEM ADD ONE STROBE ON FIRST FLOOR A110
Please do not request inspections under this permit until 2 business days after permit issuance.To Replace Service Panel
Please do not request inspections under this permit until 2 business days after permit issuance.CUSTOMER WANTS TO USE EPLANS INSTALL 69 ROOF MOUNTED SOLAR PANELS ENERGY STORAGE SYSTEM
Please do not request inspections under this permit until 2 business days after permit issuance.Service upgrade to 200amps
Please do not request inspections under this permit until 2 business days after permit issuance.Interior alterations 1,685 sq ft 1 RTU
Please do not request inspections under this permit until 2 business days after permit issuance.Low voltage wiring of whole house Data/video, security, & network
Please do not request inspections under this permit until 2 business days after permit issuance.house rewire with 80 lights, 100 outlets and 40 switches
Please do not request inspections under this permit until 2 business days after permit issuance.200 amps main panel replacement only with new equipment ground, meter can and service wire will remain as existing. 1 whole house surge protector.
Please do not request inspections under this permit until 2 business days after permit issuance.Wire for 200 amp heavy up
Please do not request inspections under this permit until 2 business days after permit issuance.Install 6 antennas and 9 radios.
The project consists of the development of a new shops building and the associated paved access, parking, utility, and drainage infrastructure. No landscape meter. REF: PMT26-11817 Building permit.
Install (1) wall mounted non illuminated reverse pan channel letters: LOGO WEALTH MANAGEMENT - 12 sf
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. IF EQUIPMENT IS MOUNTED TO AN H-FRAME, THE H-FRAME SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC
Install one LED illuminated pan channel letter sets and logo on existing raceway SALON CENTRIC 36 sq. ft. Signs shall be installed per NEC 2023 with UL listed components.
Install two masonry LED illuminated monument signs. Results in CofC.
Install an additional new electrical meter 200A 3 phase (4 of 4 meters) and interior electrical panel at an existing building for a future tenant. Approve as Noted. Results in CofC.
Install flag banner from 8/19-9/18
Replace damaged monument sign from car accident. Ref original sign permit PMT17-06143. Install one monument/directional sign along Rio Salado Pkwy in front of the Cubs Spring Training Facility (Sloan Park) at entrance located 28' back of curb at Clark St and 30' from Rio Salado back of curb to leading edge of sign. 86 sq ft with 11'-8" to top of copy.
Install one LED illuminated pan channel letter sets and logo with pill box flush mounted to front fascia of suite SLICED INDOOR GOLF 25 sq. ft. Signs shall be installed per NEC 2023 with UL listed components.
Group S-1 and B occupancies. Type V-B construction. 29,754 SF. Occupant load 110. New office in existing warehouse suite. New partition walls inside to create a spec office area, break room, conference room, open office, IT/storage room, janitor room, and (4) ADA compliant restrooms. (2) new mechanical heat pump RTUs. New supply air ducting, new return air ducting, new exhaust fans at restrooms. New plumbing fixtures, water supply lines, and waste lines. Special inspections required: steel const
Add 3ph, 480v 800a multi metering Service Section with new HVAC in hangars
Encroachment Permit for outdoor dining area. Related to PMT26-14204 for TI and occupancy. Results in CoC.
CONSTRUCT A 520-SF SWIMMING POOL. NO SPA. NO GAS. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER - ALAN E. MONEY NO. 30895, EXPIRES 12-31-26. REF MST26-01206. ENGINEERING AND STRUCTURAL CALCULATIONS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL AND SPA CODE WITH ALL CITY OF MESA AMEN
Install two (2) LED illuminated building signs North and South elevations. 78 SF each THE MATTRESS SHOP tagline BY BROOKLYN BEDDING. (1) monument sign panel (monument sign installed under PMT25-07524). Power to building signs under tenant improvement (PMT26-10346). Approved as Noted. Results in CofC.
Temporary job trailer for new commercial building PMT25-11698
Previously completed install of equipment pit at an existing automotive service building. Sealed structural engineering construction review letter provided. Results in CofC.