Search Permits
246,803 results
Please do not request inspections under this permit until 2 business days after permit issuance. Install 10 1080p 1920 TVl camera and 1 20'' flat screen security alarm MONITOR
Desert Uplands Envelope lot - All work related to swimming pool and spa is within the existing temporary fence. No new disturbance with this permit. The temporary fence is required to remain in place per the approved site plan at all times during construction. All areas out of the approved disturbance area shall remain undisturbed at all times. Property line fencing is not permitted. A separate zoning inspection is required prior to final building inspection. Reference temporary fence permit P
Install new Navien NPE 240A tankless water heater in existing accessory building. Minimum required building inspections: plumbing final and final.
Livable breakdown includes 300 SF master bedroom addition to existing residence and new 992 SF detached ADU. Non-livable area consists of 135 SF covered porch. Type V-B construction. New 200 amp SES. No upgrade to existing water meter. Minimum required building inspections: Plumbing underground, footing, stem, pad elevation (conditional hold), strap/shear, frame, mechanical rough in, electric rough in, plumbing rough in, insulation, drywall shear, mechanical final, electric final, plumbing final
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
NTT Global Data Centers Americas is adding an additional Data Center building in Mesa, Arizona as part of a 244MW master planned site. PH6 will consist of 8 vaults with prefabricated UPS electrical power modules, generators and closed loop air-cooled chillers located on the exterior. The initial buildout will consist of a core and shell, underground utilities and equipment pads, and a single 8 MW vault with 56 MW future vaults 2 through 8. The envelope will consist of tilt up concrete panels wit
Tenant improvement of existing 1,975 SF, type VB construction, A2 occupancy suite for Brewery Restaurant with (3) areas of outdoor dining for total of 615 SF. Some demo included in this permit to include saw cutting for underground plumbing and exterior windows. Modifications include new bar, (2) ADA restrooms, kitchen, dining area. Encroachment Application must be submitted and reviewed under separate permit. Special inspection req. steel, concrete, special cases, Soils, Type I hood grease duc
Interior tenant improvement. Deferred fire sprinklers.
CONSTRUCT A 450-SF SWIMMING POOL. NO SPA. NO GAS. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: JESSE LIGHT NO.58912, EXPIRES 12-31-26. ENGINEERING AND STRUCTURAL CALCULATIONS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA AMENDMENTS.
Electrical infrastructure upgrade for the whole park.
Tenant improvement remodel for restaurant. Interior Demo: PMT26-14990. Deferred fire sprinklers. Approved as noted.
Install temporary backup Generator until SRP installs new electrical power to the site. Ref: PMT25-17100. 20’ x 8’ generator to be temporarily located in the rear of the existing Sprouts building for the duration of building construction in conjunction with an active building permit. Approved ADM26-00757. Reviewed as noted. Results in CoC.
Emergency Responder Radio Communication System
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO S
Outpatient facility. Group B occupancy. Type V-B construction. 7,970 SF. Occupant load 194. Existing building with multiple suites. Demo portions of demising walls to combine all suites. New partition walls and interior doors. Less than 15 fire sprinklers to be added/modified. Approved as noted. Results in CofO.
Existing warehouse building with spec office. Install demising wall in warehouse area, warehouse lighting, and relocate electrical panel. Approved as Noted. Results in CofC.
Replace fire sprinkler system for riser 7 and for RP7 first floor only. Approved with Stipulation.
DUPLICATE CERTIFICATE OF OCCUPANCY - NAME CHANGE ONLY FOR TEAR IT UP BURGERS LLC RESTARAUNT, 5247 SQ FT DINING AREA. A-2.2 OCCUPANCY, MAX 198 OCCUPANT LOAD. EXISTING TYPE VB CONSTRUCTION. NO WORK UNDER THIS PERMIT. PREVIOUS RECORD SHOW C OF O FOR JJ'S GRUB SHACK, REFERENCE PERMIT PMT21-19335. THE INTENTION OF THIS PERMIT IS TO DUPLICATE PREVIOUSLY PERMITTED OCCUPANCY CLASSIFICATION ONLY. THIS PERMIT REQUIRED DOES NOT AUTHORIZE OR APPROVE UNPERMITTED CONSTRUCTION. EXISTING OCCUPANCY AS DEFINED I
Construction of a new shower in existing closet in bathroom of existing SFR. Adding new drain and using existing water supply in bathroom. VB Construction. Minimum required building inspections: Frame, plumbing rough, plumbing final and final. If needed, underground plumbing.
CONSTRUCT A 736-SF SWIMMING POOL & 64-SF SPA WITH NATURAL GAS HEAT. INSTALLATION OF 90-FT OF 2-IN PE GAS LINE BURIED 18-IN DEEP WITH 14-GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER, 15-FT OF 2-IN PE GAS LINE TO 65K BTU BBQ, AND 25FT OF 2-IN PE GAS LINE TO 50K FIRE PIT. ALL GAS LINES ARE TO BE INSTALLED PER 2024 IFGC & COM GAS REQUIREMENTS. COM GAS TO DETERMINE IF THE METER NEEDS TO BE UPGRADED. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCE
CONSTRUCT A 394-SF SWIMMING POOL AND A 49-SF SPA. NO GAS UNDER THIS PERMIT. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER - ALAN E. MONEY NO. 30895, EXPIRES 12-31-26. REF MST26-01206. ENGINEERING AND STRUCTURAL CALCULATIONS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL AND SPA CODE
CONSTRUCT A 465-SF SWIMMING POOL AND 86-SF SPA. NO GAS. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: MICHAEL J. KING NO.37380, EXPIRES 03-31-29. REF MST26-01206. ENGINEERING AND STRUCTURAL CALCULATIONS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL & SPA CODE WITH ALL CITY OF MESA
Demo existing oven in bakery of Costco. New oven and associated MEP. Approved as noted. Results in CofC.
CONVERT EXISTING 133 SQ FT SCREEN ROOM INTO ARIZONA ROOM WITH ELECTRIC. NO PLUMBING UNDER EXISTING AWNING ON SLAB. REFERENCE HOST PERMIT 175116 FOR MH SET WITH ACCESSORY STRUCTURES - AWNING, 64 SF SHED AND SCREEN ROOM. NO CHANGES TO THE SHED UNDER THIS PERMIT. MINIMUM TWO 9-FT X 18-FT PAVED UNOBSTRUCTED PARKING SPACES ON 2-IN ASPHALT OR 4-IN CONCRETE REQUIRED BEHIND FRONT SETBACK WITH A MINIMUM OF ONE COVERED. MINIMUM SETBACKS FOR THIS INTERIOR LOT ARE 5-FT FRONT, 10-FT REAR, 5' SIDES, STREET SI
Install 44.84 sq ft wall mounted face lit channel lettering WOK & GO ASIAN RESTAURANT.
Install one 32 sq. ft. LED illuminated pan channel letter sets and logo to front fascia of suite BROKEN RICE. Signs shall be installed per NEC 2023 with UL listed components.
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR AUTEL MAXICHARGER AC VEHICLE CHARGER HARDWIRED. IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
CITY OF MESA ZONING CLEARANCE PERMIT ONLY FOR INSTALLATION OF 16-FT X 44-FT 2026 ABOVE-GROUND SET CLAYTON MANUFACTURED HOME SERIAL NO. BUC018112AZ. NO AC. NO GAS. ONE 13-FT X 40-FT ATTACHED AWNING PER ICCESR1398. NO OTHER ACCESSORY STRUCTURES AT THIS TIME. MINIMUM TWO 9-FT X 18-FT PAVED UNOBSTRUCTED PARKING SPACES ARE REQUIRED BEHIND FRONT SETBACK ONE PARKING SPACE REQUIRED TO BE COVERED. 40-FT X 60-FT INTERIOR LOT. MINIMUM SETBACKS: 5-FT FRONT, 5-FT REAR, 6-FT SIDES BETWEEN STRUCTURES. APPROVE
Install (7) EV charging stations. New electrical meter. Special inspection for electrical and structural items. Site was being permitted under PMT25-18205 but a new application was created to get reviewed under the current EV code.