PermitDig

Search Permits

246,803 results

Install new 100A electric sub-panel inside garage. Minimum required building inspections: Electric rough in and electric final.

1465 N BALBOA, Mesa
Oct 23

New 24kw Gas Generator Installation of 24kw generator, sub panel, transfer switch, and dedicated gas line. Minimum required building inspections: Electric rough in and electric final, Gas rough in and gas pipe final, and final.

10253 E AMPERE AVE, Mesa
Oct 23

Installation of two 120-gallon propane tanks, surface mounted to wall. Run 60-ft of .75-in galvanized gas line from tanks to 400k BTU pool heater. Gas lines to be wall mounted and shall be installed per 2024 IFGC, 2024 NFPA 58 & FPD 6104.1.

840 N ARVADA, Mesa
Oct 23

Install (2) sets of illuminated pan channel letters and (1) illuminated wall logo. 123 sq ft IGNITE, 37 sq ft ADVENTURE PARK and 74 sqft LOGO. Replace 2 monument sign panels.

1830 E BASELINE RD 109, Mesa
Oct 23

REPAIR TRUSS AT 10927 E Tillman Ave

10927 E TILLMAN AVE, Mesa
Oct 23

Building 2 (Suite 115). New detached shell building with stub up utilities to the spaces. Deferred fire sprinklers. Deferred fire alarm. Metal carport canopy under a separate permit. Special inspections required for: Steel, Concrete and Masonry construction. Deferred pre-engineered trusses and deferred prefabricated metal stairs. Results in CoC.

4523 E IVY ST, Mesa
Oct 23

Add patio to backyard of house.

811 S BRISTOL, Mesa
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.NEW TENANT INSTALLATION (LIGHT FIXTURE, OUTLET, LOW VOLTAGE)

3486 OLNEY LAYTONSVILLE RD, Olney
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a burglary system with hw devices, panel, touchpad, and three outdoor cameras.

9814 GARTRELL PL, Kensington
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.Install a roof-mounted 11.48 kW DC solar PV system with 28 Qcells modules, microinverters, Q.Home Combiner, two 60A AC disconnects, and line-side tap to the existing 200A main service panel.

19620 SELBY AVE, Poolesville
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a burglary system with hw devices, panel, touchpad, and two outdoor cameras.

11833 GAINSBOROUGH RD, Potomac
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.240v Dedicated Circuit for EV Charger

5812 COPPELIA DR, Rockville
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.1-150amps. panel, SEC.

6608 COCKERILLE AVE, Takoma Park
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.Panel Change - We are going to replace (1) existing 40 space 200A main panel with (1) new 60 space 200A panel

105 GRAFTON ST, Chevy Chase
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (32) ROOF MOUNTED SOLAR PANELS, (32) MICRO INVERTERS, 14.080 KW

9300 JUDGE PL, Montgomery Village
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.installation of a 24 kw stby generator with (2)200 amp ats

16711 ALEXANDER MANOR DR, Silver Spring
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.Provide, install and program (6) duct smoke detectors and (3) ahu relay shutdown modules.

8710 BROOKVILLE RD, Silver Spring
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.Install new channel letters on wireway.

8404 GEORGIA AVE, Silver Spring
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.Living Room Rewire (6 Outlets, 8 Recess Lights, 1 Surface Mount)

7115 WICK LN, Rockville
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.BAT ROOM

23413 WOODFIELD RD, Gaithersburg
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.Dedicated 60amp level 2 circuit. Circuit wired from left panel Wiring run thru basement and surface mounted in conduit in garage. Charger to be hardwired and mounted ront left side of garage on exterior

10517 AUBINOE FARM DR, Bethesda
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (13) ROOF MOUNTED SOLAR PANELS, (13) MICRO INVERTERS, ONE 30A LINE SIDE TAP, 5.720 KW

20635 HIGHLAND HALL DR, Montgomery Village
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.REPLACING EXISTING GAS GENERATOR. SAME SIZE/ SAME LOCATION.

5606 PARKSTON RD, Bethesda
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.Replace (2) 200 amp panels

10809 RIVERWOOD DR, Potomac
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.Install 60 amp EV charger circuit

12303 REMINGTON DR, Silver Spring
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.Wire 3-480v 60hp pumps

12401 PROSPERITY DR, Silver Spring
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.alterations to existing wiring

8601 LOCHAVEN DR, Gaithersburg
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.Wire new kitchen, and living room.

3001 FALLSTON AVE, Silver Spring
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.Install new 240V-60A and 30A circuit for new 15Kw Air Handler, as well as new 240V-40A circuit for new outdoor heat pump

19430 BEALLSVILLE RD, Beallsville
Oct 23

Please do not request inspections under this permit until 2 business days after permit issuance.Electrical installation of (1) Tesla EV charger.

4524 HORNBEAM DR, Rockville
Oct 23