Search Permits
246,803 results
one 57.8 SF face-lit LED channel-letter wall sign on south elevation.
NEW SWIMMING POOL AND SPA W/ LP TANK
Custom Single Family Home on Lot 9 Granite Mountain at Las Sendas as Recorded in book 884 of maps, page 41, Maricopa county, Arizona
Main Bathroom: Tub-to-shower conversion with a custom tile shower pan with curb, porcelain tile walls extending to the 10' ceiling, and a tiled bench. No drain relocation. Structural changes include a built-in tiled bench and two recessed shower niches.
Fabricate and Install 2) sets of LED illuminated pan Chanel letters with flat cut out secondary copy.
Installation of 13.50 kWh Battery
Installation of one new non-illuminated, double-faced freestanding directional monument sign (8'-6" H x 2'-4" W), including engineered foundation and supports. Additional scope includes address vinyl, entrance door graphics, painted architectural columns, accent graphics, and directional wall graphics on the west elevation of the existing partition wall between buildings, per submitted Scout sign plans (IDs 007–012). All proposed graphics are included for City review and determination of applica
Installation of 13.50 kWh Battery
Building an ADU to be attached to the existing house.
Building 5: 3-story, type V-B construction, 25,273 SF, group R-2 occupancy and 3,976 SF, group U occupancy. Special inspection required for fabricator, steel, concrete, masonry, wood, soil, post tension slab. Deferred fire alarms and access control. Results in CoO. Ref: PMT24-07220 for primary permit.
Please do not request inspections under this permit until 2 business days after permit issuance.Install 1 ceiling fan, 4 recess lights, 4 flood lights, and 2 outlets
Please do not request inspections under this permit until 2 business days after permit issuance.Install electric for a single-family dwelling and Disconnect and Reconnect main service. (200amps)
Please do not request inspections under this permit until 2 business days after permit issuance.Wire misc. speakers, cameras, access points, and TV locations.
Please do not request inspections under this permit until 2 business days after permit issuance.Electrical for new house with 400 Amps new service.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (31) ROOF MOUNTED SOLAR PANELS, (31) MICRO INVERTERS, ONE 70A LINE SIDE TAP, 13.640 KW
Revision - Heavy up 200 amp 40/80 Please do not request inspections under this permit until 2 business days after permit issuance.fuel switch NG water heater to heat pump water heater Run 30 amp circuit for water heater
Please do not request inspections under this permit until 2 business days after permit issuance.Electrical for new house with 400 Amps new service.
Please do not request inspections under this permit until 2 business days after permit issuance.installed car charger.
Please do not request inspections under this permit until 2 business days after permit issuance.PRIMARY WIRING OF NEW DWELLING
Please do not request inspections under this permit until 2 business days after permit issuance.Wire and install some recessed lights, fixtures, outlets, and switches on a kitchen and master bathroom renovation.
Please do not request inspections under this permit until 2 business days after permit issuance.fuel switch NG water heater to electric heat pump water heater fuel switch NG HVAC to heat pump Run (3) circuits in total 2 for the 20 KW heater kit and 1 for the water heater.
Please do not request inspections under this permit until 2 business days after permit issuance.fished 1 new dryer circuit
Please do not request inspections under this permit until 2 business days after permit issuance.
Please do not request inspections under this permit until 2 business days after permit issuance.Heavy Up Electrical service from 100 amps to 200 amps.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL MOMITORING MODULE TO MONITOR EMPLOYEE DOOR.
Please do not request inspections under this permit until 2 business days after permit issuance.Install a dedicated 60 amp circuit for EV Charger .
Please do not request inspections under this permit until 2 business days after permit issuance.1 New 240 volt circuit for new EVSE inside the garage, and one additional receptacle in garage taped to existing circuit.
Please do not request inspections under this permit until 2 business days after permit issuance.Remodel of kitchen.
Please do not request inspections under this permit until 2 business days after permit issuance.New power expander in elec rm. New notification devices will be connected to this. New addr. loop fault isolator to provide dedicated circut to tenant thatnew addressable devices will be connected to
Please do not request inspections under this permit until 2 business days after permit issuance.ADD LED LIGHTS , APPLIANCES, GENERAL OUTLETS AND SMOKES