Search Permits
246,803 results
Please do not request inspections under this permit until 2 business days after permit issuance.Install 50A circuit to power range and Install 240V / 30A circuit to power heat pump water heater
Please do not request inspections under this permit until 2 business days after permit issuance.Renovation of living space to include lighting and outlets. Rewire kitchen and appliances
Please do not request inspections under this permit until 2 business days after permit issuance.POOL BONDING ON NEW POOL DECK AND 6 POOL LIGHTS
Please do not request inspections under this permit until 2 business days after permit issuance.This is to connect a sign existing circuit Sign permit sign-1175723
Please do not request inspections under this permit until 2 business days after permit issuance.One fork lift charger circuit One 30-amp circuit for charger
Please do not request inspections under this permit until 2 business days after permit issuance.2 Forklift chargers
Please do not request inspections under this permit until 2 business days after permit issuance.Install (24) Roof Mounted Solar Panels. System Size 10.56 kW DC
Please do not request inspections under this permit until 2 business days after permit issuance.Install (13) Roof Mounted Solar Panels. System Size 5.72 kW DC
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (ONE) BACK-UP BATTERY, 15 KWH TO EXISTING SOLAR. ONE BACK-UP GATEWAY INSTALLED BETWEEN NEW 200 SERVICE DISCONNET AND MAIN SERVICE PANEL.
Please do not request inspections under this permit until 2 business days after permit issuance.Level 2 EV Charger in garage
Please do not request inspections under this permit until 2 business days after permit issuance.Kitchen and 1st Floor remodel including all rough-in and final electrical installations
Please do not request inspections under this permit until 2 business days after permit issuance.Replace existing main service panel. 200A service
Please do not request inspections under this permit until 2 business days after permit issuance.REMOVE AND REPLACE DEFECTIVE POWERWALL 2 WITH POWERWALL 3 AND EXPANSION UNIT. NO OTHER CHANGES OR UPGRADES TO OCCUR FROM ORIGINAL INSTALLATION.
Please do not request inspections under this permit until 2 business days after permit issuance.Install (1) Chargepoint EV Charger
New 23-lot residential subdivision. Meters: Landscape (1) 1-inch meter and service.
Group B occupancy. Type V-B construction. 8,548 SF. Occupant load 103. Existing suite and building. Demo existing partition walls and plumbing fixtures. Demo portion of exterior wall for a new entrance. New store front with door and 42 SF canopy over the new entrance. New partition walls and lighting. Remove existing mini-split air unit. New mechanical inline exhaust fat to the exterior of the building. New ceiling exhaust fan to exterior wall. New supply air ducting connecting to existing trunk
Bathroom remodel including new shower design. Install 60-inch x 34-inch low-profile shower pan. No structural changes. No drain relocation. Minimum required inspections: Plumbing underground (if required), plumbing rough in and plumbing final.
Install new 1" service line and 1-inch water meter on the northside of building, a new sewer service for APN13912046
Re-wiring all the electrical in existing residence. Also replacing the existing 200A service panel. Minimum required building inspections: Electric rough in and electric final.
Install of security door at 2nd level of an existing 43,805 SF type II-B construction, group I-2 occupancy bldg. Door install is at Alzheimer Wing. Deferred Access Control and Fire Alarm system. Results in CoC.
Install utilities and equipment for new Mesa sewer lift station. 208 SF Canopy. 2-inch domestic water meter service and 2-inch water meter. Electrical meter 200A 3 phase. Gas meter. Special inspections required: high strength bolting, steel construction, masonry construction, post-installed anchors, and concrete construction. Approved as noted. Results in CofC.
Development of 229,416 SF, Type II-B construction, groups B and S-1 occupancy single story data center. The development building is designed with tilt wall construction. The building will have supported chiller cooling platforms on south and north side of the buildings. Special Inspections Req - Emergency Responder Radio Coverage IFC 510. Special inspection required - Fire -Resistance Penetration and Joints, concrete, steel, masonry, anchors & bolts, soils, hi-pot testing. Deferred - stairs & pl
Expansion of 11' X 42' 462 sf rear patio with partition.
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
UNAUTHORIZED CONSTRUCTION. Carport to Garage, installation of a new 1-ton ductless mini-split heat pump system (indoor unit and outdoor condenser) with associated electrical circuit: replacement of existing water heater with a new 50-gallon natural gas unit on elevated platform. Related to COB26-00285.
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE SOLAREDGE BATTERY-10K. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK
Detached Garage Construction of a 1050 sq. ft. wood framed detached garage
Attached Metal Building with Electric
Install 16 ev charing stations using 19 existing parking stalls. Details of sow include: installing (1) pad mounted utility transformer: (1) 2500a, 277/480v mcb switchboard: (2) tesla pre-assembled supercharger unit with (1) 1200a v4 supercharger cabinet & (8) v4 supercharger posts: 4) light poles: (4) waste management bins
Install one new magnetic locking device on one existing commercial door. Existing fire alarm relay/interface to remain and be utilized for release of the magnetic lock upon fire alarm activation. No modifications to the existing fire alarm system are proposed. Work includes associated access control hardware and wiring.