Meridian Rd improvements Ph 3 Water, sewer, new pavement
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
1. REPLACE SERVICE CASES W/ SELF-SERVICE CASES. 2. REPLACE STAINLESS STEEL TABLES IN SEAFOOD & DELI. 3. REPLACE 2-COMP SINK IN SEAFOOD W/ 3-COMP. SUSHI PREP SINK 4. ADD SUSHI MAKELINE PREP TABLE 5. REPLACE HOT CASE & BASE IN DELI 6. PATCH RESINOUS FLOORING IN FRYER AREA
INSTALLATION OF 75-FT OF 1.5-IN PE GAS LINE BURIED 18-IN WITH 18 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & SW GAS REQUIREMENTS. SW GAS TO DETERMINE IF THE METER NEEDS TO BE UPGRADED.
1) Add 5th bedroom - framing, drywall, and electrical 2) Add 3rd bathroom - framing, electrical, plumbing All work is under the existing roof line – no exterior or footer work necessary
Removing existing 200 SF rear covered patio and adding a new 612 SF rear covered patio. Minimum required building inspections: Footing, strap/shear, framing and final.
Existing grey shell warehouse building. New partition walls to create spec office. New architectural and MEP. New electrical meter 200A 3phase. Deferred fire sprinklers. Results in CofC.
Existing grey shell warehouse building. New partition walls to create spec office. New architectural and MEP. Approved as Noted: All roof-mounted equipment shall be 100% screened per Mesa Zoning Ordinance Section §11-30-9. Deferred fire sprinklers. Results in CofC.
Group B and S-1 occupancies. Type V-B construction. 16,650 SF. Occupant load 77. Existing grey shell building. New partition walls to create spec office space in warehouse suite. New architectural and MEP. Deferred fire sprinklers. Results in CofO.
Group M occupancy. Type V-B construction. 2,290 SF. Occupant load 38. New CofO permit for an existing suite. No work to occur under this permit. Results in CofO.
New 2406 SF single story residence with a 2 car garage at AVALON CROSSING. Includes a new water, electric and gas meter. Includes an option of a tandem garage. See permit MST26-06635 for addenda - Code update 2024
PLUMBING PERMIT TO REPLACE EXISTING WET SPACE WITH NEW SHOWER IN MASTER BATHROOM. NEW VALVE AND PREFABRICATED ACRYLIC WALLS. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
CITY OF MESA ZONING CLEARANCE PERMIT ONLY FOR INSTALLATION OF 24-FT X 48-FT **** ABOVE-GROUND SET HERE COMES THE SUN MANUFACTURED HOME SERIAL NO. ********* WITH A/C. NO GAS. 200AMP PANEL UPGRADE. ONE 12-FT X 48-FT ATTACHED AWNING PER ICC ESR 1398. AWNING ENG PROVIDED BY CARL PUTNAM #39702. ACCESSORY STRUCTURE ROOF AREAS DO NOT EXCEED THE 100% MH FLOOR AREA. NO OTHER ACCESSORY STRUCTURES AT THIS TIME. MINIMUM TWO 9-FT X 18-FT PAVED UNOBSTRUCTED PARKING SPACES ARE REQUIRED BEHIND FRONT SETBACK ONE
Pallet Rack Installation. Pallet Rack Installation. HPCS plan.
Install one single faced illuminated multi-tenant monument sign. Ref CSP BOA25-00058. Results in CofC.
Install one single faced illuminated multi-tenant monument sign. Results in CofC.
Install one (1) set of illuminated pan channel letters with logo 33 sq ft on south elevation. LOGO SHIMA SUSHI
360 sq ft non-livable detached accessory structure to existing SFR. VB construction. No Electrical, plumbing or mechanical. Minimum required building inspections: Strap and shear, framing and final.
Install (1) 16.71 sq ft front lit channel letters G1 VAPES AZ.
Running electrical to shed from pre existing panel
dual-phased development that includes a retail component (Phase 1) and a multifamily component (Phase 2) and includes private roadways that run through the development
The prior permit PMT24-19645 was not properly amended to make the bedroom a storage. Therefore, I have to relabel the bedroom as a storeroom, as seen in the attached plans. No new construction will actually take place.
dual-phased development that includes a retail component (Phase 1) and a multifamily component (Phase 2) and includes private roadways that run through the development
THIS DOCUMENTATION IS FOR A TENANT IMPROVEMENT TO CONVERT TWO FORMER SUITES INTO A SINGLE SUITE FOR A SHOE STORE. THIS INCLUDES NEW FINISHES. THE RESTROOM HAS BEEN ALTERED IN THE PAST AND WILL BE RESTORED TO ADA COMPLIANCE. NO UTILITY UPGRADES ARE REQUIRED. SIGN IS BY SEPARATE PERMIT.
Installation of one set of reverse pan channel letters (top row) and front lit pan channel letters (bottom row) on brushed aluminum backer board. White, black, metallic, and turquoise faces, illuminated with white LEDs. Flush and stud-mounted to 3mm contour cut aluminum backer board and raceway which is mounted to the building and secured with anchors, screws, and bolts. 3" black trim cap, 3" black returns.
Replace the current freestanding sign with a new one.
Installation of a Fire Alarm System with ANSUL Hood, Fire Sprinkler & CO2 Monitoring.
Adding a 2 car carport to rear of house to comply with the As-Built permits they are applying for. Enclosed Garage and made livable
Adding a new sprinkler monitoring system with heat detectors in the attic.
As Built Plans converted the covered patio and a portion of the AZ. Room into a laundry room for the main house including bedroom and bathroom. As built plans for ADU converted the 2 car garage into a family room/ kitchenette. Took the existing storage /Laundry room and added a bathroom tot that area and took the remaining square footage from the Az Room and converted it to a bedroom. Attic access from the existing garage remain in place to support both areas.