Search Permits
18,764 results · type: electrical
New electric Sub-panel being installed inside the garage behind the existing main service panel. The subpanel will be a125A. All work to be done per the 2023 NEC, 2024 IRC, and Mesa amendments.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO S
PERMIT IS ONLY FOR THE INSTALLATION OF THREE TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE
Replace existing 200 Amp electrical panel with one-in-all panel and dig 4 x 4 x 4-foot pit for new 2.5-inch electrical riser for new panel. No new electrical loads associated with this permit.
detach and reset outlets 15 total and detach and reset 4 light fixtures
Repairs. Provide GFI protection for nongrounded receptacles. Install smoke and carbon detectors.
Replacing service with 200 amp main and two subpanels with 30 spaces each, Grounding all existing outlets, Running a new 200 amp wire feeder
Electrical service permit for Apt 614 at 4420 Dauphine St.
Electrical service permit for Apt 618 at 4420 Dauphine St.
Electrical service permit for Apt 601 at 4420 Dauphine St.
Repairs. Provide GFI protection for non-grounded receptacle locations. Install smoke and carbon detectors.
need power restored due to power being off for over 6 months
power has been off over 6 months, home needs ground rods installed, check all wiring and breakers
EV charger circuit and outlet
Electrical Service Fire Pump Permit
6 months Vacancy permit
vacancy for electrical
wiring of upstairs of building for office use
Interior electrical renovation of the M Club removing and replacing fixtures and receptacles. Install new receptacles and fixtures.
Remove 125amp faulty panel. Installed new 125amp outdoor 30 space panel with main breaker. Attempt to install 15 new arc fault breakers. If arc-fault breakers do not hold with existing wiring, HD will installed regular breakers. Install surge protector. Install new ground system with ground bridge and two ground rods. Meter and riser were not changed out.
Replace service panel
Installation of a whole home generator with a 200 amp transfer switch
Electrical wiring of new bar
Installation of a 30 KW Kohler generator and automatic transfer switch.
electrical
electrical
electrical
electrical
electrical