Search Permits
20,271 results · type: plumbing
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [3bed 2.5bath] with Attached Carport. Bldg 1
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [3bed 3.5bath]. Bldg 2
Unit 1B: New construction three-unit use duplex residential: Unit 1B: 3 bedroom 3 bath.
Tunnel under the foundation to repair a 15-ft PVC drain line with SCH 40 PVC. There will be two access holds in front and the side of the house.
*Addressing active code violation: Addition/Remodel - Remodel and re-build existing sq.ft. of existing 1-story single-family residential due to damage. IR of same space to create study family room laundry room half bath and primary bedroom/ full bath; new covered front porch; new covered rear patio.
Unit 1A: New construction three-unit use duplex residential: Unit 1A: 2-story 3 bedroom 3 bath.
Alterations
Alterations
Replacement of an existing water heater Kristine Wiseman: replacement of a 40-gallon gas water heater
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
FULL HOME UNDER SLAB DRAIN REPIPE **** DIG CREW***** SEE CONTRACT AND DIAGRAM******** 38 tunnel 1 access point 2 clean outs Replace all cast iron verticals in upstairs bathrooms.
Addition and remodel Remodel kitchen master bed/bath add 2nd floor over existing garage add loft over new 2nd floor
8 foot tunnel 2 foot sewer line repair
New Construction or Additions
Alterations
Alterations
Replacement of an existing water heater Replace 40-gallon gas water heater Located in garage ARBOR VILLAGE CONDO BUILDING E UNIT 504
Addition and Remodel: Remodel existing kitchen; demo portion of right exterior wall and brick and demo front exterior wall and brick; replace existing roof (match shingles); demo existing patio (posts & beam); add one new bedroom and office; add full bath and powder; and add new porch; add new windows and doors with addition.
ETJ - Installing a new irrigaiton system
Install Sprinkler System. ETJ
irrigation for lawn
ePlan: Commercial Expedited Review - [PUBLIC PROJECT] Addition and Remodel to Austin High School. Phase 3. (396761 SF).
irrigation for lawn
irrigation for lawn
Express: Guest bathroom remodel (keep tub/shower in existing position keep vanity and toilet in existing position) Not relocating fixtures
interior remodel/garage conversion - enclosing the back porch area and adding the space to the existing laundry room. Dining room back door will be relocated from the south to the west side of the house