Search Permits
18,764 results · type: electrical
New pool & spa for single family residence in the same footprint of prior demolished pool. With plumbing permit
ePlan: Residential Expedited Review - New Autofill/Heated pool w/Spa. Unit A
New Construction in the ETJ SFR
Covered patio addition to two-story SFR
New construction in-ground pool and spa.
Install Level 2 EV Charger
ePlan: Commercial Expedited Review - Interior Remodel -Sec 6 Floors 3-4 (37300 SF).
7 DAY - FINISH OUT ADMIN OFFICE - OVA
Carport enclosure
Provide temporary power pole for the duration of the project. Ref: 2026-045763-BP
(Hayden Mario) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
New construction secondary apartment 1-story with basement 1 bedroom 1 bath with uncovered patio.
Temp power for jobsite trailer reference 2026-014441 BP 120/240 Volt 400 Amp Overhead Service Project for Turning one Viewing Platform
Rack permit
ePlan: Residential Expedited Review - Change of Use to THREE UNIT RES. *Partial Demo* Addition and Remodel to Existing Single Family Res. Work to include: Demolition to existing slab Rebuild Duplex on existing slab. Bldg 1B New construction of a 3-Story Duplex [2bed 2.5bath]
tpole ref 2026-058924 BP
temporary power construction ref; 2025 142051BP
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 3.5bath] with Attached Carport. Bldg 6
INTERIOR REMODEL TO FIRE & WATER DAMAGED APARTMENT: replace GWB replace insulation where necessary replace MEP appliances & fixtures in-kind (18 apps)
tpole permit ref 2026-058103 BP
Upgrading Main Service From a 100amp main breaker panel to a 200amp main breaker panel adding 60amp 2 pole EV Charger to main service panel
Addition/ remodel: Converting a portion of existing carport into laundry room; remodel of existing living kitchen and bathrooms.
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [4bed 3.5bath] with Attached Garage. Bldg 4
Interior remodel only. Some sprinklers to be relocated.
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [4bed 3.5bath] with Attached Carport. Bldg 5
Temporary meter loop for construction power only. Service will be used during construction (less than 24 months) and will be removed once permanent electrical service is installed and approved. Temporary service is not intended to serve any occupied structure. 2025-095914 BP
New construction of SFR with covered 2/2
New inground swimming pool w/ reqd enclosure device for existing 2-story single family residence.
Pre-wire for solar.
ePlan: Commercial Expedited Review - New Construction of Exterior Equipment Yard (117 450 SF).