Search Permits
20,271 results · type: plumbing
1522 SF First tenant Generation Finish Out for a convenience store NO KITCHEN
Making connection to existing wastewater line & installing pipe from connection to 5 outside proposed building
New Irrigation installation ref 2024-160847 BP ref 2025-075230 W
Replacement of an existing water heater
Express: bathroom tile replaced in both bathrooms exchanged fixtures like for like replace 3 windows sizes to remain same. add smoke detectors install new sewer clean out in front of of house new smoke detectors throughout home new decorative lights fixtures remove popcorn ceiling and retexture
outdoor kitchen gas line
7 DAY - Existing ceiling panels will be removed. exposed ductwork will be installed in conditioned space. new lighting will be installed. volume of space will increase - OVA
Install Irrigation System ETJ
12ft and 7ft tunnels to repair broken drains under foundation
Install Irrigation System ETJ
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 3.5bath] with Attached Carport
HB2334- Install outside water and wastewater lines up to 5 ft from building only. reference 2024-163867 BP
Addition/remodel. Addition of a primary bedroom bathroom closet den office covered porch enlarged bedroom enlarged garage and half bathroom to rear and side of existing noncomplying 1-story single family residence. Comprehensive interior remodel. Reconfigure interior layout resulting in a 4 bedroom 3.5 bathroom single family residence.
Express- Non-structural remodel of existing master bathroom. Scope includes removal and replacement of existing finishes and plumbing fixtures. Work includes converting an existing standing tub to a walk-in shower replacing existing vanity and toilet installation of vanity utilizing existing plumbing connections and removal and replacement of floor and wall tile throughout the bathroom and shower area. Minor electrical updates for vanity lighting and bathroom electrical components may be include
SMART HOUSING - A new construction SMART Housing building project with 60 residential dwelling units (Bldg. 1.3)
Water Heater Replacement
ePlan: Commercial Expedited Review - [Public Project] Addition to Existing High School. Work to include New Competition Gym and Locker Rooms (44629 SF).
tunnel work to repair sewer
Excavate 22 tunnel to repair main drain line under the house
7 DAY - INTERIORE REMODEL OF EXISTING OFFICE SPACE. MOTHERS ROOM AND BOARDROOM. - OVA
Excavate 15 tunnel to repair main drain line under the house.
New In-ground 300 SF Concrete Pool and associated equipment and pad.
New pool with required enclosure (heater or autofill)
Express: Replace 120 sqft of roof decking & Replace shingles. Replace Sewer lines under pier and beam home
**SEWER REPLACEMENT- OUTSIDE OF BLDG TO CITY CONNECTION** AUSTIN II
SMART HOUSING -A new construction SMART Housing building project comprising 10 residential dwelling units and accompanying amenity spaces such as community rooms computer lounge and a fitness center. (Bldg. 1.2)
Plumbing
Plumbing
Plumbing
Plumbing