Search Permits
247,466 results
New 2 Story 3-bed 2.5 bath Single Family house with Detached Garage in rear with alley access SMART Housing
Gas line repair to fireplace
Installing a cleanout on sewer line where it exits the lease space
INTERIOR REMODEL-LAB SPACE AND 1 NEW INTERIOR DOOR
Express - Install one 71 71 Impervia 2-wide fixed sash window set within existing opening; no structural change.
SINGLE FAMILY RESIDENTIAL NEW HOME CONSTRUCTION. 2-STORY 4 BEDROOM WITH 2.5 BATHROOMS WITH 2 CAR GARAGE AND COVERED PATIO.
Replacement of complete existing central heat and air system with or without duct work
*SMART HOUSING* *GREEN BUILDING* ePlan: Residential Expedited Review - New construction of a 2-Story Small Lot Single Family Res. [3bed 2.5bath] with Attached Carport.
ePlan: Commercial Expedited Review - Interior Remodel and Change of Use From Office to Event Space Scope of Work to Include interior Remodel (5645 SF).
Replacement of complete existing central heat and air system with or without duct work
New constuction of a 2-story single family dwelling in a condo regime. 3 Bedrooms 2.5 bathrooms with attached 2 car garage
ePlan: Residential Expedited Review - New Construction of 2-Story Duplex: Unit A [4bed 3bath]
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Tpole 2026-087329 BP
Interior remodel to existing office suite with minor MEP scope. No access control or change of use.
(Jones Ashley) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
Replacement of complete existing central heat and air system with or without duct work Like for like change out of 3 ton 17.2 seer2 two stage furnace horizontal application
ePlan: Commercial Expedited Review - New Construction of Sports Facility Utility Building.
Replacement of complete existing central heat and air system with or without duct work
ETJ New Construction
New construction of a 2-story single family dwelling in a condo regime. Both units are part of the duplex. Both units have 3 bedroom 2.5 bath with 2 car garage. NOTE: Rebate due to the customer of $246.33 for clerical error. Adjustment fee canceled by John Bowmen.
ePlan Review: Remodel Labs and Break Area - 3rd Floor for Building 2
Remove and replace existing tea and fountain equipment and chiller. Existing CO2 to remain. There are no modifications to exterior walls parking sidewalks or landscape.
New pool/spa with concrete deck (with plumbing permit)
Annual Gas Test
Express: Drywall replacement electrical replacement insulation & painting. 200 sq.ft. total
Express- Installing 9 Steel piers and 2 exterior breakouts
irrigation for lawn
Replacement of complete existing central heat and air system with or without duct work