Search Permits
245,623 results
INSTALLATION OF A SPRINKLER SYSTEM AT GARAGE CLOTHING STORE LOCATED ON THE 2ND FLOOR AT QCM, AS PER PLANS SUBMITTED HEREWITH NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP.
CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. FENCE TO BE INSTALLED ON ROADWAY. DOT PERMITS BY OTHERS.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Suspended Scaffold for Facade Restoration as Shown on Plans
Installation of temporary storage of material on top of existing sidewalk shed (Filed under M01396143-I1-SH) per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG DEMOLITION, FILED SEPARATELY. RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
INSTALLATION OF THE TEMPORARY FENCE AT 630 KINGSBOROUGH 6TH WALK, BROOKLYN, NY 11233 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF THE TEMPORARY FENCE AT 408 KINGSBOROUGH 4TH WALK, BROOKLYN, NY 11233 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS.
PROPOSED INTERIOR RENOVATION OF EXIST. 2 STORY FRAME BUILDING. GENERAL CONSTRUCTION WORK AT CEL, 01, AND 02 FLOOR; REMOVE & INSTALL WINDOWS, PARTITIONS, AND HARDWOOD FLOOR. NO CHANGE IN USE, EGRESS, OCCUPANCY.
CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF OUTRIGGER FOR FACADE REPAIR.
INSTALLATION OF NEW PLUMBING AND GAS FIXTURES FOR A NEW ONE-FAMILY DWELLING.
GC/ST WORK TYPES TO REPAIR EX. 2-FAMILY DWELLING FROM FIRE DAMAGES & TO RESOLVE RCA (COMPLAINT #3A70370) INCLUDING JOISTS, LOT LINE WALL, PARTITIONS, ROOF & COSMETIC FINISHES PER PLANS SUBMITTED HEREWITH. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
GENERAL RENOVATION OF 1-FAMILY HOUSE WITH REPAIR/REMOVE/NEW PARTITION, DOOR, CEILING, FLOOR, WINDOW, STAIR, FRONT PORCH PAINTING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
bathroom reconfiguration, add clothing washer
PROPOSED INTERIOR RENOVATION OF EXISTING FLOOR. PLUMBINGWORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY
One time Temporary Seasonal use of house and exterior structure between the dates of 9/25/2026 and 11/02/2026.
Install of temp inflatable screen, no alt to exist structures for annual Central Park Film Festival. A TPA is not required. Producer is responsible to monitor site safety. All production equipment removed upon event completion.
Proposed water, sanitary sewer, and storm in OSP, GF and 1st FL to connect the new modular residence to city lines. The modular residence is under NYS Jurisdiction (see GC approved plans).
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
HEREWITH TO FILE INTERIOR MECHANICAL ALTERATIONS INCLUDING REMOVAL AND INSTALLATION OF HVAC COMPONENTS DUCT WORK, VAV BOXES AND ASSOCIATED AIR DISTRIBUTION. NO CHANGES IN OCCUPANCY USE, GROUP OR EGREESS UNDER THIS APPLICATION.
Proposed water, sanitary sewer, and storm in OSP, GF and 1st FL to connect the new modular residence to city lines. The modular residence is under NYS Jurisdiction (see GC approved plans).
Suspended Scaffolding for Facade Restoration as Shown on Plans
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.