PermitDig

Search Permits

245,623 results

INSTALLATION OF A SPRINKLER SYSTEM AT GARAGE CLOTHING STORE LOCATED ON THE 2ND FLOOR AT QCM, AS PER PLANS SUBMITTED HEREWITH NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP.

90-15 QUEENS BOULEVARD, Queens
86KSep 28

CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. FENCE TO BE INSTALLED ON ROADWAY. DOT PERMITS BY OTHERS.

50 MOLLENHAUER DRIVE, Brooklyn
1KSep 28

INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

15 EAST 77 STREET, Manhattan
1KSep 28

Suspended Scaffold for Facade Restoration as Shown on Plans

40 LINCOLN CENTER PLAZA, Manhattan
Sep 28

Installation of temporary storage of material on top of existing sidewalk shed (Filed under M01396143-I1-SH) per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

343 MADISON AVENUE, Manhattan
3KSep 28

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

99 ST MARKS PLACE, Manhattan
5KSep 28

TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG DEMOLITION, FILED SEPARATELY. RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP

11 EAST 44 STREET, Manhattan
2KSep 28

Installation of solar system on the roof as per plan. No change in use, egress or occupancy

92-14 88 AVENUE, Queens
63KSep 28

INSTALLATION OF THE TEMPORARY FENCE AT 630 KINGSBOROUGH 6TH WALK, BROOKLYN, NY 11233 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.

630 KINGSBOROUGH 6 WALK, Brooklyn
10KSep 28

INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

229 SHEPHERD AVENUE, Brooklyn
10KSep 28

INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

86 2 STREET, Brooklyn
10KSep 28

INSTALLATION OF THE TEMPORARY FENCE AT 408 KINGSBOROUGH 4TH WALK, BROOKLYN, NY 11233 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.

408 KINGSBOROUGH 4 WALK, Brooklyn
10KSep 28

Installation of solar system on the roof as per plan. No change in use, egress or occupancy

122-20 26 AVENUE, Queens
35KSep 28

INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS.

630 BAKER AVENUE, Bronx
5KSep 28

PROPOSED INTERIOR RENOVATION OF EXIST. 2 STORY FRAME BUILDING. GENERAL CONSTRUCTION WORK AT CEL, 01, AND 02 FLOOR; REMOVE & INSTALL WINDOWS, PARTITIONS, AND HARDWOOD FLOOR. NO CHANGE IN USE, EGRESS, OCCUPANCY.

37-33 100 STREET, Queens
410KSep 28

CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

2175 RYER AVENUE, Bronx
8KSep 28

INSTALLATION OF OUTRIGGER FOR FACADE REPAIR.

643 WALES AVENUE, Bronx
Sep 28

INSTALLATION OF NEW PLUMBING AND GAS FIXTURES FOR A NEW ONE-FAMILY DWELLING.

106 GRAVES STREET, Staten Island
Sep 28

GC/ST WORK TYPES TO REPAIR EX. 2-FAMILY DWELLING FROM FIRE DAMAGES & TO RESOLVE RCA (COMPLAINT #3A70370) INCLUDING JOISTS, LOT LINE WALL, PARTITIONS, ROOF & COSMETIC FINISHES PER PLANS SUBMITTED HEREWITH. NO CHANGE TO EGRESS, USE OR OCCUPANCY.

897 METROPOLITAN AVENUE, Brooklyn
123KSep 28

GENERAL RENOVATION OF 1-FAMILY HOUSE WITH REPAIR/REMOVE/NEW PARTITION, DOOR, CEILING, FLOOR, WINDOW, STAIR, FRONT PORCH PAINTING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

2230 78 STREET, Brooklyn
80KSep 28

bathroom reconfiguration, add clothing washer

44 EAST 67 STREET, Manhattan
10KSep 28

PROPOSED INTERIOR RENOVATION OF EXISTING FLOOR. PLUMBINGWORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY

1355 SHORE PARKWAY, Brooklyn
60KSep 28

One time Temporary Seasonal use of house and exterior structure between the dates of 9/25/2026 and 11/02/2026.

211-17 HOLLIS AVENUE, Queens
15KSep 28

Install of temp inflatable screen, no alt to exist structures for annual Central Park Film Festival. A TPA is not required. Producer is responsible to monitor site safety. All production equipment removed upon event completion.

65-02 CENTRAL PARK, Manhattan
5KSep 28

Proposed water, sanitary sewer, and storm in OSP, GF and 1st FL to connect the new modular residence to city lines. The modular residence is under NYS Jurisdiction (see GC approved plans).

398 HAMDEN AVENUE, Staten Island
Sep 28

ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

129 NORTH 6 STREET, Brooklyn
1KSep 28

HEREWITH TO FILE INTERIOR MECHANICAL ALTERATIONS INCLUDING REMOVAL AND INSTALLATION OF HVAC COMPONENTS DUCT WORK, VAV BOXES AND ASSOCIATED AIR DISTRIBUTION. NO CHANGES IN OCCUPANCY USE, GROUP OR EGREESS UNDER THIS APPLICATION.

730 3 AVENUE, Manhattan
132KSep 28

Proposed water, sanitary sewer, and storm in OSP, GF and 1st FL to connect the new modular residence to city lines. The modular residence is under NYS Jurisdiction (see GC approved plans).

176 KISWICK STREET, Staten Island
Sep 28

Suspended Scaffolding for Facade Restoration as Shown on Plans

125 BROAD STREET, Manhattan
Sep 28

FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.

812 PARK AVENUE, Manhattan
Sep 28