PermitDig

Search Permits

245,623 results

CONSTRUCT A 370-SF SWIMMING POOL WITH ELECTRIC HEAT PUMP. NO SPA. NO GAS. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER - ALAN E. MONEY NO. 30895, EXPIRES 12-31-26. REF MST26-01206. ENGINEERING AND STRUCTURAL CALCULATIONS ARE REQUIRED TO BE ONSITE FOR ALL INSPECTIONS AND OPTIONS HIGHLIGHTED. THESE PLANS MUST CONFORM TO THE REQUIREMENTS OF THE 2024 INTERNATIONAL SWIMMING POOL AND SPA CODE WI

9641 E RAINBOW AVE, Mesa
Sep 28

Construction activities are not restricted in general, but outside noise attributed to construction is limited to the following hours: Regular Hours (October 16 – April 30) · Monday–Friday: 6:00 a.m. to 8:00 p.m. (5:00 a.m. for concrete pouring) Summer Hours (May 1 – October 15) · Monday–Friday: 5:00 a.m. to 7:00 p.m. (4:00 a.m. for concrete pouring) · Saturday: 7:00 a.m. to 7:00 p.m. Work that generates noise outside of these hours requires approval and an after-hours permit. After-hours

311 W MAIN ST, Mesa
Sep 28

APN 218-26-077W CITY SERVICE OUTSIDE CITY LIMITS (WATER) 189 N 81ST, MESA, 85207

Unknown, Mesa
Sep 28

APN 21826077W CITY SERVICE OUTSIDE CITY LIMITS (WATER) 197 N 81ST ST, MESA, 85207.

Unknown, Mesa
Sep 28

Remove and replace 200AMP panel.

7403 E IVYGLEN ST, Mesa
Sep 28

5 story building for Cubs baseball team, and 4 story candlewood hotel

2630 W RIO SALADO PKWY, Mesa
Sep 28

APN 21826077X CITY SERVICE OUTSIDE CITY LIMITS (WATER) 4183 N 81ST ST, MESA, 85207.

Unknown, Mesa
Sep 28

Like for like replacement of domestic hot side lines only. No relocation. No new fixtures

3565 N CRYSTAL PEAK CIR, Mesa
Sep 28

The proposed project is the development of a 5-acre area (Parcel 62 located in the northwest quadrant of the airport), known as the Mesa Hangars/Davcon Aviation project. The development will include the construction of aircraft hangars that may include office and aircraft space. Specifically, the project will include roughly 50,000 square feet of aircraft hangar space, as well as approximately 20,000 square feet of office/administration space for the aviation businesses which rent the hangars, a

2655 N GREENFIELD RD, Mesa
Sep 28

Building 11: 3-story, type V-B construction, 25,273 SF, group R-2 occupancy and 3,976 SF, group U occupancy. Special inspection required for fabricator, steel, concrete, masonry, wood, soil, post tension slab. Deferred fire alarms and access control. Results in CoO. Ref: PMT24-07220 for primary permit.

7961 E ELLIOT RD, Mesa
Sep 28

Please do not request inspections under this permit until 2 business days after permit issuance.Dedicated 50A 240V circuit from main panel to garage for Nema 14-50R

19205 TATTERSHALL DR, Germantown
Sep 28

Please do not request inspections under this permit until 2 business days after permit issuance.Install fifty (50) lights, twenty (20) switches, thirty (30) fixtures, and four (4) bathrooms. Exhaust fans, and one (1) ceiling fan for a partial house remodel.

10006 SINNOTT DR, Bethesda
Sep 28

Please do not request inspections under this permit until 2 business days after permit issuance.Replacing qty 1 subpanel in garage, adding safety disconnect near meter. Adding ground rods and applicable grounding wire to service, panel schedule and new breakers ...

11018 ROCK RUN DR, Potomac
Sep 28

Please do not request inspections under this permit until 2 business days after permit issuance.install new 100 amp electrical panel

9080 BRADGROVE DR, Bethesda
Sep 28

Please do not request inspections under this permit until 2 business days after permit issuance.Installation of 16 Hyundai 440-watt AC panels (7.04 kW) with integrated micro-inverters on residential rooftop

7737 EPSILON DR, Rockville
Sep 28

Please do not request inspections under this permit until 2 business days after permit issuance.pull and replace lights,switches,outlets relocate wiring for 2 lights install led recess lights etc...

14600 DRUM HILL CT, Gaithersburg
Sep 28

Please do not request inspections under this permit until 2 business days after permit issuance.Kitchen lighting and outlets

4121 BARNSLEY LN, Olney
Sep 28

Please do not request inspections under this permit until 2 business days after permit issuance.Replace gas water heater with an electric 50 gallon Navien heat pump water heater includes a whole house Surge Protector

617 GIST AVE, Silver Spring
Sep 28

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (26) ROOF MOUNTED SOLAR PANELS, (26) MICRO INVERTERS, ONE 60A LINE SIDE TAP, 11.440 KW

20621 BEAVER RIDGE RD, Montgomery Village
Sep 28

Please do not request inspections under this permit until 2 business days after permit issuance.Adding notification and initiating devices to the existing fa system.

8605 CAMERON ST, Silver Spring
Sep 28

Please do not request inspections under this permit until 2 business days after permit issuance.REPLACE DAMAGED 200A LOAD SIDE SERVICE TAIL WITH NEW 200A LOAD SIDE SERVICE TAIL.

2400 PARALLEL LN, Silver Spring
Sep 28

Please do not request inspections under this permit until 2 business days after permit issuance.Provide one dedicated 120/240v circuit 30 amp for a residential lift motor which includes 2 recess fixtures at each lift vestibule, 1 GFCI outlet, one telephone line.

3805 LELAND ST, Chevy Chase
Sep 28

Please do not request inspections under this permit until 2 business days after permit issuance.

7501 WISCONSIN AVE, Bethesda
Sep 28

Please do not request inspections under this permit until 2 business days after permit issuance.New ckt 240 volts for new EVSE inside the garage.

6533 79TH PL, Cabin John
Sep 28

Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (40) ROOF MOUNTED SOLAR PANELS, (40) MICRO INVERTERS, ONE 80A FUSED LINE SIDE TAP, 17.200 KW

2400 PARALLEL LN, Silver Spring
Sep 28

Please do not request inspections under this permit until 2 business days after permit issuance.Replace defective solar inverter

13161 CABINWOOD DR, Silver Spring
Sep 28

Please do not request inspections under this permit until 2 business days after permit issuance.

7501 WISCONSIN AVE, Bethesda
Sep 28

Please do not request inspections under this permit until 2 business days after permit issuance.#1 new electric dryer #1 new electric range #1 new subpanel

12420 VEIRS MILL RD, Silver Spring
Sep 28

Please do not request inspections under this permit until 2 business days after permit issuance.Install new 60A circuit for a hardwired EV charger.

804 GUILFORD ST, Silver Spring
Sep 28

Please do not request inspections under this permit until 2 business days after permit issuance.INTERIOR WORK , CONVERTING BEDROOM INTO BATHROOM ON THE SECOND FLOOR

7903 WOODBURY DR, Silver Spring
Sep 28