Search Permits
247,466 results
renovation_(structural_or_non-structural)
electrical_service_/_circuit_/_feeder
Homebuilders loop for New SFR ref 2025-149862 BP. Austin LTD -Bluebonnet
Homebuilders loop for New SFR ref 2025-146573 BP. Austin LTD -Bluebonnet
Installation of 9.68KW Solar PV system.
New In ground pool w/ autofill or heat system
SMALL PROJECT - Remodel existing retail space into new retail space.
BASE: Installing a backup battery system and additional meter socket.
New pool and spa
Total demo of sfr 986 sqft circa 1953
Replacement of complete existing central heat and air system with or without duct work
Refrigerated display case upgrade and remodel within the store at various department
Tenant interior renovation of an existing Dialysis clinic. Work includes updating finishes plumbing mechanical electrical and the addition of a wall to the reception area
New Detached Garage
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res.
Replacement of complete existing central heat and air system with or without duct work
New construction of restaurant shell (NOT FOR OCCUPANCY)
Interior remodel to existing admin areas
Replacement of complete existing central heat and air system with or without duct work replacement of an hvac system
Replacement of complete existing central heat and air system with or without duct work hvac change out
new water service line up to 30 feet from meter to home and water heater change out 11529 Alberta Drive Austin TX 78739
Replacement of complete existing central heat and air system with or without duct work
Remove and replace existing tea and fountain equipment and chiller. Existing CO2 to remain. There are no modifications to exterior walls parking sidewalks or landscape.
Express- Replace roof with same style and color shingles
Change of use to Food Sales and interior remodel.
New construction of in ground pool and spa with concrete decking and equipment pad
Replacement of complete existing central heat and air system with or without duct work
ePlan: Commercial Expedited Review - New Construction of Sports Facility Dumpster Enclosure.
BASE: Installing a backup battery system and additional meter socket.
Install Level 2 EV Charger