PermitDig

Search Permits

245,623 results

INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

110 WEST 32 STREET, Manhattan
9KSep 29

INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

110 WEST 32 STREET, Manhattan
9KSep 29

INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLAN AND IN ACCORDANCE WITH CHAPTER 33 OF NYC 2022 BUILDING CODE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.

101-16 77 STREET, Queens
10KSep 29

temporary construction fence

108 CRAFTON AVENUE, Staten Island
8KSep 29

INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING GENERAL CONSTRUCTION WORK. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.

27 CANAL STREET, Manhattan
5KSep 29

INSTALLATION OF TEMPORARY CONSTRUCTION CHAIN LINK FENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

320 MORRIS AVENUE, Bronx
40KSep 29

Installation of temporary overhead protection at courtyard per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

820 5 AVENUE, Manhattan
10KSep 29

INSTALLATION OF TEMPORARY SIDEWALK SHED AT 442 KINGSBOROUGH 4TH WALK, BROOKLYN, NY 11233 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.

442 KINGSBOROUGH 4 WALK, Brooklyn
10KSep 29

PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR EXISTING BUILDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

880 QUINCY STREET, Brooklyn
5KSep 29

FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES ANDMETHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola

154 EAST 29 STREET, Manhattan
Sep 29

INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

274 SAINT JOHNS PLACE, Brooklyn
9KSep 29

FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola

360 PARK AVENUE SOUTH, Manhattan
Sep 29

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.

159-19 HORACE HARDING EXPRESSWAY, Queens
1KSep 29

INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

320 2 AVENUE, Manhattan
10KSep 29

INSTALLATION OF CONSTRUCTION FENCE AND HEAVY DUTY SIDEWALK SHED AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

141 WILLOUGHBY STREET, Brooklyn
45KSep 29

INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGES IN USE, EGRESS OR OCCUPANCY IN THIS APPLICATION.

64 NORTH MOORE STREET, Manhattan
5KSep 29

FACADE RESTORATION, INSPECTIONS

35 EAST 84 STREET, Manhattan
Sep 29

HVAC MODIFICATIONS ON THE 22nd AND 23rd FLOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

1251 AVENUE OF THE AMERICAS, Manhattan
180KSep 29

INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

274 SAINT JOHNS PLACE, Brooklyn
9KSep 29

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

45 HICKS STREET, Brooklyn
5KSep 29

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

601 WEST END AVENUE, Manhattan
1KSep 29

FACADE RESTORATION, INSPECTIONS

55 WEST 11 STREET, Manhattan
Sep 29

Installation of ductworks, duct insulations, and air supply outlets only as shown herewith on drawings. No change to use, egress, or occupancy.

584 BROADWAY, Manhattan
125KSep 29

TEMPORARY SUPPORTED SCAFFOLD AS PER DRAWINGS. SUPPORTED SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

325 PARK AVENUE, Manhattan
2KSep 29

INSTALLATION OF TEMPORARY SIDEWALK SHED AT 408 KINGSBOROUGH 4TH WALK, BROOKLYN, NY 11233 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.

408 KINGSBOROUGH 4 WALK, Brooklyn
10KSep 29

SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION AND INSPECTION WORK AT 370 EAST 150 STREET, BRONX, NY 10455

370 EAST 150 STREET, Bronx
Sep 29

INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

35-16 126 STREET, Queens
300KSep 29

Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

366 MADISON AVENUE, Manhattan
3KSep 29

IRA FOR THE VERTICAL CABLE TRAY LOCATION INSPECTION

70 PALADINO AVENUE, Manhattan
Sep 29

ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

1501 BROADWAY, Manhattan
4KSep 29