Search Permits
245,623 results
Interior modifications to the existing plumbing system, including removals of fixtures, on the 22nd Floor, as per plans. No change to use, egress, or occupancy.
INTERIOR RENOVATION OF EXISTING GYM ON THE FIRST, SECOND, AND THIRD FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEING APPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.
OFFICE RENOVATION WORK TO INCLUDE PARTITIONS, DOOR, CEILLING,MILLWORK, FINISHES MODICATIONS TO FLOORS 1, MEZ, 2, 3 & 4 AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PROPOSED INTERIOR RENOVATION AND NEW STOREFRONT FOR A STORE AT BASEMENT AS PER PLAN. NO CHANGE OF EGRESS, USE AND OCCUPANCY UNDER THIS APPLICAITON.
Demo of existing partitions, fixtures, finishes, slab openings, and related structural/MEP infrastructure. New non-structural partitions, ceilings, fixtures, finishes, elevators, ...
HEREWITH FILE FOR INTERIOR RENOVATION FOR EXIST. COMMERCIAL STORE . WORK INCLUDES NON-LOAD BEARING PARTITION WALL, NEW PAINT THROUGHOUT SPACE, NEW CARPENTRY MILLWORK, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
HEREWITH FILE FOR INTERIOR RENOVATION FOR EXIST. COMMERCIAL STORE . WORK INCLUDES NON-LOAD BEARING PARTITION WALL, NEW PAINT THROUGHOUT SPACE, NEW CARPENTRY MILLWORK, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
INTERIOR RENOVATION TO EXISTING DWELLING UNIT 6JK. PARTITION FINISH AND FIXTURE WORK. RENOVATE EXISTING KITCHEN AND BATHROOMS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Interior Renovation of existing Apartment 65A (55th Floor) as per plans. Work to include interior demo, installation of new partition work & new flooring & ceilings thru-out, bathrm renov, No change to use, egress or occupancy under this applic.
Interior demolition for Red Note space on 3rd floor
MINOR INTERIOR RENOVATION TO THE FIRST FLOOR COMMERCIAL SPACE, INCLUDING THE RELOCATION OF EXISTING MECHANICAL HOOD AND DUCTS AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALL SIX (6), OF 16-TOTAL, REPLACEMENT GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALL NEW EXTERNAL CHIMNEY AS PER PLANS. ABANDON EXISTING MASONRY CHIMNEY IN PLACE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALL TEN (10), OF 16-TOTAL, REPLACEMENT GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INTERIOR RENOVATION OF EXISTING RETAIL STORE TO CONVERT TO AN EATING AND DRINKING ESTABLISHMENT.
Plumbing work filed for unit 1AL. Installation of new and relocated bathroom fixtures and all associated piping. There are no change in use, egress or occupancy under this application
Filing herewith for general construction as per plans submitted. No change in occupancy use or egress.
FACADE RENOVATION AND REPAIR AS PER PLANS FILED HEREWITH TO CORRECT OATH/ECB VIOLATION # 39145227P.
Modification to existing plumbing systems. No change in use, egress or occupancy
DIRECT REPLACEMENT OF TWO (2) ROOFTOP UNITS
SPRINKLER WORK AS SHOWN ON PLANS
PLANS AND DOCUMENTS FILED HEREWITH FOR ALTERATION OF A DETACHED ONE-FAMILY RESIDENCE AND ADDITION OF AN ACCESSORY ANCILLARY DWELLING UNIT (ADU) PER BC U201 LOCATED AT 1ST FLOOR AND 2ND FLOOR. MAIN FRONT ENTRANCE OF ADU DIRECTLY OPEN TO STREET FRONTAGE.
PARTIAL PARAPET RESTORATION AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
MECHANICAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF APARTMENT 8A/B ON THE 8TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Interior renovation of an existing commercial space to establish a new deli. Work includes new non-load-bearing partitions, ceilings, finishes, counters, food-preparation equipment, plumbing fixtures, lighting, electrical systems, FA & mechanical system.
Interior renovation of apt 2D. Install new powder room and laundry room. No change in use, egress and occupancy
Decommission of existing VERIZON site on the roof. No change in use, egress or occupancy.
MODIFY EXISTING FRONT ENTRANCE STAIRS, COLUMN & CANOPY AT FRONT YARD. INTERIOR RENOVATION AT 1ST FLOOR & 2ND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
GENERAL CONSTRUCTION SCOPE OF WORK: KITCHEN & BATHROOM RENOVATION. MINORPARTITION AND CABINET REMOVAL, NEW PARTITIONS AND DOORS, DROPPED CEILINGS, NEW FINISHES AND CABINETRY PER PLANS FILED. NO CHANGE TO USE OCCUPANCY OR EGRESS