PermitDig

Search Permits

245,623 results

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

16 EAST 17 STREET, Manhattan
1KOct 1

INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

159-38 HARLEM RIVER DRIVE, Manhattan
18KOct 1

INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.

179 FORT WASHINGTON AVENUE, Manhattan
1KOct 1

ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OF EGRESS.

1247 COLLEGE AVENUE, Bronx
29KOct 1

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

1455 36 STREET, Brooklyn
5KOct 1

INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

12-56 CENTRAL AVENUE, Queens
5KOct 1

installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc

539 WEST 112 STREET, Manhattan
11KOct 1

INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

750 THIRD AVENUE, Manhattan
54KOct 1

INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

159-14 HARLEM RIVER DRIVE, Manhattan
18KOct 1

ERECT AN ILLUMINATED BUSINESS ACCESSORY BLADE SIGN REPLACING PERMITTED BLADE SIGN B00940135. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

64 NORTH 9 STREET, Brooklyn
1KOct 1

INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

159-64 HARLEM RIVER DRIVE, Manhattan
18KOct 1

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

268 EAST 4 STREET, Manhattan
1KOct 1

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.

16 EAST 17 STREET, Manhattan
1KOct 1

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

660 EAST 183 STREET, Bronx
7KOct 1

INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

159-20 HARLEM RIVER DRIVE, Manhattan
18KOct 1

TEMPORARY ROOF PROTECTION AT THE ADJOINING PROPERTIES DURING NB CONSTRUCTION FILED SEPARATELY UNDER APP # M00907417. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

340 WEST 53 STREET, Manhattan
1KOct 1

INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.

14 EAST 17 STREET, Manhattan
1KOct 1

INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

7311 4 AVENUE, Brooklyn
5KOct 1

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

1453 36 STREET, Brooklyn
5KOct 1

INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.

59 WARREN STREET, Manhattan
1KOct 1

PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

320 WADSWORTH AVENUE, Manhattan
35KOct 1

Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

301 WEST 118 STREET, Manhattan
3KOct 1

FILING FOR NEW PLUMBING FOR ONE FAMILY RESIDENTIAL BUILDING

85-04 ASPEN PLACE, Queens
127KOct 1

Suspended Scaffold for Facade Restoration and Inspection as shown on Plans

205 WEST 57 STREET, Manhattan
Oct 1

HEAVY DUTY SIDEWALK SHED DURING REPLACEMENT OF HVAC SYSTEM FILED UNDER APPLICATION # M01369175. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

325 PARK AVENUE, Manhattan
2KOct 1

INSTALLATION OF TEMPORARY ROOF AND SUNLIGHT PROTECTION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.

22 WEST 66 STREET, Manhattan
1KOct 1

MODIFICATION OF SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION FOR RETAIL STORE T-MOBILE, SPACE 1570.

2655 RICHMOND AVENUE, Staten Island
14KOct 1

INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.

159 BLEECKER STREET, Manhattan
5KOct 1

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

14 EAST 17 STREET, Manhattan
1KOct 1

PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.

1455 36 STREET, Brooklyn
7KOct 1