Search Permits
245,623 results
CONSTRUCT A 923 SF SWIMMING POOL & 60 SF SPA WITH NATURAL GAS HEAT. INSTALLATION OF CUSTOM SLIDE. INSTALLATION OF 155-FT OF 1.5-IN PE GAS LINE BURIED 18-IN DEEP WITH 12 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & COM GAS REQUIREMENTS.COM GAS TO DETERMINE IF METER NEEDS TO BE UPGRADED. ALL ELECTRICAL TO COMPLY WITH 2023 NEC REQUIREMENTS. THIS PERMIT DOES NOT INCLUDE ANY ACCESSORY STRUCTURES. REGISTERED STRUCTURAL PROFESSIONAL ENGINEER: A
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A HARDWIRED TESLA WALL CONNECTOR VEHICLE CHARGER ON THE EXTERIOR WALL OF THE HOME. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
1 - MESA POLICE DEPARTMENT letters - Face illuminated 1 - Hanging POLICE SHIELD - Internally illuminated, attached to steel provided by others 1 - Wall Mount POLICE SHIELD - Internally illuminated
Emergency Whole Home Sewer Replacement Like for Like
REVISION FOR COMMERCIAL PERMIT PMT23-16211. ONLY UPDATING/CHANGING EQUIPMENT ON #12 EQUIPMENT LIST.
Installation of non-illuminated panel with cut vinyl graphics to be place on existing monument
Please do not request inspections under this permit until 2 business days after permit issuance.Install 240 volt 60 amp circuit to new air handler being installed.
Please do not request inspections under this permit until 2 business days after permit issuance.
Please do not request inspections under this permit until 2 business days after permit issuance.Install 240 volt 60 amp circuit to new air handler being installed.
Please do not request inspections under this permit until 2 business days after permit issuance.Direct replacement of one 7.5 ton AC Gas rooftop packaged unit
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (1) BACK-UP BATTERY, 15 KWH. ONE BACK-UP GATEWAY INSTALLED BETWEEN METER AND MSP.
Please do not request inspections under this permit until 2 business days after permit issuance.Install 240 volt 60 amp circuit to new air handler.
Please do not request inspections under this permit until 2 business days after permit issuance.400 AMP NEW CONSTRUCTION RESIDENCE INCLUDING ALL ROUGH-IN AND FINAL ELECTRICAL INSTALLATIONS
Please do not request inspections under this permit until 2 business days after permit issuance.This is for the installation of (2) Drone setup. Provide (2) 1-1/4 raceways from the lower electrical panels on the police side of the garage. Install (2) 1-1/4 raceways, one to each drone base for power. (2) Core drilled holes in slab so raceways from lower level can get to area were drones will go.� Furnish & Install (1) 20 amp, 120 volt service receptacle near drone base.
Please do not request inspections under this permit until 2 business days after permit issuance.New panel 150 amp. 5 smoke detectors, About 44 outlets. 4 ceiling fans 16 recessed lights 4 regular Ceiling lights 3 outdoor lights 1 outlet 30 amp for dryer One circuit for furniture
Please do not request inspections under this permit until 2 business days after permit issuance.Direct replacement od one 7.5 ton AC Gas rooftop packaged unit
Please do not request inspections under this permit until 2 business days after permit issuance.Electrical for container/building. Lights, receptacles and sub panel fed from house.
Please do not request inspections under this permit until 2 business days after permit issuance.Direct replacement of one 6 ton AC Gas Rooftop packaged unit
Please do not request inspections under this permit until 2 business days after permit issuance.
Revision - Wire new addition.Please do not request inspections under this permit until 2 business days after permit issuance.Wire for new addition.
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (60) ROOF MOUNTED SOLAR PANELS, (60) MICRO INVERTERS, ONE 125A FUSED LINE SIDE TAP, 25.800 KW
Please do not request inspections under this permit until 2 business days after permit issuance.REPLACE DAMAGED 200A LOAD SIDE SERVICE TAIL WITH NEW 200A LOAD SIDE SERVICE TAIL.
Please do not request inspections under this permit until 2 business days after permit issuance.it was labeled as a new residential structure on building permit but is an existing residential structure. wiring a new deck with screened porch
Please do not request inspections under this permit until 2 business days after permit issuance.INSTALL (10) ROOF MOUNTED SOLAR PANELS, (10) MICRO INVERTERS, 4.400 KW
Please do not request inspections under this permit until 2 business days after permit issuance.Perform heavy up electrical service. (200 amps)
Please do not request inspections under this permit until 2 business days after permit issuance.Please do not request inspections under this permit until 2 business days after permit issuance.we only replace the existing electric panel can and breakers.
Please do not request inspections under this permit until 2 business days after permit issuance.IINSTALL (33) ROOF MOUNTED SOLAR PANELS, (33) MICRO INVERTERS, 14.190 KW
Please do not request inspections under this permit until 2 business days after permit issuance.Direct replacement of one 5 ton AC Gas rooftop packaged unit
Please do not request inspections under this permit until 2 business days after permit issuance.Installation of a 18-module, 7.92kW roof mounted solar (PV) system