Search Permits
245,623 results
8th * 9th fl - install of modular phone booths in an existing office fls 8 & 9 existing occupancy are not affected by this work. no demo mep or security work included. structural work included
construct basement wall and make crawlspace area habitable with new bedroom, bathroom, family room, and laundry. excavation and new retaining walls. rebuild back deck to new concrete deck.
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
unknown
84 (N) H V A C Units In (E) Closets. Repair Duct Work As Needed. Main Distribustion Panel Breakers To Be Upgraded. Abatement In Units As Required.
* B W O P* Non Structural Remodel. New Kitchen In Prayer House. Legalization Of Kitchen In Existing Structure.
[A B 2533] Legalize Existing A D U
New Pool & Spa
Kitchen Remodel & Addition To (E) Single Family Dwelling. Lower Level Addition To Include Exercise Room. Deck
Addition & Remodel; Garage Expansion, Ret Wall, Fencing, Outdoor Trellis, Bbq Station
Remove Water Proofing Of Existing Back Deck, Install New Plywood And Water Proof Membrane.
[A B 2533] Legalize Existing A D U
CITY OF MESA ZONING CLEARANCE PERMIT ONLY FOR INSTALLATION OF 24-FT X 56-FT 1987 PALH MANUFACTURED HOME. ABOVE GROUND SET, SERIAL NO. ASIS034X AND ASIS034U, WITH A/C ON THE SIDE. GAS IS MASTER METERED. ONE 10-FT X 40-FT AWNING PER ICCESR 1953. ACCESSORY STRUCTURE ROOF AREAS DO NOT EXCEED THE 100 PERCENT OF THE MH FLOOR AREA. ACCESSORY STRUCTURES SHALL BE REMOVED WITHIN 60 DAYS OF REMOVAL OF THE MH. PER SECTION 11-34-2-B OF THE MESA ZONING ORDINANCE, AMENDED IN JULY 2025. NO OTHER ACCESSORY STRUC
Tenant improvement of existing shell suite 3,160 SF, type VB construction, A2 occupancy for Café Zupas. Modification include interior fit out of suite to create kitchen, serving area, que line and dining area, scope to include (1) ADA and (1) standard restroom. Modifications include mechanical new RTUs and DOAS, Type II kitchen hoods, and associated plumbing and electrical. Existing 1-hour fire rated demising wall to be maintained. Exterior work to include relocation of storefront door. Special
Installation of two open channel lettersets with marque bulbs with clear acrylic faces THE YARD and LED illuminated black aluminum cabinet with clear acrylic push-thru letters mounted flush to existing fascia MILK SHAKE BAR on north elevation 21 sq. ft. and 54 sq. ft. on west elevation. Signage to comply with §11-41-3B2 of Mesa Zoning Ordinance, incorporate a dimming and/or a screening device when using bulbs rated at greater than eleven 11 watts, or equivalent measurement: and not exceed a rati
Install 4 LED illuminated pan channel lettersets FAIRFIELD BY MARRIOTT east elevation 128 sq. ft. and west, north and south elevations at 72 sq. ft. each and 1 LED internally illuminated monument sign, 5' to copy, FAIRFIELD BY MARRIOTT 21 sq. ft. Sign is located at 25' from back of curb of private drive and located out of right of way and easements. New structural and electrical. Signs shall be installed per NEC 2023 with UL listed components. Results in CoC.
This is a full home renovation that involves relocating systems. The 7ft dropped ceilings will be raised to 8ft, ensuring a consistent ceiling height throughout the home. This requires adding beams, posts, & new footers, as seen in the plans. A 12-foot-long patio slider is being installed in the back of the home. The kitchen is being relocated to another section of the home, and is also stealing from garage space for a new pantry. The laundry room is also being relocated by stealing space from t
Roadway & Water improvements for Tailwind Avenue
New 1958 SF, 1961 SF or 1957 SF 2 story residence with a two car garage in Hawes Crossing - Village 1. New electric, water and gas meters. Special inspection for post tension slabs. Electric Vehicle Charger. Structural Plan Sheets updated to reference Village 1 Phase 2. S-2.1: Porch post spec revised: Low Roof Truss Schedule 'E' name corrected. S-3: Setback dimension to truss A65D corrected. SD-1: Foundation chart note updated to "Village 1": new chart added for "Village 1 Phase 2". SD-2: Detail
Plumbing permit to replace existing wet space with new shower in primary bathroom and tub to tub replacement in guest bathroom. No structural changes. New installations will tie into existing piping. No change to overall square footage. No other work under this permit. All work to comply with 2024 IRC and 2023 NEC.